ML20198C080

From kanterella
Jump to navigation Jump to search
Proposed Changes to Tech Spec 4.10.1 Re Inservice Insp of Steam Generator Tubes to Allow Tube 37-73 in Steam Generator 2 to Remain Unplugged During Cycle 14 Operation
ML20198C080
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/31/1986
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20198C037 List:
References
NUDOCS 8605220208
Download: ML20198C080 (2)


Text

-..

i Docket No. 50-213 I

Attachment i

Haddam Neck Plant Proposed Revision to Technical Specifications

{

I t

4 May,1986 860522020s 860509 PDR ADOCK 05000213 P

PDR i ~

4

?

.n,

..-a.~

,.an--+

>w

.------n.==-.,

a-

,y,.._-

,m

,,,-,-,--_---.-----.,,----.,--,,,r,--,-...-

e a)

A seismic occurrence greater than the operating basis earthquake.

b)

A loss of coolant accident which causes significant deviations in temperature or pressure which affect the integrity of the steam requires actuation of the engineered generator tubes, or safeguards, c)

A major steam line or major feedwater line break.

D.

Acceptance Criteria:

1.

As used in this Specification:

a)

Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections.

b)

Degradation means a service-induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube.

c)

Degraded Tube means a tube containing imperfections ir 20%

of the nominal wall thickness caused by degradation.

d)

% Degradation means the percentage of the tube wall thickness af fected or removed by degradation.

e)

Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective.

f)

Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service because it may become unserviceable prior to the next inspection and is equal to 50% of the nominal tube wall thickness.

g)

Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to af fect its structural integrity in the event of a Operating Basis Earthquake, a loss-of coolant accident, or a steam line or feedwater line break as specified in Specification 4.10.1.C.3.

h)

Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) completely around the U-bend to the top support of the cold leg.

2.

The Steam Generator may be returned to service after completing the corresponding actions (plug all tubes exceeding the plugging limit and all tubes containing through wall cracks) required by Table 4.10.1-2, with the exception of plugging the tube in Row 37, Column 73 in Steam Generator 2 for Cycle 14.

E.

Following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported in accordance with Specification 6.9.

4-21c

_