From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C-92-1765, C000-92-1765, C311-92-2061, NUDOCS 9205180019
Download: ML20198D093 (25)


Text

- .- --- - - . . _ .-

GPU Nuclear Corporation Nuclear --

Parsippany, New Jersey 07054 201 316 7000 TELEX 136 482 Wnters Drect Del Number May 8, 1992 C000-92-1765 C311-92-2061 U. S. Nuclear Regulatory Commission

-Att: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Three Mile Island Nuclear Station, Unit No. 1 (THI-1)

Docket No. 50-289 Operating License No. DPR-50 Long Range Planning Program (LRPP)

., Semi-Annual Update of Irtegrated Schedule "ABC" Project. Listing Pursuant to License DPR-50 Condition No. 2.c.9, GPU Nuclear (GPUN)

Corporation hereby submits the required semi-annual update of projects listed in each category (A, B, and C) as defined by the LRPP' integrated schedule. The attachments to this letter include: 1) the ABC project listing; and, 2) a summary of changes since the last submittal forwarded by GPUN Letter No. C311-91-2118, dated November 5, 1991. An abstract of the attachments-follows:

1. Attachment A - A new project listing of Category A, B, and C projects annotated by an asterisk (*) to identify new projects and by a double asterisk (**) to identify changes in Budget Authorization (B/A) number assignments. Completed projects have been removed from the schedule listing. Remaining projects are ongoing or are scheduled consistent with cycle / year commitments.

Any changes in schedule are reflected on Attachments A and B.

l l

E l

31192061.tET 920S180019 920509 l PDR ADOCK 05000289 '

I R PDR.

GPU Nuclear Corporation is a subsidiary of General Pubh Utd, ties Corporation i

5, > ,

C000-92-1765 C311-92-2061 Page 2

2. Attachment B - A summary listing of Category A and B projects which have been completed, deferred, changed in scope, or otherwise changed with explanations, as appropriate. The listing also contains Category C project completions. Changes to the Category C scope or schedule do not impact the Category A and B schedules.

The Category A project schedule for implementation of 10 CFR 20 has been extended. One (1) addition to the list of Category B projects has been made by this submittal. In addition. Attachment B describes two (2) changes to the list of Category B projects affecting schedule, and three (3) project identification changes. Pursuant to the LRPP for TMI-1, GPU Nuclear will assume that the NRC is in agreement with tia above Category A and B changes, unless we are notified otherwise within 15 days of receipt.

Sincerely,

/

./

,4 p

R. L. Long Vice President and Director Corporate Services RLL/GMG/ pip cc: Administrator, Region 1 TMl-1 NRC Project Manager Senior NRC Resident Inspector 31192061.LET

'O ATTACHMENT A THI-1 PROJECT LISTING INTEGRATED SCHEDULE SEMI-ANNUAL UPDATE (MAY,1992) 1.

i-'

t.

1 I 31192061.LET

~

/

TM i -1 PROJECT ~ L ;STI NC

= . - -

t..EGEND '5


NEW PROJECTS

' N R 'C ' 1 NTEGRATED . SCHEDULE

- - - - - - - - - - - - - - - - - - - - - - - - - - - + - - - - - - - - - - - - - -

4 **' BA NUMBER CHANGE-CATEGORY 'A' PROJECTS i- . STATUS._AS OF

- SORT B_Y C_A__TE.

__. GORY

___ ___ _.___ __/ CYCL __E/BA ___.___.- - -_- -- _______.___ .___.-- - . - - - --- _ _ . = - - 04MAY92_;

NUMBER- YE
.1 126236 ** REVISED 10CFR2O IMPLEMENTATION 92/93 NRR l 10CFRPO MPt.EMENT REYtSiON TOR PROTECTicM ON BY MODI AGAIN T RADIAL (STANDARDS YING SOFTWARE, PROC DURES & TRAINING 1

I 4

4 Y

i-4 i'

l 1

1,

.~:

i l

4 4 ..

i.

a' 4

4 4

l 4

r ~ ~- " '" #' ' '-' * ' ' ~ *~'* "' " " " ' " - ' -

A

s,.

Jw

. I N

" T M l . .1._P R O__J.E

.. .. .... .. C__T_.' .' L.. _I .S__T ....G.

" LEGEND NRC I NTEGRATED SCHE.DULE .

    • -BkNUM k ANGE

. CATEGORY 'B' PROJECTS

_ SORT BY. CATEGO.RY/

........_.. CYCL.E/C_A

______ . _.- _ .... . .......__.' ._...-- ==---------

STATUS AS OF 04MAY92 i' NUMBER- 'YE

. ...._... ..... .. _____.... ____.... ._ .. .-- == -

i

)

l 2 128155

  • SOLENOID . VALVE /LIMi f. % WITCH UPGRADE 09 NRR i kh A h kh89Dbl R
  • Ek
, .PEkkGbSu.DEk. & 10C R 56 43 i 3 123IYX ' REACTOR BLDG TENDON SURVEILLANCE' PROG ' 10 NRR I

PROVIDES FOR VF$tDM SERVICES AND PLANT l SUPPORT F M N GT TENDON SURVEILLANCE l 4 123287 MAIN STEAM SYSTEM TEST - 10R. ISR NRR l' RB ~

PERF HYDRMTATIC TEST OF OTSG,-MS

..AND P IP ING. . REQUIRED BY 10 C 50.55 5 123289 ILRT RB 10R IGR NRR '[

INTEGRATED LEAK RATE-TEST .

