Forwards Nine Discrepancy Repts (Drs) Identified During Review Activities for Independent Corrective Action Verification Program.Ten Drs Determined Invalid,Encl
ML20198C799
Person / Time
Site: Millstone 
Issue date: 01/05/1998
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
9583-100, NUDOCS 9801080060
Download: ML20198C799 (31)


Text

4<

Sar gorttlSi;Lundyc f[

Don K. Schopist Vice President l

l 312 2W6078 January 5,1998 Project No. 9583-100 Docket No. 50-423 Northeast Nuclear Energy Company Millstone Nuclear Power Station, Unit No. 3 Independent Corrective Action Verification Program United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 I have enclosed the following nine (9) discrepancy reports (DRs) identified during ot'r review activities for the ICAVP. These DRs are being distributed in accordance with the Conununications Protocol, PI-MP3-01.

DR No. DR MP3-0674 DR No. DR-MP3-0701 DR No. DR-MP3-0730 DR No. DR-MP3-0732 DR No. DR-MP3-0734 DR No. DR-MP3-0736 DR No. DR-MP3-0737 DR No. DR-MP3-0742

/

DR No. DR-MP3-0750 4 0.)]

I have also enclosed the following ten (10) DRs that has been determined invalid. No action is required from Northeast Utilities for this DRs.

The basis for its invalid determination is included on the document.

DR No. DR-MP3-0185 DR No. DR-MP3-786 DR No. DR MP3-0188 DR No. DR-MP3-812 DR No. DR-MP3-0308 DR No. DR-MP3-830 DR No. DR-MP3-0433 DR No. DR-MP3-875 DR No. DP-MP3-0760 DR No. DR-MP3-899 9801000060 900105 I)l lllll] llll'lll l

PDR ADOCK 05000423

...e o.

P PDR tj[Uh77 55 East Montce Street

  • Chicago. IL 60603-5780 USA
  • 312-269-2000

United States Nuclear Regulatory Commission January 5,1998 Document Control Desk Project No. 9583-100 -

Page 2 Please direct any questions to me at (312) 269-6078.

Yours very truly,

.I.

D. K. Sc pfer Vice President and ICAVP Manager DKS:spr Enc'ysures Copies:

E. Imbro (1/l) Deputy Director, ICAVP Oversight T. Concannon (1/l) Nuclear Energy Advisory Council J. Fougere (1/l) NU mNcevpkn97w01034duc

DR Ns. Dr MP3-0185 Nor'heast Utilities ICAVP t

Millstone Unit 3 Discrepancy Report DR INVALID Review Oroup: Systern Potential operability issue Discipline: Mechanical Do6Agn Om Diecrepancy Type: Ucensing Document

@ No SystemProcess: SWP NRC Significance level: 4 Date faxed to NU:

Date Published:

Ducrepency: Discrepancy between FSAR and Specification for Control Building NC Booster Pump Flow

==

Description:==

While dispositioling Requirement SWP-0062, the following discrepancy was noted:

FSAR Section 9.2.1.2 states that the Control Building NC Booster Pumps [3SWP*P2A&B] shall each provide 500 gpm'of flow at 41.5 ft of TDH, Per Specification and vendor documentation, these pumps were purchased to provide 500 gpm each at 45 ft TDH.

Valid invalid Date inittetor: Tenwinkel, J. L 0

0 O

$2/ias7 VT Lead: Neri, Anthony A O

O 12/1097 VT Mgr: Schopfer, Don K O

O

$2/23,S7 IRC Chmn: Singh, Anand K O

O O

o/27/97 Date:

9/27/97 The pumps are sized to provide about 10% higher TOH. This is INVALID:

consistent with good design practices. Thus the identified discrepancy is invalid.

Date:

RESOLUTION:

Previously ldutified by NU7 O Yes (W) No NonDiscrepentConddlon?O Yes in) No Resoludon Pending70 ve. @ No Resosutionunre.oived70 vos @ No Review in6tletor: Tenwinkel, J. L b

b VT Lead: Neri, Anthony A b

VT Mge: schopfer, Don K IRC Chmn: singh, Anand K Date:

SL Comments:

Page1 of i Pnnted 12/31/9710 54 56 AM

o

  • a Northeast Utilitiws ICAVP DR No. DR-MP3-0188 Millstone unit 3 Olscrepancy Report Review Group: system DR WVALIO Review Element: System Design pgg

,qgm Discipline: Mechanical Design

@g Discrepancy Type: LicenWng Document No SystenVProcess: SWP NRC significance level: 3 Date faxed to NU:

Date Pubilshed:

D6ecrepancy: Capability of SW Psmps to operate without lubricating water to the bearings

==

Description:==

While dispositioning Requirement SWP-0059, the following discrepancy was discovered:

FSAR Section 9.2.1.2 states that the SW Pumps [3SWP*P1 A, B.

C, and D] shall be capable of operating without lubricating water.

Contrary to the above, the procurement specification,2332.502-004, Rev.1, Page 1 12 states:

" bearings shall be lubricated with filtered seawater fumished from the pump discharge header having a maximum particle size of 50 microns" and "In case of loss of power, the purnp shall be capable to siart without lubricating water after a momentary shutdown of 35 seconds until emergency powest is restored."

Further, the data supplied by the manufacturer in respense to the specification states:

" Lubricating water required - gpm/psig: = Positive flow - 30 psig 100 microns" Finally, the manufacturer's drawing [ Hayward -Tyler Dwg No 01-400 520] indicates:

" Filtered seawater to be supplied to gland and bearings 30 seconds max after startup and maintained continuously at 0.5 to 1.0 gpm quantity at 100 microns."

From this it is concluded that the pumps as fumished did not meet the original specification requirement that the pump be able to start up and run for at least 35 seconds without tube l

water, and further that the pumps are not in compliance with the FSAR requirement that they be able to run without lube water at all.

Review Valid invalid Needed Date inmator: Tenwinkel. J. L 0

0 0

2/22/97 VT Lead: Nort. Anthony A O

O O

22as7 VT Mgt: schopfer. Don K O

O O

IRC Chmn: Singh, Anand K O

O O

Date:

12/22/97 INVAUo: Subsequent to initiating this DR, it was found that modifications had been implemented to the Service Water Pumps, 3SWP*P1 A, B, C, &D which changed out the original bearings, which required lubricating water, with bearings of an improved design, which no longer require lubricating water from an extemal source, but rather are lubricated by the process fluid.

Therefort - s DR is no longer valid.

.m

'~

Printed 12/31/9710.56:21 AM Page 1 of 2

o e.

t Northea:t Utilities ICAVP DR N3. DR-MP3-0188 Millstone Unit 3 D!screpancy Report Date:

RESOLLTDON:

Previously identmed by NU7 (,) Yes @ No Non Discrepent Condetion?() Yee t #;' No Resolution Pend 6ng?O Yes @ No R.soivison unresoev.d70 Yes @ No Review A ceptable Not Acceptable Needed Date Mh TMJ L.

