ML20198C811

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-440/86-13 on 860505-08 & Notice of Violation.Response to Violation,Per Paragraph 5 of Insp Rept Not Required.Notice of Violation Withheld (Ref 10CFR73.21)
ML20198C811
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/20/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20198C817 List:
References
NUDOCS 8605230058
Download: ML20198C811 (2)


See also: IR 05000440/1986013

Text

TWd

,

.

OA

un

-

AIIPn I L n 3y n" ^

,_u v, i m v . . , . . . . . U

MAY 2 01986

Docket No. 50-440 .

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safeguards inspection conducted by Messrs.

J. R. Kniceley and B. Drouin of this office on May 5-8, 1986, of activities

at Perry Nuclear Power Plant, Unit I authorized by NRC Operating License

No. NPF-45 and to the discussion of our findings with Mr. J. J. Waldron and

other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. The inspection

showed that action had bee'n taken to correct the identified violation and

to prevent recurrence. Our understanding of your corrective actions are

described in Paragraph 5 of the enclosed inspection report. Consequently, no

reply to the violation is required and we have no further questions regarding

this matter at this time.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure

to this letter and our report of this inspection will not be placed in the NRC

Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

7

/ '

\ !

B605230059 860520 l

PDR ADOCK 05000440 '

O PDR

contains

EnclosureSAFEGU

tais

" ing

8

}i. .g,k,ugo,segmt4onpage

.

O n. E r- n i i q w w r,1pM/S-~_t}

WTH Lu V/Ti\sv --

Cl m Electric Illumincting 2

MAY 2 01986

.

We will gladly discuss any questions you have concerning this inspection.

. Sincerely,

,

W. L. el sM , ' Chi ef

Nuclear Materials Safety

and Safeguards Branch

Enclesures:

1. Notice of Violation

2. Inspection Report

No. 50-440/86013(DRSS)

cc w/ enclosures:

Perry Information Control

Mail Zone R290

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o UNCLASSIFIED

SAFEGUARDS INFORMATION:

J. J. Waldron, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

L. O. Beck, General Supervising

Engineer, Nuclear Licensing and i

'

Fuel Management Section

DCS/RSB (RIDS) '

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq. ,

James W. Harris, State of Ohio

Robert H. Quillin, Ohio

Department of Health

RIII Y

4

RIII RII RI RIII .

'

Kni ey/jlk D ui d K A\ n0%

aA

s

GEfeCOUtkty0 g

a a

on

-

n Ia 3 mn i( n,d a--h g UP , $s Deco"t*,

S

_us,issu i, v m ,i . y o, 96

~

, - - _ .