4 OF CONTAINMENT - 1993. .[

6 123290 'OTSG TUBE PLUGGING - 10R 10R NRR [

RB >

P UG OTSG Tg gS gS N Cg SAR{ PLAN FOR r

NbUGb N & 10 UG INB(kOEEbic'  :

7 -126231 ** OTSG EDDY. CURRENT TESTING 10R KRR

]' RB -

.i

QT*EROF . TSG AMPL ECHINSPE SP ION INS DN; k COG IN PECT ONS,PO SLE 8 126234 ** TMt 1NSERVICE INSPECTION 10R NRR  !

. A >

ASME CT'XI - AUGMENTED ISI '

TO C LY WITHINSPECTIONS,55 10 CFR 50.

i i i t

'[

d L

) t l' [

c l'  ?

1 I s

4 f

i .-

4

,. . _ . _ ._ .~ _ , , __ _ ~.

"?

, -O

' T_M__!

__ _ __ _1_' _P_ _R__O__J__ _E_C_ _. T_ _ __L__ _

_i __S__T_;_ I _ _N_O I '

LEGEND - . - -

NRC' i NTEGRATED SCHEDULE --

['

  • N h ANGEL

~ ~ ~ ~ ~~

~

~~~~~~

~

. CATEGORYd8' PROJECTS

. SOR_T

_ - - BY C.A.TE.GOK_Y_/

. - ___=----: CYCLE /BA - _________________..___________- .__ _, ._ - = .. - _____ STATUS =-AS-OF - 04MAY_92_;

=--_- _ .__. .

NUM -

Y '

_ _ _ _ _ _ __ _ B _ER_ _ _ _ - -

. . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ = - - - -

_s_ -. -- -

-=- - _- ---__________- - ---_ -___________

i .9-L128155 SOLENOID VALVE /LIMil SW1TCH UPGRADE 10R , - NRR

, REPLA E COMERCI GRM IMI SWITCHS i' AND 1 R ENOID VAL ES ash"0(C Wl H NSR

' VALVE F REG GUID 1.89 c: -10C R 50.49  ;

10 412611 REPLACE EIM MOTOR ACTUATORS 10R NRR RT M MO OR ACT A

~

E S'WITH tin M OR A TUATOR sex V

  • 11 -

LS TO i PRO E GY C PABILt 1 PL_R GL -10.  ;

11' 123B11 OTSG TUBE PLUGGING 11R NRR

! PLUG TSG TUBES AS NECESSARY. -j i -

1

12 -126K11 TMt NSERVICE INSPECTION 11R NRR  ;

TO OM Y IT b $5  !

f; '13 128097 ~ SQUG USERS GADUP PROGRAM SS-93 NRR

""Y 1

e FA'N'MMblR92 "

i lis 412596 TMl-1 INDIVIDUAL, PLANT EVAI.UATION 89-93 NRR I i iN Rg"*AC VITIES [

j. 15 128108 tRl/usf!Y!EgADED_4Mi TF SEISMIC QUALIFICATION OF EQUIP r " '^'-

89-96 NRR

{

-kbU7eN#bNkMA 0 Q l- NRbGL87-02&LAl 87 R9084.

4 j- t L

?

I i

_ , y _ u.m..- p , g p._ ~.p,. ,.__e 4 -#- y , , . _ ,m -

,.,..,_y- g.. , . - . ,

t

- ?

e T _ M_ _,. ..1. .P R__ O_ _ J__.E _ C__ _ _ . .L._ _i t.

i NG

~ . _ _ .

LEGEND NRC L 4 *


--_ -- - -NTEGRA

_ - - - - _ - _ -_ - _ T E E_ - - _S---

- - - - C -H -f_;----

D_ _t, .

  • N W PRO CTU
    • B NUMB CHANGE CATEGP # M' PROJECTS ST ATUS__AS__O_F

___ ___ O_EW9_2__

._g__.____.._____.

SORT

__ _ _BY_- . .CATE.

_ _ _ _ GOR.V/CYC_L_E/_BA_ _____ ____________ ____________________

'YE s

_ _ _ _NUMBER 90-94 NRR 16 12S152 MOV PROGRAM l

DV OP & IMPLEMENT MC" PROCRAM Tt t.E ET l C -10 R F. MEMD C311-90-3132,C311-89-2117 9E NRR i 17 419233 ** S I W . <T'H MOD i f l CAT I ONS - TM I (1992)

UPGRADE SIMULATOR CONSISTFNT WITH CONTROL POOM MODtF4 CATIONS.

92-96 NRR 18 412617 TM! IPE EXTERNAL EVEN'S EXTERNA P

E RFLPM HTS - RTH F:IP ANJkVS(S TT. h.. FC 11-91-215 &

i I

L 91-923 ,9 9.

93 NRR 19 41993P SIMULATOR MODIF ICAT IONS - TMl (1993)

UPGRADE S:MULATOR CONetSTENT V6TH CONTROL ROOM MOOfflCAYiONS.

94-95 NRR 20 41994H SINULATOR MODIFICATIONS - TMl (1994)

OPCRADE SIMULATOR CpNSic CONTROL ROOM MODifi.ATfI' NS. TENT WITH l

l l

F

+

L----- m . g yyc

~

t s ..., .

q

, e ,

' T M _f _ ' 1 P R O J.E.C..'T_--_L_' I.S__T 'l'N_G..

1 LEGEND N Fi C cl N'TEGRA r D- . SCHEDULE .

    • 1 Nk NhhNk bhAMGE -