VT Lead: Neri, Anthony A VT Mgr: Schopfer. Don K IRC Chmn: Singh, Anand K g

Date:

SL Comments:

\\

'I Printed 12/31/9710:56.25 AM Page 2 of 2

Nirtheast Utilities ICAVP DR No. DR-MP3-0308 Millstene Unit 3 Discrepancy Report Review Oroup: System DRINVALID Potential Operability issue Discipline: Mechanical Design y

Discrepancy Type: Lkensing Document SystertvProcess: SWP

~

NRC Significance levd: 4 Date faxed to NU:

Date Published:

Discrepancy: Discrepancy Between SWS Design and FSAR and SW DBSD Conceming Radiation Monitoring Requirements

==

Description:==

There is a discrepancy between the FSAR and the SWS DBSD witt: regard to radiation monitoring requirements. FSAR Sections 9.2.1.2 and 9.2.1.3 require that one monitor per train be provided, or 2 total, to detect radioactivity in the SW discharge from the Containment Recirculation Coolers, while the DBSD Section 12.6.1 requires one monitor per cooler, or 4 total.

Sufficient valving is provided to enabla the operator to remotely isolate one cooler at a time in the event of a hl rad alarm So that the individual affected cooler could be isolated if needed.

Rev6ew Val 6d invalid Needed Date initiator: Temwinkel, J. L O

O O

12/1a97 VT Lead: Neri, Anthony A O

O O

10/157 VT Mgt: Schopfer, Don K O

O O

IRC Chmn: Singh, Anand K O

O O

Date:

10/13/97 INVALID: This condition duplicates previously issued DR-MP3-0239.

Dete:

RESOLUTION:

Previouslyidentified by NUr O vos f97 No NonDiscrepantCondition70 ves (9) No Resolution Pending70 ves

  • No Resoiutionunresoived70 ves + No Rev6ew Acceptable Not Acceptable Needed Date

,g VT Lead: Neri, Anthony A VT Mgt: Schopfer, Don K IRC Chmn: singh, Anand K Date:

SL Ccmments:

Ertnted 12/31/9710.57:15 AM Page 1 of 1

Nodheast Utilities ICAVP_

DR No. DR-MP3-0433 Millstone Unit 3 Discrepancy Report Review Group: system DR INVALID Potential cporainlity issue Diecipline: Mechanical Design g

Discrepency Type: Calculation jg SystemProcess: sWP NRC Significance level: 4 Date faxed to NU:

Date Published:

06ecrepancy: Several relief valves set-point calculations do not include capacity sidng.

==

Description:==

Calculations: SP-3SWP-8, Rev 1, CCN#1; SP 3SWP 7. Rev 1, CCN#1; SP 3SWP-8, Rev 1, CCN#1; SP 3SWP 9, Rev 1 CCN#1; SP 3SWP 11, Rev 1, CCN1; SP 3SWP 12, Rev 1, CCN#1; SP 3SWP 15, Rev 1.

All of the set-point calculations identified above are for thermal relief valves downstream of heat exchsngers in the service water system. In the event that service water becomes isolated in one of the heat exchangers while hot process water is flowing through the other side of the heat exchanger, the relief valve may be required to vent if the pressure exceeds the set-point pressure. Calculations to determine tM muired relieving capacity of the relief valves were not lareced in the set point calculations, nor were such calculations entified in the course of the review. Because there is no information referenced that demonstrates the relief valves have sufficient capacity to fullfull their safety related function, this portion of the discrepancy affects system functionality.

Review Valid invalid Needed Date initiator: D6onne, B. J.

O O

O 12/22/97 VT Lead: Neri, Anthony A O

O O

12/18/97 VT Mgt: Schopfer, Don K O

O O

IRC Chmn: singh. Anand K O

O O

Date:

12/18/97 INVALID: We have verified that the thermal relief valves are 3/4 inch. This is standard practice for this application and therefore the identified condition is not considered a discrepancy.

Date:

RESOLUTION:

Previously idenufled by NU? O Yes l#! No Non Diecrepent Condition?O vos ? No Resolution Pending?O ves @ No Resolution Unresolved?O ve.

+ No Review Acceptable Not Acceptable Needed Date VT Lead: Nort, Anthony A VT Mgr: schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

Printed 12/31/9710.58:16 AM Page 1 of 1

,4

  • 4 NoNheast Utilities ICAVP DR No. DR-MP3 0474 Millstone Unit 3 06crepancy Report Review Group: Program 'stic DR VALID Rev6ew Element: Correct 9. Action Process p

g 06ecipl6ne* h. Desg" O ves Discrepancy Type: Correctrve i. ton

@) No SystemProcess: Rss

~

NRC Signifnconce level: 4 Date faxed to NU:

Date Published:

. Discrepancy: Closure of Design Deficiency Report (DDR) No. 641

==

Description:==

Discussion DDR 641 was written to document a concem regarding the potential for trapped air in the RSS system being delivered to the suction of the operating Charging and Safety injection pumps.

Closure of the DDR reli9d in changes to Operating Procedure EOP 35 ES 1.3 to address the issue. These changes were incorporated into EOP 35 ES-1.3 Rev.1 Change i per PORC meeting number 3-86-14. Later, Revision 4 of EOP 35 ES-1.3 removed the changes that had been made without a safety evaluation per PORC meeting No. 3-9126. The lack of safety evaluation to remove the changes (which had been made to resolve DDR 641) has been documented by NU in CR M3 1260. The corrective action for this CR is to " determine what changes, if any, should be incorporated into ES 1.3 after RSS modifications are comple:a to the system."

RFI 652 requested a description of specific changes which were to be made to ES1.3 resulting from CR M3-971260. NU's response (sent via IRF 874) states that "the changes were originally made to the procedure in order to resolve the concem with air intrusion into the operating SlH and CHS pumps following an accident. This concem is now being addressed by permanent plant modification DCR M3 97-045."

The executive summary and supporting design change package details for DCR M3-97045 Rev. C were submitted by NU as attachments to IRF 874 and have been reviewed. Contrary to the IRF response that DDR 641 issues (air intrushn in SlH and CHS pumps) were now being addressed by permanent plant mod M3-

97045,
1. There is no description in DCR M3-97045 which restates the problems and specific concems which are documented in DDR 641. Based on our review of the documentation provided, it is not clear that the concems in DDR 641 are being addressed in the modification.
2. DDR 641 is not listed as a design input or reference
3. The DCR contains listings of various documents which are being addressed by the modifications, these include a listing of ACR's addressed, a listing of UIR's addressed, a listing of OIRs addressed and LERs addressed. DDR 641 is not listed among those documented issues being addressed by the modification.

Printed 12/31/97 to 59:20 AM Page 1 of 2 l

. i+ ' '

.x

?*

Nohherst Utilities ICAVP DR No. DR MP3-0674 Millstone unit 3 -

Discrepancy Report In summary, based on the DCR M3-97-045 Rev. C modification documents reviewed, it does not appear that the issues described in DDR 641 are being resolved as stated in NUs response, IRF 874.

Review Valid invalid Needed Date initiator: Neverro, Mark O

O O

2 ras 7 VT Leed: Ryan, Thomas J O

O O

12/ss7 VT Mg : Schopfer. Don K G

O O

12/11/97 IRC Chmn: $4ngh, Anand K O

O

$2/22.S7 Date:

INVALID:

Date:

RESOLUTION:

Previously identified by NU7 O Yes (OTNo Non D6ecrepent C, 44 tion?O Yes (#) No Resoiution Pending70 Yo.

