ML20198C418

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/97-27 on 971117-1205 & Notice of Violation.Two Violations Identified.First Violation Involved Failure to Properly Implement Design Control Measures for Refueling Water Storage Pool Level Indication
ML20198C418
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/02/1998
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20198C423 List:
References
50-382-97-27, EA-97-277, NUDOCS 9801070274
Download: ML20198C418 (5)


See also: IR 05000382/1997027

Text

7

O

f

%,4

UNITED STATES

,

8 ' ' , , , '%h

. NUCLEAR REGULATORY COMMISSION

'

.

L'

C

REGICH 8V

8

%

611 HYAN PLAZA DRIVE. SutTE 400

~ % .*.e

,e

ARUNGTON TEX AS 76C118064

..

JAN - 21998

EA 97 277

Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona. Louisians 70066

SUBJECT: NRC INSPECTION REPORT 50-382/97-27, NOTICE OF VIOLATION, AND

EXERCISE OF ENFORCEMENT DISCRETION

Dear Mr. Dugger:

An NRC inspection was conducted November 17 through December 5,1997, at your Waterford

Steam Electric Station, Unit 3, reactor facility. The enclosed report presents the scope and

results of that inspectior).

During the inspection, two violations of NRC requirements were identified.

. The first violation involved the failure to properly implement design control measures for the

refueling water storage pool level indication, a condition that existed since initial plant startup.

We have reviewed the circumstances that resulted in the identification of the design problem

and the correct;ve actions you have implemented. As a result, we have determined that this

violation meets the criteria for the exercise of enforcement discretion, as described in

Section Vli.B.3 of the NRC Enforcement Policy, which addresses the identification of old design

issues. After consulting with the Director, Office of Enforcement, this violation is not t;eing cited.

The reasons for i,0t citing this 'fiolation are that your staff identified the design deficiency, as a

result of an astute observation by an instrumentation and control technician; the condition was

not likely to have been identitled through normal surveillance activities; and appropriate

long-term corrective actions were implemented.

The second violation involvec the failure to promptly initiate a condition report when an adverse

condition affecting a safety-re'aied system was identified. While your staff should be

commended for identifying this issue, a condition report was not initiated ur12 weeks after the

identification of the refueling water storage poolinstrumentation deficiency. An opertoility

determination was not made L ntil after the condition report was initiated. To emphasize the

importance of timely operability decisions, the violation is cited in the enclosed Notice of

Violation (Notice), The circumstances surrounding the violation are described in detail in the

enclosed report.

h

I

,

9901070274 990102

PDR

ADOCK 05000302

O

PDR

T-

.

= Entergy Operations, Inc.

-2-

Please note that you are required to respond to this letter and should follow the instructions

. specified in the enclosed Notice when preparing your response. The NRC will use your

response, in part, to determine whether further enforcement action is necessary to ensure

compliance with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response (if you choose to provide one) will be placed in the NRC Public

Document Room (PDR). To the extent possible, your response should not include any personal

privacy, proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

Should you have any questions concerning this inspection, we will be pleased to discuss them

.with you.

Sincerely,

,

./ [

Ellis W. Merscho

Regional Admin' rator

Docket No.: 50-382

License No.: NPF-38

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-382/97-27

cc w/ enclosures:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi _39286-1995

Vice President, Operations Support

Entergy Operations, Inc.

P.O. Box 31995 -

Jackson, Mississippi 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi- 39205

I-

.

,

.

7

Entergy. Operations, Inc.

-3-

General Manager, Pl ant Operations

~ Waterford 3 SES

Entergy Operations, Inc.

P.O. Box B

- Killona, Louisiana- 70066

Manager - Licensing Manager

Waterford 3 SES -

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

- Chairman

Loulslana Public Service Commission

One~American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

Director, Nuclear Safety &-

Regulatory Affairs -

Waterford 3 SES

- Entergy Operations, Inc.

P.O. Box B -

Killona, Louisiana 70066

William H. Spell, Administrator.

1

Louisiana Radiation Protection Division

- P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

. Parish President

St. Charles Parish

P.O. Box 302 -

Hahnville, Louisiana 70057

' Mr. William A. Cross

Bethesda Licensing Office

3 Metro Center

i

Suite 610

-1

Bethesda, Maryland 20814

Winston & Strawn

~ 1400 L Street, N.W.

Washington, D.C. 20005-3502

{;

.

p

.

,

' Entergy Operations, Inc.

-4-'

g

g g-

,

E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS) .

E-Mail report to Document Control Desk (DOCDESK)

E Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (iE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File ?

Branch Chief (DRP/TSS)

W. L Brown, RC

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

G.F. Sanborn, EO

J. Lieberman, Director, OE, MS:7 HS

OE:EA File, MS:7 H5

DOCUMENT NAME: R:\\ WAT\\WT727RP.LAK

,

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:DRP:PE

dO

D:OE

C:DRP/D

D:DRP

d

GAPick;jes'

GFSanborn'

Jlie arman'

PHHarrell"

TPGwynn (f 7

,g-

y

g.12/23/97

12/19/97

12/23/97

12/24/b7

--

JEDyer

F)6/(dffschoff

W1/k/$

/i/cf98

i

  • previoust/ concurred

OFFICIAL RECORD COPY

\\

- 9 -

..

Entagy Operations, Inc.

-4-

.

-2E.

>

E-Mail report to T. Boyce (THB)-

E-Mail report to NRR Event Tracking System (IPAS) -

-

'

E-Mail report to Document Control Desk (DOCDESK)-

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) .

, bec to DCD (IE01) -

,

bec distrib, by RIV:

- Regional Administrator .

Resident inspectar

- DRP Director

Branch Chief (DRP/D)

MIS System -

Project Engineer (DRP/D)

RIV Filo

Branch Chief (DRP/TSS)

'N. L Brown, RC

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

G.F. Sanborn, EO

J. Lieberman, Director, OE, MS:7-H5

- OE:EA File, MS:7-H5

DOCUMENT NAME: R:\\_WAT\\WF727RP.LAK

To receive copy of document. Indicate in box: "C"

Copy without enclosures "E" = Copy with enclosures "N" = No es : s

RIV:DRP:PE-

EO

D:OE

C:DRP/D

D:DRP - [

G APick:jes *

GFSanborn *

JIieberman *

PHHarrell*

- TPGwynn (l' [

12/24/97.

'

g

1_2/23/97

_g_

12/19/97

12/23/97

JEDyer

EVV@schoff

11-2/: /E6 -

flWT98

i

  • previously . concurred

OFFICIAL RECORD COPY

i

c'70008

,