t l CATEGORY 'C' PROJECTS 1 SORT..B.Y C_ATEC_OR.Y_/CY_C_L_E/B_A__ ___

STATUS.A.S OF 04MAY92;- ---

p .__---------- ___---______----__-- g 7_'___.--_-__________.

.------___.=--  ;

NUMBER -

Y AR

. . . _ _ _ _ _ _ _ _ _ _ - - - - - - - - =_ _ - - _ _ _ _ = ...

21 128128 OTSG g MICAL CLEANING WASTE PROCESSING. 09 MRC

'A DbbRN 9k3kMi OA G 22 128148

  • ERO**ON/ CORROSION PROGRAM AND INSPECT 104 09. MRC INSPECT P10!STURr DOWNSTREAM OF M5v-1SEPARATOR VALVES DRAIN PIPING 23 '225011 TMi-2 PDMS ALARM MONITORING BY TMI-1 09 NRR

, NkkihO ikOk 2 1 kSh

  • 24 412AFP / INTERMEDIATE BL.DC' VENT UPGRADE '09 GWC DchtRMiNFiWD5:MHANOaN NECESSARY.

25 .41207'6 POIS N FUEL RACKS-POOL A- 09 NRR' HB ET4$TYEEA" 26 412577 ADD'L TUR ' BLDG. & INT.. BLDG, PLATFORMS 09 ISM TB Mk!Nkk$AN ANDBWST.IN Tf0kMS NE kb8 BLG 27 412620 RADWASTE STORAGE CAPABILIiY 09 NRR kh NbhbTkblEN 90-09 rcS11 b5. (kH PHAS 4

i

.w -

v W m- a ___----m_

f T

_.. M..i. .1_.F..'.l.O.J.E._C.T. . . _.L. . .i .S .T. N..

. _iG 1

LEGEND NRC I NTEGRATED SCHEDULE - ~

9

. HEwtaginclsuGE N

CATEGORY 'C' PROJECTS STATU S._ AS_ _ OF, _0_4M.

_ . .._ AY9 2_ _1___

S OR .T_ D_Y _C_ A_ TE_ G_O_ R.Y./.CY.C.L_ E_ /.B.A. . . _ . . _ _ _ _ . . . . . _ _ _. . ._ _ _ _ . ._ _ _ _ _ _ _ . . _ _ _ _ _ _ . . _ _ _ . _ _ _ _ _ _ _ _. . . _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _

YA NUMBER 09 MRC 28 412625 -* TOXBORO RECORDER REPLACEMENT kAkkk ABbkA A R MAINTAlkMOR 09 GWC 29 412628

  • REACTOR BUILDING TAP CONNECTIONE-kNEA Of bL hPkk RfAC BUILDING COOLING 09 NRR 30 -418766 THI-1 L!GHTING ENHANCEMENT MPROVE HE SECURIT LIGHT NG AROUND THE "Mi-1 MA N PLANT M A AND EANIN N[cTALL lTS. LIGH1-NG @ TH CHEMICR 09 REL 31 418771
  • LOOSE PARTS / NEUTRON NOISE SYS UPGRADE UPGRADE THE EXISTING (OOSE PARTS /NruTRON NOi MONieCRING SVSTtM WITt B&W LEM iv SY$ M 09 MRC 32 418794 PLANT PRESERVATION - BOP (CAPITAL)

TB 18 PAINTING, CLEANUP SCAFFO{D*St!RFAPRETR{THENPREP, Of WAL BLDG 09 MRC 33 4'*797 ROOFING REPAIRS 1992 REMO E AND I NSTR W ROO ING ON :

AUX LDG BOTH RO F R I' R SCREEN HOUS AND(WASTE f4U AllZE TANK BLDG 09 REL

    • IMPROVE PLANT PAGE SYSTEM 34 418801 REPLACE o? PROX 300 EXISTING HANDSETS THROUCNOUT MAlf4 PLANT & OUTBUILDINGS.

L _ _ _ . _ _ _

M

. . 6 TM . i." PROJECT .L I.S T. I NG

~LECEND .

->NRC .-I N T E G R A T E D " SCHEDULE

--- --ggyggsicLCE -------------------------------------- ----- .-- '.

CATEGORY ~'C' PROJECTS

- SOR.T.B_Y C.ATEGORY_/CY.CL_ E/_BA. ___. .

STATUS __AS.

. ...__ _. _ . __.....-....____________...________ ._______...___...... . OF . 0__4MAY__92

__ .- l -.

Y

____N ... U MB.Et.1 .....____________ .____........._ _. .________. _________ ...._____. _- ......__-.......___ _____ .. _... ___.... ____.

35 418803

  • TMi-2 .

, LIGHTING ENHANCEMENT '09 NRP.

PkN A 36 419d33 UPGRADE DOMESTIC WATER SYSTEM (M't-172)- 09 FAC.

XISTING DOMES WATER SYST2M;IS UPGRADL AS NE ARY. MM-1 DE.THE WATER IMENT PLAN .

37 419'89 ROOF REPLACEMENTS 09. . FAC-Wk b o5st P AN.b Y OU E

  • 38 419700 IMPROVE NOB OUTSIDE AREA- 09 CWC iMPROW THE AREA cuTSIDE THE NORTH OFFICE BUILDING.

39 -419710 UNIT 2 ADMIN BLDG 09 FAC C bD Cb b $

40 419723 ** SECURITY EQUIPMENT - TMl 09 MRC AREA-RgAC{MgT BONS