(*) No Re.oivison unre.oived70 Yo.

(*D No Review Acceptable Not Acceptable Nooded Date gg VT Lead: Ryan, Thomas J VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

Pr+nted 12/31/9710:59 24 AM Page 2 of 2

.e Noitheast Iftilities ICAVP DR No. DR-MP3 0701 Millstone Unit 3 Discrepancy Report Review Group: system DR VALID Review Element: System Deegn pggg Discipline: Electrical Design Om Discrepancy Type: Licensing Document (G) No SystemWocess: DGX NRC Significance level: 3 Date faxed to NU:

Dett. Published:

Discrepency: Discrepancy with Branch Tech Pos PSB Adequacy of Station Electric Distribution System Voltages Descripuon:

Background:

Page 8.3 21 of the FSAR states:

The second level of pro 2ection is in addition to the undervoltage scheme which also employs a two-out-of-four coinc!dence logic to prevent spurious trips of the offsite power source. Two separate time delays are incorporated in the degraded voltage scheme. The first time delay establishes the existence of a sustained degraded voltage on the bus. Following the delay, an alarm in the control room alerts the operator to the degraded condition. The subsequent occurrence of an accident signal (SIS or CDA) immediately separates the Class 1E distribution system from the offsite power system..

Discussion:

When the first time delay (relay 62H-) times out and an accident condition is present, relay 27Y2 and timer 62Y are energized. A contact from 27Y2 trips the bus tie breaker and a time delay closed contact from 62Y-energizes relay 27Y1. The reserve breaker is then tripped by a contact from 27Y1.

Based on calculation NL-042, revision 2, timer 62Y-is set to time out at 5 seconds.

==

Conclusion:==

The FSAR states that the Class 1E distribution system is immediately separated from the offsite power system in the event of an accident signal and a degraded voltage condition.

Based on a review of the schematics it appears that there is a 5 second delay between the time a degraded voltage condition is proven coincident with an accident condition and the Class 1E distribution system is separated from the offsite power system.

Drawings reviewed:

ESK-07J Rev 20 Elementary Diagram - 4.16kV Bus 34C

[3 ENS *SWG-A] Aux Circuit ESK-07L Rev 24 Elementary Diagram - 4.16kV Bus 34D IWh!R* RWA.R1 Auv tirnrit Pnnted 12/31/9710 59 53 AM Page 1 of 2

n c

Noitheast Ut!Ilties ICAVP DR No. DR-MP3 0701 Millstone unit 3 Discrepancy Report ESK 07SX Rev 11 Elem Diag 4.16 kV Bus 34C

[3 ENS *SWG A] Undervoltage (Hi Stpt) Trip Ckt ESK-07SY Rev 11 Elem Diag 4.16 kV Bus 34D

[3 ENS *SWG B) Undervoltage (Hi Stpt) Trip Ckt ESK 08KC Rev 11 125V DC Emer Diesel Gen Start Ckt 3EGSA01 [3EGS*G-A)

ESK 08KF Rev 12 125V DC Emer Diesel Gen Start Ckts Ckt 3EGSB01,2 [3EGS*G-B]

Calculation NL-040 Rev1 Undervoltage Protection Scheme Relay Settings for Millstone 3 Calculation NL 042 Rev 2 Millstone Unit 3: Degraded Voltage Protection Scheme Relay Settings Review Valid invalid Needed Date initiator: Womer,1.

O O

O 12rar97 VT Lead: Nort, Anthony A

[

Q 12/11/97 VT Mgr: Schopfw, Don K g

Q Q

12/11/97 IRC Chmn: Singh, Anand K O

O O

12r24s7 Dei.:

INvt.LIO:

Date:

RESOLUTION:

Previously identifled by NU7 O Yes teil No NonDiscrepentCondMion?O Yes @ No Resolution Pending?O Ye.

(siNo ResolutionUnresolved/O ve.

@ No Review Acceptable Not Acceptable Needed Date gg VT Leed: Nort, Anthony A b

VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

Pnnted 12/31/9710 59 57 AM Page 2 or 2

Noitheast Utilities ICAVP DR No. DR-MP3-0730 Millstone unit 3 -

Discrepancy Report Review Orcup: Programmate DR VAL 10 Rev6ew Element: Corrective Acton Process p

g Discipline: 1 & C Design O Ya Diecrepency Type: Corrective Acton gg Systemfrocess: HVX NRC Siged6cance level: 4 Date faxed to NU:

Date Puolished:

Discrepancy: Lack of setpoint implementation documentation and unverifim assumptions.

Deecription: Design Deficiency Report (DDR) 973 is resolved through E&DCR N-EC-01733. This E&DCR adjusts the setpoint of flow switches without revising the setpoint calculation. The E&DCR does not state what is the average flow value or where this information is documented, The E&DCR states the revised setting is "just below" the average flow value without quantifying this margin.

Review Valid invalid Needed Date initiator: Dombrowsid, Jim O

O O

12/st97 VT Leed: Ryan, Thomas J G

O O

12/aS7 VT Mgt: schopfer, Don K O

O O

52/11/97 IRC Chmn: singh, Anend K O

O O

12/24/97 Date:

INVALIO:

Date:

RESOLUTION:

Previously iderdined by NU7 O Yes ? No Non Discrepent Condition?O Yes @ No Resolution Pending?O vos

  • No ResolutionUnresolved?O vos @ No Review Acceptable Not Acceptable Needed Date VT Leed: Ryan, Thomas J VT Mgt: schopfer, Don K IRC Chmn: singh, Anand K Date:

SL Comments:

Pnnted 12/31/9711.00-37 AM Page 1 of 1

Northeast Utilities ICAVP DR N;. DR-MP3-0732 Millstone Unit 3 Discrepancy Report Review Group: System DR VALIO Review Element: system Design Diecipline: ElectricH Design Discrepency Type: Component Dets

@ No systemfProcess: HVX NRC Signifncence level: 3 Date faxed to NU:

Date Putdished:

Discrepancy: CPble and Motor Output Sizing Concems Ir.volving HVAC Motors Ducription: 1. Calculation 067E (CCN 4, Rev 0) establishes maximum cable lengths for 460V motors. The cable size for the feed to 3HVR*ACU1B (Cable # 3HVRBPLOO1, Mart # NHR 25) is not listed in Calculation 067E, as this size of cable (#8 AM) is too small for a 50 HP motor and would lead to an unacceptable voltage drop. Since this cable size is not evaluated, the voltage at the damper motor cannot be confirmed (the results are indeterminate).

