- f~N Duke Power Company 1
A No lary Cmey
-!,U U
Casauha Nudrar Station -
~
= d '* 8"*' * -
4800 Concord Road -
4@
York. 5C 29745 -
Gary R. Freereon (803) 8314251 omct We besidae (803) 831-3426ux December 29, 1997 U '. S.' Nuclear Regulatory Commission ATTN Document' Control Desk Washington, D.C.
20555
Subject:
Catawba Nuclear Station Dockets 50-413 and 50-414 Inspection Report 50-413, 414/97-01 Commitment Date Extension By letter dated March 20, 1997, the NRC issued Notice of Violation (NOV) 97-01-01 as described in Inspection Report 50-413, 414/97-01.
By letter dated April 21, 1996, Duke
~ responded to this NOV, indicating that a review of the 239 functions excluded from the Maintenance Rule would be conducted for generic applicability to ensure other SSCs do not exist that need to be included within the scope of the Maintenance Rule (MR).
This review was to-be completed by December 31, 1997.
This work will not be completed by the original commitment date.
The scoping review has taken longer than originally planned because lessons learned from MR inspections at Oconee vid McGuire Nuclear Stations were incorporated into the review of the scoping of electrical systems.
This.
increased level of review, particularly in the area of off-site,. eledtrical.- power support systems, switchyard support systems, and the lower in-plant voltage systems requires
- additional. time to complete.
Therefore, overall completion Lof this commitment:will be delayed until February 28, 1993,
-'and will' be ' documented in Problem' Investigation Process (PIP) 0 -C97 -18 6 0 ', which will be made available for review
~
iduring future inspections.
t C
s f h 9901070136 971229 _
PDR: ADOCK 05000413 G.
P DR..
j Il
+
U. S. !Juclear Regulatory Cormnission
- December 29, 1997 Page 2 If there are any further questions concerning this item, please contact. Kay !Jicholson at (803) 831-3237.