  • L ATHOFEE^R&St TURNSgDVITAc2tE A #cR%tM 41 419724
  • CONSTRUCT MAINT TRA!NING LABS 09 FAC PRC FOR MAI T TRAINING LABS IN TING STR CTURES '

+

4 6

e t

, e -- kn --- =__2m

3, sc-l; T..M

.... - l ' ..1.N... . -

N.

P .R..O..J.E..C.. T.. .3.L._ I.S.T.. .i ...G' LECEND: -

'NRC i N T E G ET A T E-D .S C H E D.U L E , ..

ggC{S


BkW

  • N ,

' CATEGORY.'C' PRCJECTS SORT BY CATEGORY / CYCLE /BA. STATU5'AS OF 04 HAY 92;

.g ...._.......-..........- 6Ei-~~--~~~-~~~----~~~~~~~~~-~~~~~~~~~~~~~~-- m- n- E7"--------~~~~---~~~~~1---~~5-------~~~~~------------

..... NUMBER................................................................Y.EM..S.....................................................

42 412AEA- ADDITIONAL MULTIPLEXERS 10 - IOE

- TB AUX AN5^%8xS"fN'ih CONTROL' bldg AND PR5v(VA %Nb' hGON AUX BbPLiES iDt eOwER Su ,

43 412AGU '* RADWASTE STORAGE CAPABIL PHASE'P&3 10 NRR.

PROCUR EQUIPMENT'AND CON TRUCT STORAG CAPABILITIES AS h QUIRED BY NRC IEN 90 09 GL81-38. (PHAS 1) i 44 412605 RMS. EFFLUENT.QUANTIFICATION- 10 -REL ROUT E CABL $ FROM CR REM OUT PANELS ANQ

. AUXI ARY Dil DING TO THE PLANT PROCES

- COMP 3 ER I TlE CR. t

45. 412612 PERM DEMIN SYST IN PRLL W MISC WASTE EVA 10 - IOE

. N AL P RHANENT -60 CPM DEMINERE1ZE ST(tM N PARALL WITH THE.hADW4STL 1 WAST EVAPORA 46 412615 TURBlNE/lNTERMEDIATE BLDG'PLATFCRMS: 10. ISM

[h NOCO.hfR RMA ?DNkikh

,fbkS M$ b N lSOL ALVE,- C h,

47 123DDD OTHER OUTAGE RELATED ACTIVITIES 10R ALL OUTA ALL'gATEgAC}

R{ ITIEg.yCiAg ;i HIhD MODakICA ONS,'Mhb Pk5kY, kfC.

48 123294 RX RggUELINC .10R 10R PRC 68 NEW FUEL. ASSEMBLIES, LOAD FOR

85 EFPD t

t v

I k

o d 4 + .<es

.T_- M.: .l _: .' ___

_ _ .1__P R.O..J__E__C_ _T. .__L. .i S_.T.__1_N_.G LEGE23 NRC l N T'E'G'R'A T E D

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

S C'H E D U L E . ..


BkNbMkkCANGE' CATEGORY 'C' PROJECTS' SOET bY CATEGORY / CYCLE /BA. .

STATUS AS OF 04MAY92:

OBS DESCRIPTiii. CLASSIFICATION Bg C{Cpj/

______. _________...__.___________..___.... .._. .. ________________.. .___._m._...__......__....___________....___..._______ ..___

49 123315 REPL CRDM FLANGE' GASKETS / BORON REM 10R ~ 10R MRC INS?E T FM ORO AND REP P 13 18 CROM LANCE Ash TS (35 R N RE-MOVE ORON D POS TS FRDM $ REQ'D.

50 123316- M*.IN CONDENSER INTERIOR COATING REPAIR 10R MRC 3

INSPECTION' AND REPAIR OF WAIN DETA'Q[DaER COND COATING .

51 123319 ** RX BLDG PRESERVATION' PROGRAM 10R MRC.

PRESERVATION IN THE REACTOR BUILDihG l

52 128148 ** EROSlON/ CORROSION PROGRAM AND INSPECTION 10R MRC ,

ii THE LONG TERM PROGRAM AND T AUGMENTED-lNS IGNS (O DE-T TMI-1..(GL 8 ) I 53 412AEY  ?OR MRC t HEAT { DRAIN PIPING REPLACEMENT REP A ITH COMPONENTS I OR -hlSECEkOEkOSIOd

{R DEg gD {fPINg fCORROk OA 54 412536

  • DIGITAL INST AND CONTROL MOD 10P. ISM . i 10R I O I NTRO FOXBORO.1/A INTO THE PLANT EPLACE CTED NNt ikC ,

SELEC E RCP & . BALANCE.iN(MV AND 11R-13R .

55 412570 REPLACE CASEOUS CHLORINATION SYSTEM 10*. ISM j RIP OUT OF CHLORINE DETEC'lON SYSTEM

- FROM THE CONTROL TOk'ER.

I I

i 5

.5

-er* y w

"'2W4 4

TM i-1 PROJECT L 1LS T LNG _,

LEGEND' -

~

N R'C ~ tNTEGRATED

~ ~~ ~~~~~ ~~~ ~~~~

SCHEDULE