2. Specification 2474.030-624 (Rev.1) does not provide brake horsepower load requirements for 3HVR*RE10A,3HVR*RE10B, 3HVR*RE19A, or 3HVR*RE198, therefore, a mathematical evaluation cannot be performed on the data to determine if the licensing requirement (that the motor be sized to develop sufficient horsepower to drive the mechanical load under runout or maximum expected flow anel pressure whichever is greater, and without encroaching on the service factor)is met. (A review of vendor drawings was made, but this data could not be found.)
3. In Specifications 2472.900 594 (Add,1, Rev.1) and 2170.430-140 (Add.1, Rev. 2), dampers are not sized in terms of brake horsepower but are sized to develop torque sufficient to drive the dampers. Specification 2472.900-594 Page A1 13 requires that the torque developed by the motors be at least 1.5 times the torque required by the dampers. However,in Specification 2472.900-594 Pages A2-104 and A2105 and Vendor Drawing 2472.900 5941578, the motors for Dampers 3HVP* MOD 26A and 3HVP* MOD 26B develop 1523 inch. pounds which is only 1.26 times the torque required by the dampers (1206 inch-pounds). No calculation could be found which justifies tnis deviation from Specification 2472.900 594.

Review Valid Invalid Needed Date Initletor: Kendall. D. J.

O O

O 12/1/97 VT Lead: Neri, Anthony A O

O O

12/9/97 VT Mgr: Schopfer, Don K O

O O

52tti>97 1RC Chmn: singh, Anand K O

O O

2:24/97 i

Date:

l INVALID:

t Date:

RESOLUTION:

oseviounty.w.ona.a by wip r 1 v..

4mi un uaa Discr F r,-,ueumor 1 v.,

4at um Printed 12/31/9711:01:13 AM Page 1 of 2 i

l l

l No'rthert Utilities ICAVP DR N. DR-MP3 0732 Mllistone Unit 3 Discrepancy Report Resolution P ng?

Yes ($1 Resolut Useresolved Yes (8)

Acceptable Not Acceptable Needed Date g

b b

VT Leed: Nerl, Arthony A O

O VT Mgr: Schopfer, Don K I

IRC Chmn: Singh, Anand K O

O E

Date:

sL Comments:

i l

)

1 l

i 2

l F

4 Pnnted 12/31/9711:01:17 AM Page 2 of 2

_ *[

No'rtheast Utilities ICAVP DR NO. DR-MP3 0734 Millstone Unit 3 Discrepancy Report Review Groop: System DR VALID Review Element: system Design Potent 6el Operstmity issue D6scipline: Electrical Dwiga O vee Diecroper.cy Type: Componera Date

@ No SystemProcess: HVX NRC Significance level: 4 Dale faxed to NU:

Date Published:

Discrepancy: NU Database Discrepancies involving HVAC Motors DescrlPtion: 1. For the following pump motors, Production Maintenance Management System (PMMS) has three ampacity categories and values for two ampacity attributes, plus questionable horsepower data:

3HVP*FN1 A/B/C/D: AFL = 49; ALR = 290; Amps = 40; HP =

38.5 3HVR*FN6A/B: AFL = 0; ALR = 0; Amps = 75; HP = 67 3HVR*FN12A/B: AFL = 86; ALR = 518; Amps = 75; HP = 60 3HVR*FN13A: AFL = 69; ALR = 420; Amps = 60 3HVR*FN13B: AFL = 68; ALR = 420; Amps = 60 3HVR*FN14A/B: AFL = 47; ALR = 302; Amps = 40; HP = 37.5 3HVR*ACU1 A/B: AFL = 0; ALR = 0; Amps = 50; HP = 37.2 Comparing the values in PMMS with other documents, "AFL" and "ALR" represent full load and locked rotor current, respectively. It appears that " Amps" represents the horsepower and "HP" represents brake horsepower. " Amps" and

" horsepower" should be revbed to reflect the actual motor attributes and values, and missing "AFL" and "ALR" shou;d be filled in.

2, 3HVR*RE19A is shown on PMMS as temporarily removed but is shown as active in other design documents (one lines, specification, Plant Design Data System (PDDS), calculations, vendor drawings). The design documents should all represent the present Installed configuration.

3, The full load current shown in PMMS for 3HVR*FN13A (69 amps) does not agree with Specification 2140.430-140 (Add.1, Rev. 2), Vendor Drawing 2170.430-140-1888, and PDDS which all show 68 amps. Note that PMMS shows the full load current as 68 amps for 3HVR*FN13B. PMMS should be revised to reflect the actual fullload amps.

4. Production Maintenance Management System (PMMS) contains data sheets for the dampers (e.g.,3HVP* MOD 20A, 3HVP' MOD 20B, etc.), but none of the technical data such as horsepower, amps, or voltage is filled out. Note: this data exists in the Plant Design Data System (PDDS). PMMS should be Printed 12/31/9711:01:40AM Page 1 of 3

Noithe:st Utilities ICAVP DR No. DR MP3 0734

.r Millstone Unit 3 Discrepancy Report

5. The locked rotor current value shown in PDDS and PMMS is

$18 amps for 3HVR*FN12A and 542 amps for 3HVR*FN128, even though these fan motors are identical. These databases should be consistent and be revised to reflect the actual motor locked rotor current data.

6. PDDS shows the fullload current as 1.9 amps for 3HVP' MOD 20A, 3HVP* MOD 208, 3HVP'M OD20C, 3HVP* MOD 200, 3HVP* MOD 23A, 3HVP* MOD 23B, 3HVP* MOD 26A,3HVP* MOD 26B 3HVR* MOD 28A, 3HVR* MOD 288,3HVR* MOD 49A 3HVR* MOD 49B, 3HV R* MOD 49C 1, 3HVR* MOD 4902, 3HVR* MOD 50A, 3HVR* MOD 500,3HVR* MOD 50C1, and 3HVR* MOD 50C2 but as 2.0 amps for 3HVR* MOD 45B1,3HVR* MOD 45P'.~,

3HVR* MOD 45C1,3HVR MOD 45C2,3HVR* MOD 46A, 3HVR* MOD 46B,3HVR* MOD 140A, and 3HVR* MOD 140B. The Vendor Drawings 2472.900-594 2128 and 2472.900 594 2138 show the full load current as 2.0 amps.

PDDS also shows a locked rotor current value of 2.6 amps for 3HVP* MOD 20A, 3HVP* MOD 208, 3HVP* MOD 20C, 3HVP* MOD 20D, 3HVP* MOD 23A, 3HVP' MOD 23D, 3HVP* MOD 26A, and 3HVP* MOD 26B but no locked rotor current for the other dampers.

Vendor Drawings 2472.900-594-2128 and 2472.900-594-213B show the locked rotor current as 10 amps for the dampers.

PDDS should be revised to reflect the actual full load and locked rotor current values shown on the vendor drawings.

7. The mo'cr insulation rating is shown as *H" in Specifications 2170.430-140 (Add.1 Rev. 2) and 217e 430-141 (Add.1, Rev.
3) and associated vendor drawings but is shown as *F" or "B" in the Plant Design Data System (PDDS) for the follow!;19 motors:

3HVR*FN6A/B: PDDS Insulation Rating is F 3HVR*FN12A/B: PDDS Insulation Rating is B 3HVR*FN13A/B: PDDS Insulation Rating is F 3HVR*FN14A/B: PDDS Insulation Rating is F The insulation ratings shown in PDDS and PMMS should be revised to reflect the actual motor Insulation rating.