~~~~~~~


BkN@hh

    • hANGE:

CATEGORY 'C' PROJECsS SOR_T -. B.Y C.ATEG.vR_Y/.

... . _ --_ ------ CYCL _E/BA ___-._..__....__-._....._ ......._. . _--_- _------------ .. STATUS ----

AS.O..F , Of4MAY9_2

..E

.......N.UMB.R..-...________--_.-...........----..__.._____.._______.-----YE_.....--__-.....___--............__--....---_-_--_.... --

56 412604 CONTROL ROD REPLACEMENT - 10R 102 MRC .,

RB -;

N RhD N 57 412612 PERM DEMIN SYST IN PRLL W MISC WASTE EVA 10R lOE A C b Wil.L b0 kS / MINI-Mb YC kk 1 F bkk 58 412622- ** OTSG TUBE SLEEVING 10R REL

-b RgWEDG k010h 59 -412623 '**FOXBggoTRANSMITTERREPLACEMENT 10R NRR REPLACE 1 X ORO PRE E& ,lFF PR S TRANSMITT R ARE As WITH ES 8 01SG LEVE D C AND C - ROL de 4 4/ R .

60 412626 ** UPCRA)E SOURCE RANGE MUCLEAR INSTR (N1) 10R MRC C RB bN EO CHAf4NLS;ROUTEbABLEF kk b ChAMb NS bR'kf ' 12 t i

61 412627 ** HSPS UPGRADES 10R REL I MOD lF HSPSpYA{DINGSOgENOlg FUpf, F kk ARR kR NND % b COM U d ALA MS i 62 412629 ** MAIN & AUX F.B. '.RBLE FRLQ DRIVE'SYS .10R REL R LAC THr EXISTING THYRISTOR )R IVE M OR ONTROL ON 14AIN & AUX FUE HANDLNG

, B GDE W/ VARIABLE FREQUENCY S5EED SYS i

i

..n I_M_1Z_.l__$_$_9_$_$_9.1__. I ' ._3. 1_N,g.

LEGEND -

.-NRC 1 'i T - E G R A T E D .

~ ~ ~~~~~~~~~~~~ ~ ~~~~~~~'

.HEDULE

~~~~~~~ ~


Nk

  • N 1 h hANGE CATEGORY 'C' PROJECTS SOR__T B_Y C_A_T EGORY/_C_YCL_E/BA__ ______ __

_ ____._ _ ______________________________..______ . ___________________ STATUS __A! _O__F_0_4MAY_92_

NUMBER YEARS 63' 418800

  • RC-P CARTRIDGE SEAL NONVERSION KIT-10R 10R MRC i t C kE NMB '

64 '123GGG OTHER OUTAGE RELATED ACTIVITIES 11R ALL

. UTA LATEg'ACT4

  • ITg UCH Ag MN MO ICA , MOD- f, TC.

65 123J11 **RXBglLDINGPRESERVATION, 11R MRC PRESERVATION OF THE REACTOR BUILDING ,

66 128A11 11R NRR

^

    • STEAMEROSIONINSPECTION  !

l#8 h 58Een28EfIAA"8r' M 96ETtMS 67 412AGD TURBINE SUPERVISORY INSTRUMENTATION 11R MRC 8E f -

68 412608 OPTIONS TO REDUCE IRON TRANSPORT TO OTSG- 11R MRC ,

^

S

"'YA1 VEc M i87S0 bORRkuklVk ACTIONS E k'E"C8' hlNi>; k ' "Y "b"'OTSG CRUD 69 412609 DIGITAL TURBINE CONTROL SYSTLM'(DTCS) 11R REL hhh fghg[7NNkOhgC,yLg[gDr -

6 a

f 4

4

.s.,,. ,.3 -- --

e, , _ . .

s-T.M I 1 .P'R~O J E C T LI STl NG LEGEND

'NRC i N.T E G R A T E D. 'S C H E'D U L E . ..

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

' * . kN - h CHANGE ~

CATE00Rf 'C' PRO.!ECTE kMT BY CATEGORY / CYCLE /BA- . .

STATUS AS OF 04MAY921  ;

EOBS - A DESCRIPTION

... . .NU.B.ER._'_.

.__- ...._..... .__'.-----.- __.-___.______ ....._______. CYC E/. YEA S __. . . .._____.___ CLASSIFICATION- -.-__ . _ _ _ _ _ . . _ _ _ _ . . . _ _ _ _ _ _ . . = --

70. 128114- EPRI' STEAM GENEhATOR RELIABILITY PROGRAM 88-94 MRC

, C3-FUNDING FOR EPRI SGRP TASK 404, 71 412536 DIGITAL INST AND CONTROL MODS 88-99 ISM-  ;

)EV A Y M CONFIGURATION TO 4EP 'TH /NNI SYS1EM WITH A

)iG , CO T ' SYSTEM 72 -123262. PELIABILITV CENTERED MAINTENANCE' PROG 89-95 MRC tMEAU 10N OF PLANT SYSTEMS TO

) FIN 4A T. ACTIVITIES THAT IMPROVE ,

1 LIA 1_1 .

'73 126220 EVALUATION OF WAREHOUSE STOCK - TMI 91-93 IG2

-P RF E gL CgNCERg g X sag TY C'_A NO h$kkN . kb SNP. COMk bRADf b.

74 126223: TMl' APPENDIX VIII QUALIFiCATlON 91-94 NiiR TO PAY FOR UPCRME TRAI ING & TESTING PROGRAMS DEVEL.3Y ONTRA TOf3 FOR OUAL &

CERT OF UT NDE INS ECTOR Pt.R APP VI i i 75 128151 CAVITY DOSIMETRY ANALYSIS 91-94 NRR HIP IRRADIATE N9R-ANDANALgZ{AVITYDOslMETRYREMOVEu 76 412591 1991 CONFIGURATION MANAGEMENT - DBR -91/92 IGE DESIGN BASIS RECONSTITUTION 1991 t

t

'(

i i

P I

I

, D. _ - . _ _ - _ _ _ - - - -

Y h

LTM i

...__. . . ...._O

.1.'.P.R . .J_E.C

. _ _ T'__L.-.1.S..T.I N G ELEGEND

.N'R C l N'T E'G R A T_E O ' SCHEDULE . ..


kNUhkChANGE, CATEGORY 'C' PROJECTS

- SOR F BY CATE. GOR.Y/. CYCL _E/_B_A _ ___ .._ . ..... _____. ..__ . ......__._. ... STA

.. ____ .._ .. . .._ _ __ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ _. _ _ _. . ._ _ _ . _ _ T US__

_. A_ S_ _O_ F . 0_4_M i7 -122026 COMPONENT SPARE PARTS BILL OF MATERIALS 92 105 OF TrQHNISNI9'in'PLEtA[ElAL YSRIF AND DA A k.NTRf2 4%EXISTl^"'

5^nRMF NS E e o!

78 126237 ** "**#ATOR-TRAINING ANALYSIS 92 NRR

f. T ANALYSIS OF AO,CRO,SF/SS

& ONS R NCE: NUMEG 1122 79 128161 1992 TN1-1 CONFIG. MANACHNT - SSF! 92 ISM -

t bb 0 k l R 80 418755- RC-P SEAL CARTRIDGE TEST.EQPT. 92 REL PURCHASE CARTRIDGE SEAL TESTER 81 419232 ** SIMULATOR ENHANCEMENTS - TMl (1992) 92 REL OPSIMULA 'ct'?f2 Egg{Q gl y SUOFEDE'YS?hf,TONCAPABl.ITik{s.gpT ND .t-82 128ACS CulDELINES FOR ABNORMAL TRANSIENT PROC 92 BOE kkhkOV Nb k b USEDINhN*klNINb,.kkkkbfbkkTPkS,kTbE EVAL-PROC CHANG f'~ .

83 412618 ACCIDENT MANAGEMENT GUIDELINES (AMG) 92-94 NRR  !

^

k h'R kP 00 DAMAG hENSRSXEktY8C8DE"BVTRY

'l r - - a

T '

+

. _ _ M_ _' _l ___ ______

_'_n

_ ' _' P _ R O J_ E_ _C_

__ _- T _ _' L_ ' _i S_ _ T I .N_ _ G

' LEGEND - -

NRC- I NTEGRATE.D SCHEDULE .. ..

2 ggwt.nggsclgiNGE N

CATEGORY 'C' PROJECTS SORT _B_Y _C.__A.TEG_O_RY./,CY_CL.E/.B_ A..

__ _. . . . . ____ .. . _______. .____...__________________ ______________________. ____STA_T_US__AS O_F _ 0_4MAY_9_2.I.

_____NU_MBER.........______.____...____.________________._______._______YEM.S__'___________..._________._________...____________

84 412624 ** CORE MONITORING. SYSTEM UPGRADE-~ 92-94 ISM Ig TA ' '

AD DDI NEW(NGSAIX{pMARtilNTc R I ThKNR l SFTWAR{THA 85 126101: PLANT LIFE ASSURANCE / EXTENSION 92-95 REL kASkBibiSh'OfkXTkND7Nb ATING 86 128160. D&W OWNER'S GROUP PROGRAM - ' 1992/93 92-95 NRR PARTICIPATION ~ lN B&W OWNERS. GROUP PdOGRAM 87 412AEG FUEL UT EQUIPMENT FOR- REACTOR B' OG 92-95 REL hh8Th0' S The E.!ViFUELRObShb.? k ks

!bkkEAckOkault$TNG bk hf-88 412592 1992 CONF IGURATION 6'7'* 7 CEMLNT . DBR 92-95 IOC DESIGN BASIS RECONSTilt' TION If 92 89 128166- - ** CGMPONENT DATA BASE EXPANSION 92/93 IOE ENHANCE THE EX1 TIN ENG D ASE WITH SUBCOMPONENTS ME T THE MAINT & OPERATI NS RGANI DO 30F PLANT.