8. The specifications, vendor drawings, PDDS, and Calculations NL-033 (CCN 1, Rev. 3) and NL-038 (CCN 6, Rev. 2) show different brake horsepower values for the equipi. lent listed below:

Printed 12/31/9711:01:515 Page 2 of 3

-~

ls E'e Northeast Utilities ICAVP DR No. DR MP3-0734 wilstone Unit 3 Discrepancy Report Spec. Ven Dwg. PDDS NL-033, 038 3HVP*FN1 A/B/C/D : 37.2 37.2 38.5 3HVR*FN6A/B -

53.5 53.5 67 69 3HVR*FN12A/B
47 75 60 3HVR*FN13A/B
45.1 45.1 3HVR*FN14A/B
39.9 39.9 37.5 3HVR*ACU1A/B
37.2 47,1 37.2 Specifications consulted: 2170.430140 (Add.1 Rev. 2),

2176.430-648 (Add.1. Rev. 0),2176.430-141 (Add.1 Rev. 3)

Vendor Drawings consulted: 2144.430-140-010J,2170.430-140-009J, 2170.430-140-0071, 2170.430-140-015J, 2170.430-141 -

002G, 2170,430-141 004 E, 2176.430-648-540G

9. Full load and locked rotor current data exists in Plant Design Data System (PDDS) for 3HVR*ACU1 A but not for 3HVR*ACU18. PDDS should be reviwd to complete the missing data for 3HVR*ACU18.
10. Plant Design Data Systern (PDDS) contains an entry for 3HVR*RE10B,3HVR*RE19A, and 3HVR*RE198, but not for 3HVR*RE10A Neither PDDS nor Production Maintenance Management System (PMMS) provide technical data (horsepower, amps, voltage, etc.) for 3HVR*RE10A, 3HVR*RE10B,3HVR*RE19A, or 3HVR*RE198. These databases should be ievised to include this data.

Review Vai6d invalid Needed Date initiator: Kendall. D. J.

]

O Q

12/1/97 VT Lead: Nort, Anthony A Q

[

]

12/9S7 VT Mgr: Schopfer, Don K O

O O

12iiiis7 IRC Chmn: singh. Anand K O

O O

12/24/97 Dato:

INVALIO:

Date:

RESOLUTKW:

Previously idenUned by NU7 O Yes @ No Non Discrepent Condiuon?O Yes f#i No Resolution Pending70 ve. + No Re.oiution unre.oived70 Yes it) No Review Acceptable Not Acceptable Neede:1 Date VT Lead: Nort, Anthony A VT Mgr: Schopfer. Don K IRC Chmn: singh. Anand K Date:

SL Conswents:

~

Printed 12/31/9711:o1:53 AM Page 3 of 3

No'rtheast Utilities ICAVP DR No. DR MP3-0736 Millstone Unit 3 Discrepancy Report Review oroup: conficuration DR VAUD Rev'ow Element: System Instellatann Potential Opermy issue Diecipline: I & C Design Q y, Discrepancy Type: Installation Impk. mentation

@) No System / Process: N/A NRc significence level: 3 Date faxed to NU:

Date Putdished:

Descrepawy: Improper module installa' ion Foxboro Spec 200 Panels

==

Description:==

Foxboro installation and operation requirements for Contact Output isolators are set forth in Instruction Mi 240-113 May 1990, it requires that:

The isolator is held by two captive screws on the top and bottom of the front plate.

A protective cover for the lower six terminals must be attached when circuits are live.

These requirements sre applicable to all four systems: SWP, Q/RSS, HVX and DGX as well as others.

During walkdowns of the Foxboro cabinets in the Control Room Instrument Rack Room, the following deviations from these vendor installation requiremer's were noted. These include both safety (*) and non-safety (-) related panels. The lack of hold done screws may impact alsmic qualification and the lack of covers present a personnel safety hazaid a:,well as a inadvertent contact with circuits resulting unintended operations of components, f) 3CES*1PNL101 Drawings: 12179.2472.710-392-001C Rev. 2

& EE 278 Rev. 22 Nest 3 Slot 5: Protective cover screw broken off in module and bottom module captive screw missing Nest 4 - Slot 8: Bottom module captive screw missing Nest 5 Slot 6: Bottom module captive crew m!ssing Nest 5 Slot 9: Protective cover screw and bottom module captive screw missing Nest 5 - Slot 10: Protective cover screw missing

2) 3CES-IPNL102 Drawings: 12179-2472.710-392-019 Rev. J &

Ei:!-278 Rev. 22 Nest 1 - Slot 5: Protective cover. screw missing Nest 1 - Slot 4: Bottom module captive screw missing Nest 4 - Slot 7; Bottom module captive screw missing Nest 5 Slot 6: Bottom module captive screw missing Nest 5 - Slot 7: Protective cover screw missing h1of4 Printed 1201/9711:02:19 AM

IC M P DR No. DR-MP3 0736

..t mm.

Millstone Unit 3 Discrepancy Report

& EE 278 Rev. 22 Nest 2 Slot 6: Bottom module captive screw missing Nest 4 Slot 3: Bottom module captive screw missing Nest 5 - Slot 3: Bottom module captive screw missing

4) 3CES-IPNL104 0; awing?: 12179-2472.710-392 015 Rev. 3

& EE 27B Rev. 22 Nest 2 Slot 8: Upper captive screw not installed proper 1y and is touching energized wires 104 2 8-4 to TB of module. Battom module captive screw rcissing Nest 4 Slot 5: Bottom module captive screw missing Nest 6 - Slot 7: Bottom module captive screw missing

5) 3CES-IPNL105 Drawings: 12179-2472.710-392-017 Rev. 3

& EE-278 Rev. 22 Nest 1 Slot 3: Bottom module captive screw missing Nest 1 Slot 4: Protective cover screw missing Nest 2 - Slot 3: Bottom mo6ule captive screw missing Nest 3 - Slot 7: Bottom module captive screw missing Nest 4 Slot 3: Bottom module captive scre; missing Nest 5 Slot 3: Bottom module captive screw missing Nest 6 Slot 9: Bottom module captive screw missing

6) 3CES-IPNL106 Drawings: 12179-2472.710-392 392 Rev. 4

& EE 278 Re/. 22 Nest 1 Slot 3: Bottom module captive screw missing 5.est 2 - Slot 5: Bottom module capt!vo screw missing Nest 2 - Slot 7: Bottom module captive screw missing Nesi 3 Slot 4: Bottom module captive screw missing Nest 3 - Slot 9: Bottom module captive screw missing Nest 4 - Slot 3: Bottom module captive screw missing Nest 5 - Slot 4: Bottom module captive screw missing Nest 6-Slot 4: Bottom module captive screw missing Nest 6 - Slot 9: Bottom module captive screw missing

7) 3CES*1PNLl08 Drawings: 12179-2472.710-392 390 Rev. F

& EE 27B Rev. 22 Nest 1 - Slot 4: Bottom modula captive screw missing Nest 3 - Slot 5: Proter tive cover screw missing Nest 4 - Slot 8: Protective cover screw broken off in module Nest 5 - Slot 7: Bottom module captive screw missing Nest 5 - Slot 9: Bottom module captive screw missing