3 90 1220?! DEMOBILIZATION SOUTH OF THE DlKE 92/94 GWC 867[8?AIS2N8F{gy{yM{g{,ygT{lAg, r

i

'I*

=

6 N

T_ M.'

. I ...1.. P -- R..O..J..E..- C..T. .' . .L..'.t. .S.T..l

. .._G_

L LEGENL- .

N~R C1 I NTEGRATED' SCHEDULE- .* .

I A* - BkW N { g/gCfg OATEGORY 'C f PROJECTS' l '

-5

..T.B..Y.C. A.T EG.OR.Y./.CY.CL_ E/B. A..-

g.. ...--- .... . . ........... ......- 7. - ,---- ... ....-_. ..-- _..... .- ST AT US.. AS.O..F ....g 04 MAY92.1 7g7. 7.

g

____.-. NUM.BER...........

.- ..............__...--.....-___ ---.. .. _- .......YE.R... . ... -.....-----...- ......- ..-...__ ......-_. ._. .

91 128163 DRAWING ENHANCEMENTS TMI 92/94 M9C L

kW{GfBiglJVO{APigpggMAT-DQGk k 3.RfDhAWSkNARRkNG INb4D- OkMAT.

92 -419669 TMI ROADS UPGRADE 92/94 FAC hbRD MPROV AEN RhNbOk 2 XH CH 93 419707 OUTAGE FABP* CATION FACILITY 92/94 CWC L DESIGN r AB AOT ATI DC S(TRUCT OH PLANTFAC1 QQS ITY TO AND SUPPORT.

MAINT.

TO RErL LE ST DELAP!DA tu $ HOPS.

94- 412AGJ PRESSURIZER' HEATER BUNDLE REPLACEMENT- 92/95 MRC R PLAC LOWER PR SEURI E T R B NDLE W TH N W BUND (E F ADF R ESI N.

R PLAC CABLEo T FIRS U i N B X.

' 95 12693A EVAL OF'IMI ALERT & NOTIFICATION SYSTLM 93 MRR hfMbkAhfb sTILL PENTINb FkMA hbbk kH f Nrb^T5SINSuRE REQMN!';

96 418 ROOFING REPAIRS 1994 93-94 MRC

'pMOVgAND I STA R bh ANb b! Eb GEN B bGggWR0sr}NCgN '

97 12694C MAINTENANCE TRAIN!NG ANALYO f S 94 NRR f4DkkCHAN A NPO'kCCkkDlkk6hkOG S

- - _ -- s-

.F

~

p.<

-T H' _ _ _I. _ .; .1__._ __-

P. .R.. O J_E C.T... L..M.!S._T_ .i .N..G '

LEGEND PROJECTS' . ----------------.R'A

-N'R C- 1 N'T E G


---------.H T.'E D S'C .-. E.D.0 - .----

LE . - ,'

NUHf4ER CHANGE'-

CATECORY' . 'C' PROJECTS

-SOR..T.B.Y' C. . AT..EG.OR.Y/.

. ... . _ CYCL.E/.BA__.. .

......... ._.... ...........-_.--... ._---.... ......... STATUS _:_.A_S

...._.O.F

_ ...f4MAY.92_*

..___ ...... NU 'ER ._._ ......._-... __......._... . ...______ _ -- ....--- _.

.. _YE_ .. .. ___-.._...._. .._-_....._....___-...______..._,.

. 98- 412552 SQUG MODS'- 94-95 NRR MODI ATIONS TO'C MPL W QUAll ICATIONS SC PE O FINAllZ AFTER USI-A-46,WLK OWN .( HBASEISMf"ID F 128108 )

99 418750' SERVICE BUILDiNC_ ADDITION 984/9 5 FAC CONSTRUCT AN ADDIYlON TO THE h*)RTH' SIDE Of THE SLRVICE BUILDING i

s a

t di 5

4 h

+

t b

t 4 + + w av , e

ABC Classifications a) Meet NRC Reauirementi (NRR) - Activities that a) must be carried out to fulfill specific NRC requiremenf.s or b) have been committed to the MRC by the Company cr c) are such : hat if not accomplished would result in an NRC non-co.npliance eve thcugh the specific activity is not required by the NRf,.

b) Meet Environmq_ntal Reauirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been conunitted to envi.amental agencies by the

- Company or c) are such that if not accomplished would result in a regulatory ncn-compliance even though the specific activity is not required by an environmental regulatory agency.

-c) Meet _0ther Reauirements (ORR) - Activities not covered by the NRC or environmental requirerents but chat are required by local, state, or i federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not l accomplished would result in a violation of that ordinance, code or

_ guidance, court order, etc.

d) Increase Safety Heroins (ISM). - Activities that, if implemented, will improve nuclear- plant or personnel safety but are neither requireu for replatory compliance nor required by safety regulations, codes l or guid6 ace.

! e)'_ Decrease Environmental Effects (E) - Activ"'es that, if implemented, l will result in an inproved environmental q, y but are neither required for regulatory compliance nor requu ed by environmental regulations, -codes or guida..ce, f) Imorove Radiolooical Conditions (RI.J) - Activities that, if implemented, will result in improved radielogical conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by rsdiological L regulations, coces or guidance.

t i g) Maintain Reliability /Cgnability (MRC) - Activities i- t, if l - implemented,.will maintain power production at exist ; levels by I

- preventing deterioration of plant systems o, equipmte . Includes

!_ activities in'respou e to national codes and standa:,s, insurance l policies, equipment vendor specifications or nuclear industry high uni.vailability equipment data without which the plant could not operate prudently, h) Imn ove Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.

L1192061.LET 8

ABC Classifications (continued)