8) 3CES*1PNLl09 Drawings: 12179-2472.710-392 389 Rev. G

& EE 27B Re /. 22 Nest 2 - Slot 4: Protective cover screw broken off in module Nest 5 - Slot E Protective cover screw broken off in module Pnnted 12/31/971102.22 AM Page 2 of 4

o I'

No'rtheast Utilldes ICAVP DR No. DR-MP34736 Millstone Unit 3 Discrepancy Report

9) 3CES IPNLl11 Drawings: 12179-2472.710-392 226 Rev. 5

& EE 27B Rev. 22 Nest 1 Slot 5: Bottom module captive screw missing Nest 2 Slot 6: Bottom module captive screw missing Nest 6 Slot 6: Protective cover screw missing

10) 3CES-IPNLl12 Drawings: 12179-2472.710 392 225 Rev. 3

& EE 27B Rev. 22 Nest 1 Slot 4: Protective cover screw missing Nest 3 Slot 5: Bottom module captive screw missing Nest 4 Slot 5: Protective cover cap scrow broken off in module and bottom module captive screw missing Nest 6 - Slot 8: Bottom module captive screw missing

11) 30ES-IPNLl13 Drawings: 12179-2472.710-039-200-7B Rev.1 & EE 27B Rev. 22 Nest 1 Slot 3: Protective cover cap screw and bottom module captive screw missing Nest 2 Slot 3: Bottom module captive screw missing Nest 3 Slot 5: Bottom module captive screw missing Nest 4 - Slot 4: Bottom module captive screw missing Nest 5 Slot 3: Bottom module captive screw missing Nest 6 Slot 4: Bottom module captive screw missing
12) 3CES-IPNLl15 Drawings: 12179-2472.710 392-009 Rev.1

& EE 278 Rev. 22 Nest 5 - Slot 9: Bottom module captive screw missing

13) 30ES-IPNLl17 Drawings: 12179-2472.710-?92-011 Rev. 3

& EE 278 Rev. 22 Nest 4 - Slot 9: Protective cover screw and bottom module captive screw missing Nest 4 - Slot 10: Protective cover screw missing Nest 6 - Slot 9: Bottom module captive screw missing Nest 4 - Slot 9: Bottom module captive screw missing Nest 5 - Slot 1: Bottom module captive screw missing Nest 5 - Slot 3: Bottom module captive screw missing

14) 3CES*iPNLl19 Drawings: 12179-2472.710-392 386 Rev. C

& EE 27B Rev. 22 Nest 1 - Slot 3: Protective cover screw missing Nest 1 Slot 4: Protective cover screw missing Nest 4 - Slot 6: Bottom module captive screw missing Nest 4 Slot 9: Bottom module captive screw missing Nest 5 - Slot 9: Protective cover screw and bottom module captive screw missing Printed 12/31/9711:0222 AM Page 3 of 4

'p *

'e '

No'rtheast Utilities ICAVP DR No. DR MP3-073%

Millstone unM 3 Discrepancy Report

15) 3CES*lPNLl20 Drawings: 12179 2472.710-392 513 Rev. C

& EE 278 ReV. 22 Nest 3 Slot 4: Protective cover screw and bottom module captive screw missing Nest 5 - Slot 3: Bottom module capuve screw missing

16) 3CES*lPNLl21 Drawir.gs: 12179-2472.710 392 542 Rev. C

& EE 27B Rev. 22 Nest 3 Slot 3: Protective cover screw and bottom module captive screw missing Nest 3 Slot 4: Protective cover cap screw broken off in module Nest 5 Slot 3: Protective cover cap screw broken off in module Review Valid invalid Needed Date initletor: Server, T. 6.

O O

O 12/1/97 VT Lead: Nort, Anthony A O

O O

2/as7 VT Mgt: Schopfer Don K O

O O

12/11/97 IRC Chmn: Singh, Anand K O

O O

2/24S7 DeM:

INVALID:

Date:

RESOLUTION:

Prestously identifled by NU7 Q Yes ie) No NonDescrepentCondet6on?O Yes (@ No Resolut6on Pending?O ve. @ No Resoludon Unresolved 70 ve.

@ No Review Acceptable Not Acceptable Needed Date VT Lead: Nort, Anthony A VT Mgt: Schopfer, Don K IRC Chmn: Singh, Anand K Date:

SL Comments:

Printed 12/31/9711:02:24 AM Page 4 of 4

)

b N6rthe:st Utilities ICAVP DR No. DR MP3-0737 Mii6 stone Unit 3 Discrepancy Report Rev6ew Oroup: Configureton DR VALlO I

N'*

Potent 6cl OperatAtty issue D6ecipline: I & C Design O va D6ecrepancy Type: Instausten implementahon

@ No Systen#rocess: Oss NRC significance level: 4 Date faxed to NU:

Date Pubitehed:

Discrepancy: Instrument Labeling Descr3Puon: The following labeling inadequacies with respect to design documents and requirements of Procedure OA 0,' System and Component Labeling " were noted during system walkdowns and drawing review.

Instrument SQSS-FTE328 does not have an identificelJon tag.

The sensing line, however, is identified. The installation is shown on drawing BK 16F 541 Rev.10.

This drawing, BK 16F 541 Rev.10, (NUSCO number 25212-28889-00054) has had it number altered such that it now reads BK 16F 5410. This is in consistent with its identification is GRITS and common numbering for this type of drawing.

Review Val 6d invalid Needed Date initiator: Sarwr, T. L.

O O

12/i/97 VT Lead: Nort, Anthony A O

O O

2/9/97 VT Mgr: Schopfer, Don K O

O O

12/11/97 IRC Chmn: Singh, Anand K Q

O O

52/2497 Date:

INVALIO:

Date:

RESOLUTION:

Previously identifled by NU? O vos f No Non Discrepent Condation?O Yes @ No ResolutionPending?O vos @ No Resolution Unresolved?O ve.

@ No Review Acceptable Not Acceptable Needed Date g

VY Lead: Nerl, Anthony A VT Mgr; Schopfer, Don K IRC Chmn: Singh, Anand K Dete:

SL Comments:

Pnntou 12f31/9711.02-s2 AM Page 1 of 1

~ 6rtheast Utilities ICAVP DR No. DR-MP3 0742 N

l Millstone Unit 3 Discrepancy Report -

k.<6.w oroup: symm DRVAuD Review Element: System Desgn PoteW Operamyissue Discipl6ne: Electncal Design O ve.

Discrepancy Type: Calculaton

@ No System / Process: DGX NRC Significance level: 3 gggg Dete Published:

D6screpency: Fast Bus Transfer Blocking Time Delay Relay (Calculation 426CA)

==

Description:==

Calculation 426CA determines the setting of miscellaneous undervoltage and time dela/ relays associated with the fast and residual voltage bus transfer schemes. One relay,62R, blocks a fast bus transfer if it is delayed for some reason.

The calculation of the setting of time delay relay 62R includes a 1 cycle allowance for the delay due to an interposed auxiliary relay. However, an examination of schematic diagrams 12179-ESK 7J, Revision 20 and 12179-ESK 5BD, Revision 24 Indicates that there is no auxiliary relay that should be included in the setting calculation. After relay 62R times out, the fast transfer is blocked. The omission of the auxiliary relay shortens the time delay for relay 62R to operate and increases the chance that a fast bus transfer would be blocked.