Imorove Operational Effectiveneti (IOE) - Activities that, if i) implemented, will improve staff efficiency or provide s direct econcmic payback in terms of reduced operating /maintenanca costs.

j) Imcrove Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities.

Provide Continaency/ Blanket (CUI) - Activities that, if implemented, k) will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace e epair minor items essential to support routine operations.

1)

Imoroves H?at Rate ferformar.ce (HRP) - Activities, that, if implemented, will increase pcwer production by enhancing the heat rate efficiency.

3119205~.LET

~--"'-~m_._ _ _

g- y .

9' ;? ^: .

. ATTAQ9 TENT B

~ '

CHANGES-T0 1MI-l NUCLEAR GENERATING STATION INTEGRATED SCHEDULE-SEMIANNUAL UPDATE (MAY 4, 1992)

- CATEGORY A PROJECTS

i?

Additions: None

~

v Completions: 412462 AnticipateTransientW/0 Scram 412567-Station Blackout Deletions: None LSchedule Changes: 08S--I - 126235 Revised 10 CFR'20_ Implementation - Schedule

revised to E be - consistent- with commission extension for standards to go into effect January 1,1994.

-Other Changesi Budaet Activity (BA) Number Chanaes

~

. The following - BA numbers have - been- changed. There is .no-change in scope or schedule associated with these changes.=

bas which have had their numbers changed are indicated by a **

in Attachment A..

SSS Previous BA Number Mgw BA 1 12692L Revised 10CFR20 Implement 126236 t.

+

1

,a W

S$.L e w , , , , -. , ,

<< ,-. , , - , --n--

3 '

n

{} - *'.

ATTACHMENT.B (cor.linued) -l QJLGORY B PROJEC15 -!

l l

r Additions:- As tenoted by

  • next to the pro. ject title in Attachment A.

Completions: 123275 0TSC Tube Plugging 126203 Outage 9R RV ISI-

.126217 OTSG Eddy Current Testing 126219 TMI Inservice Inspection (Outage 9R)

-412556 TMI-1-Control Room Alaru Enhancements-412589:RCS Shutdown Level Monitoring

  1. 12502- RMG 22/23- Power Feed Upgradt-419219LSimulator.-Mad W ations - 1991 Schedule Changes: R8108 TF Seismic Oualificatica of-Eautoment

' This schedule was extended to 1996 as previously described in GPUN Letter No. C311-91-2137 dated January 6, 1992.

]2S152 MOV Proaram - The schedule change in this document reflects. commitments-to schedule previously transmitted via letters : C311-90-3132- dated June 7, 1990,- and - C311-89-2117 dated December 28, 1989.

1Hjl7 TMIL Ihi External Events -- This schedule was extended to -1996 as previously described in GPUN Letter No. C311-91-2.150 dated. December 24, 1991.

Other Changes: Ryd g t Activity 4"A) Number Chances The following BA numbers have been changed. There- is no -

change 11n scope or schedule associated with -these changes.

bas which have had their numbers changed are indicated by a **

in Attachment A.

01S Previous'BA Number- -New BA 7 12692E 0TSG Eddy Current Testing 126231 8 12692H TMI Inservice Inspection 126234 17' 41992K Simulator. Modifications 419233 4..

d

(.

l i - + ~ . . + - - -

. + _so, - - , , . . . .

r 1 l

ATTACHMENT B (continued)

CATEGORY C PROJECTS Additions: As denoted by

  • next to the project title in Attachment A.

Completions: 123FFF Other Outage Related Activities 123278 9R Reactor Refueling 123299 Rx Building Preservation 123309 Replace CRDM Flange Gaskets F. Boron Removal 123312 Main Condenser Intector Coating Repair 126218 Steam Erosion Inspection 128128 OTSG Chem Cleaning System 225001 TMI-l PDMS Alara Monitoring by TMI-l (9R part) 412075 Replace Control Rods 412512 TMI-006 Upgrade RCP Lube Oil Systap 412553 Replace Bailey Transmitters (9R) 412578 RCP & MS Line Hangar Platforms 412590 BIRO T/C Cable Replacement 412597 OTSG Tube Sleeving 412598 Ungrade Source Range Nuclear Instr 412603 ioxboro Transmitter Replacement (9R) 418705 Incore Detector Replacement 419665 Construct Training Labs Deletions: 126104 Tech Spec Improvements 412AGK RBEC Leak Detection System Instruments BA Number Changes: OfLS, P_rgyious BA Number New BA 34 418AAA Improve Plant Page Syst 418801 40 419699 Security Equipment 410723 51 123299 RB Preservation Program 123319 52 12692F [rosion Corrosion Program and Inspection 128148 58 412AFN OTSG Tube Sleaving 412622 59 412603 Foxboro Transats Replace 412623 60 412598 Upgrade Source Range HI 412626 61 412AFC HSPS Upgrades 412627 62 412AGO Main & Aux FB Variable Freq 412629 Drives 65 123299 RB Preservation 123J11 66 123J11 Stern Erosion Inspection 128All 78 126207 Operator Training Analysis 126237 21 41992J Simulator Enhancements 419232 84 412AFF Core Monitoring System Upg 412624 89 128ACK Component Data Base Expand 128166