Review Val 6d invalid Needed Date initiator: Bloethe,G W66tiam O

O O

2/3S7 VT Lead: Neri, Anthony A Q

Q Q

12997 VT Mgr: Schopfer, Don K 0

0 0

12/11/97 IRC Clum: Singh, Anand K O

O O

v2t2497 Date:

INVALID:

Date:

RESOLUTION:

Previously idenufled by NU7 O vos (ei No Non Discrepant Condit6on?Q Yes (ei No Resolution Pending?O ve.

+ No ne.oiuiion unre.oiv.d70 ves @ No Review Acceptable Not Acceptable Needed Date VT Lead: Nort, Anthony A VT Mgr: Schopfer, Don K 1RC Chnm: Sqh, Anand K Date:

sL Conwnents:

3rinted 12/31/9711:o4 36 AM Page 1 of 1

NortheCst Utilities ICAVP DR No. Dii-MP3 0760 Millstone Unit 3 Discrepancy Report Review Group: Programmate DR VALID Review Element: Corrective Acton Procese p

Discipline: Other O ve.

Discrepancy Type: Correctrve Acton (s) No SystemProcess: N/A NRC Significance level: 4 Date faxed to NO:

Date Putdished:

Diecrepency: Failure to implement Design Deficiency Report

==

Description:==

DDR # 803 superseded DDR # 42 and DDR # 43. The design as shown on the DDR # 803 drawings ESK-5BD and SBE adds the Bus Tie Breaker 52S-3 ENS *ACB-TA (B) contact as an interlock to the Reserve Station Service Breaker 3 ENS *ACB-AR and 3 ENS *ACB-BR control circuits.

The Plant Design Change Request (PDCR) # MP3-87 23 Evaluation Form disapproved the incorporation of DDR # 803 on the basis that the "affected ESK's (SBE and 5BF) presently show this design incorporated *,

The design, as shown on the DDR # 803 drawings, was not incorporated based on a review of the latest drawings 25212-31001 Sheet 5 BD, Rev. 25, 25212 31001 Sheet 5 BE, Rev.

24, 25212 31001 Sheet 5 BF, Rev.18 and 2f,212-31001 Sheet 5 BG, Rev. 20.

Review Valid invalid Needed Date initiator: Caruso, A.

O O

O

$2s.s7 VT Lead: Ryan, Thomas J B

O O

$2ss7 VT Mgr: Cchopfer, Don K O

O O

12/iss7 1RC Chrmu Singh, Anand K Q

Q Q

12/2497 Date:

INVALID:

Date:

RESOLUTION:

Previously identitled by NU7 O vos

'4) No Non Discrepent Condition?O Yes (Si No Resolution Pending70 ve. (s) No Resoiution unre oeved70 ve.

(s) No 4

Review Acceptable Not Acceptatde Needed Date O

O O

VT Lead: Ryan, Thomas J VT Mgt: Schoffer, Don K IRC Chmn: Singh, Anand K Date:

sL Comments:

Printed 12/31/9711:os.24 AM Page 1 of 1

Northeast Utilities ICAVP DR No. DR-MP3-0760 Miiistone Unit 3 Discrepancy Report Review oroup: Operations & Maintenance and Testing DR INVALID Rev6ew Element: Operating Procedure g

p g

gy,,

Discipline: Operation.

O v.

Discrepancy Type: 0 & M & T implementation

5) No SysterrWProcess: N/A

~

NRC Significance level: 4 Date faxed to NU:

Date Published:

06ectePancy: Dificicncy in EOP 35 La 1.3, TRANSFER TO COLD LEG RECIRCULATION, Rev,6 Ducription: Tine subject matter of this Disrepancy Report was written up by the SRG Group in their Discrepancy Report DR-MP3-0748. The ORG Group had input to and reviewed this report.

Therefore, this report is not necessary and is invalid.

Review Valid invalid Needed Nie initiator: Ungeren, R.

O O

O

$2/27/97 VT Lead: Bass, Ken O

O O

12/3ot97 VT Mgr: Schopfer, Don K Q

Q Q

IRC Chmn: singh, Anand K O

O O

Date:

12/27/97 DNVALID: See Discrepancy Report Description.

De.e:

RESOLUTION:

Provlously identifled by NU7 O Yes lp No Non Discrepent Condetion?O yes tf No l

Resolution Pending?O yes + No Resosutionunresoeved?O vos @) No Review Acceptable Not Acceptable Needed Date VT Lead: Bass, Ken VT Mgr: Schopfer, Don K 1RC Chmn: Singh, Anand K D.t..

SL Cortments:

Printed 12/31/9711:06:07 AM Page 1 of 1 j

N6rtheast Utilities ICAVP DR NO. DR-MP3-0786 Millstone Unit 3 Discrepancy Report Review Oroup: System DR IWALID Review Element: System Dee(n g

Diecipime: Structural Desyn O ve.

D6screpancy Type: Calculaton Ie) No System / Process: HVX NRC Signific:mco level: 4 Date faxed to NU:

Date Published:

D6ecrepancy: Non Stan Jard Duct Support Discrepancy De cription:

We '.iaV ; reviewed the Millstone Unit 3 - Duct Support Calculation No, NP(B)Z545J 1289 Re9. O Based upon this review we have noted the following discrepancy:

On page # 2 of the calculation, the support is referenced to incorrect drawing number 2179-BZ-545J-124.

The correct drawing number associated with this support should be 12179-BZ-545J 137-2.

Review Valid invalid Needed Date initiator: Kleic, N O

O 12/1&97 VT Lead: Nort, Anthony A O

O O

2/isS7 vt Mor: Schopfer, Don K O

O O

IRC Chmn: Singh, Anand K O

O O

Date:

12/16/97 INVALID: The condition described is an ecitorial error ud therefore is not considered a valid DR condition.

Date:

RESOLUTION:

Previously identifled t y NU? O Yes it) No Non Discrepant Condit6onrU Yes it) No Resolution Pending?O ve.

(s) No Resoivisonunresolved70 ves (el No Review Acceptable Not Acceptable Needed Date g

D D

D VT Lead: Neri, Anthony A VT Mgt: Schopfer, Don K 1RC Chmn: Singh, Anand K Date:

SL Comments:

Printed 12/31/9711.07:05 AM Page 1 of 1

e Northeast Utilities ICAVP DR No DR-MP3-0412 Millstone unit 3 Discrepancy Report Rev;ew Group: system DR INVALID

'Y I

Potential Operabilety issue Diecipl6ne: Mechanical Design O va D6screpency Type: Calculeton No SystemProcess: N/A NRC Signincance level: 3 Date FfJed to NO.

Date Published:

Diecrepancy: Passive Failure in QSS/RSS Spray Headers Flowing a LOCA Ductlpt6on: This Ort was started to report an unanalyzed condition regarding the passive failure design for the QSS/RSS spray headers: that the post LOCA containment response had not been analyzed for spray flow lost throu0h a crack in one of the spray headers.

This DR should tv, /alidated because a more careful review of the licensing basis determined that operation of the QSS/RSS piping systems after a LOCA does not require any passive failure to be considered.

Review Val 6d Invalid Needed Date initietor: Wakeland, J. F.

O O

O 12/2997 VT Lead: Neri, Anthony A Q

[

12C1/97 VT Mgr: schopfer Don K O

O O

1RC Cim.: singh, Anand K O

O O

Date:

12/29/97 INVALID: This DR was started to report an unanalyzed condition regarding the passive failure design for the QSS/RSS spray headers: that the post-LOCA containment response had not been analyzed for spray flow lost through a crack in one of the spray headers.

This DR should be invalidated because a more careful review of the licensing basis determined that operation of the QSS/RSS piping systems after a LOCA does not require that a passive failure be considered. The QSS/RSS passive failure design basis is that systems that support safe shutdown must be able to perform their safe shutdown function in the event of a passive failure See the disposition of system requirements REQ-MP3-QSS-0001,0078,0310,0359,0433,0746,0747, & 0748,0796,

& 0798, and REQ-MP3-RSS-0001,0305,3525,0544 & 0821 for the fulfillment of this design criterion, Date:

REs0LUTION; fYeviously identitled by NU? O vos @ No Non Discrepent Condit6on?O Yes @ No Resolur.on Pending?O ve.

@ No Resolution Unresolved?O ve.

@ No Review Acceptable Not Acceptable Needed Date VT Lead: Nort, Anthony A VT Mgr: schopfer, Don K IRC Chmn: sh'9h, Anand K

_e n c--

Printed 12/31/9710o7.38 AM.

Page 1 of 2

N6 the:st Utilities ICAVP DR No. DR-MP3-0412 Millstone Unit 3 Discrepancy Report o__..._.._

l' a

1 i

1 Printed 12/31/9711:07:42 AM Page 2 of 2

Ndttheast UtWths ICAVP DR N3. DR MP3 0830 4'

MW tone UnN 3 Discrepancy Report Review Oroup: Sysler=

DR INVALID Review ElemeM: System Doogn PWentW Operdiaty lseue D6ecipline: Piping De6ign O va Diecropency Type: Dramg (9) No systerrvProcess: DGX NRC Significance level: 4 Date faxed to NU:

Dale Pubilshed:

m*cf*Pency: Missing Material Designation and Pipe Wall Thickness info on Pipe Isomet..e Drawings Fuel Oil Sys Descrir46on: The following list of piping isometric drawings are missing infon.1stion regarding material designation and pipe wall thickness.

Pipe Isometric Drawing Number CP 360250 CP 360251 CP 360502 CP 360503 CP 360508 CP 360511 CP 360512 CP 360519 CP 360520 CP 360522 CP 360523 CP 360536 CP 360537 Review Valid Invol6d Needed Date initletor: Russiert.

O O

O i2iins7 VT Lead: Nort, Anthony A O

O O

$2/'S$7 VT Mgr: Schopfer, Don K O

O O

IRC Chmn: Singh, Anand K O

O O

Date:

12/19/97 INVALID: The subject isometrics reference the applicable Pipe Class which in tum specifies the applicable material designation and wall thicknesses.

Date:

RESOLUTION:

Previously identifled by Nu? O vos it' No Non Discrepent Condition? dyes L91 No Resolution Pending?O ve.

1*> No Re.oivison unr.oived?C ve.

'*)

No Review Acceptable Not Acceptable Needed Date g

O O

O VT Lead: Nort, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Glngh, Anand K O

O l

Date:

SL Correronts:

Printed 12/3119711:o6.10 AM Page 1 of 1

t i

Ndttheast Utilities ICAVP DR No. DR MP3 0475 Milletone UnN 3 Discrepancy Report Review Group: System DR INVAlt0 Potential Operately issue D6ecipl6ne: Mechanical Design O vee 06ecrepancy Type: Calculaton

  • No SystemProcese: Q$$

NRC 86gnificance level: 3 Date faxed to NU:

Date Published:

~~

D6ecropency: Foundation bolts qualification have not been addressed in the calculation.

Deectl t4*: During the review of seismic analysis report TM 332 for P

Joseph Oat Corporation containment recirculation coolers Equipment ID # 3RSS*E1 A thru D, the following discrepancy was identified.

Rev 0 and Rev i of the report calcuated the loads (stresses) on the foundation bolts but they are act compared regainst their allowable loads (stresses) to denionstrate whether or not they are adequate.

Rev6ew Val 6d inve86d Needed Date initletor Patel, Ramesh O

O O

12/2497 VT Lead: Neri, Anthony A O

O O

12r31/97 VT Mgr: Schopfer, Don K O

O O

IRC Chmn: Singh, Anand K O

O O

Dels:

12/24/97 INVALID: The foundation bolts were sucessfully qualified per calculation no.

12179-C749.9 dated 6/23/76, Therefore, this DR is not valid.

Date:

REsDLUTK)N:

Previo saty identitled by Nu? O Yes iti No Non D6ecrepent Cond6 tion?O Yes 41 No Resolut6on PendingtO vee f*>

No Renoiui6anuareeoivedrO vee <*> No Revlew Acceptable Not Acceptable Nwded Date O

O O

VT Lead: Nort, Anthony A VT Mgr: Schopfer, Don K IRC Chmn: Singh, Anand K

- e.

SL Comments:

Pnnted 12r31/9711:08.38 AM Page 1 of 1

Ndstheast Utilities ICAVP DR No. DR-MP3 4499 Millstone Unit 3 Discrepancy Report Review Group: syetem DR IWALID Potential Operabtilty issue D6ecipline: lAmmonical Do64g3 O Ya D6screpancy Type: Liceneang Document

,,7 g SystemProcess: DGX NRC signH6conce level: 4 Date faxed to NU:

Date Published:

Discrepancy: FSAR Section 9.5.4 EDG Fuel Oil Storage and Transfer System Desenption Descriptkm: FSAR Section 9.5.4 Item 2 states that the primary fuel oil transfer pump discharge strainer is 0.062 inch perforation size (1575 microns).

Based on ACR M3 96-0240, the primary feed pump has a 70 micron strainer on hie pump discharge.

This is for equipment number 3EDG'STRI A &B.

Reference REO MP3 DGX 0402 Review Valid invalid Needed Date init6e80r: Hamestrnan, R.

O O

O 12r23s7 VT L4ad: Neert, Anthony A O

O O

$2r2cS7 VT Mgt: Schopfer, Don K O

O O

PtC chrrm: Singh, Anand K O

O O

D*:

12/20/97 IWALID: This condition was previously identified by NU in ACR M3 96-0240. Per the ICAVP Audit Plan,DR'S are not rnquired for conditions previously identified by NU, Date:

RESOLUTION:

Prev 6ously ident6 fled t>y NUF () Yes i*i No Non Discrepent Condition?() Yes fel No Resolution Pending?O vos

<*) No Resolutkmunresolved70 vos

'*)

No Review Acceptable Not Acceptable Needed Date VT Lead: Heri, Anthony A VT Mgr: Schopfer, Don K l'tC Chmn: singh, Anand K

-e el Cc.tunents:

Pnnted 12r31/9711:0912 AM Page 1 of 1

_