ML20198B775
ML20198B775 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 12/21/1984 |
From: | Hayes B NRC OFFICE OF INVESTIGATIONS (OI) |
To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
Shared Package | |
ML20198B650 | List: |
References | |
FOIA-85-101 NUDOCS 8511070243 | |
Download: ML20198B775 (1) | |
Similar Documents at Wolf Creek | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212H0351999-09-27027 September 1999
[Table view]Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20141C5301997-06-19019 June 1997 Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action ML20141H8881997-05-16016 May 1997 Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals ML20138E4481997-04-30030 April 1997 Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues ML20137Z9201997-04-22022 April 1997 Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20147C0771997-02-0404 February 1997 Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals ML20133B1691996-12-31031 December 1996 Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues ML20134P1201996-11-25025 November 1996 Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant ML20134P2201996-11-21021 November 1996 Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys ML20236M0341996-11-12012 November 1996 Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant ML20128L3481996-10-0808 October 1996 Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use ML20236L5801994-08-31031 August 1994 Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint ML20059K5351994-01-21021 January 1994 Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20059E8421993-10-28028 October 1993 Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses ML20057F9461993-10-0808 October 1993 Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program ML20057F2431993-10-0404 October 1993 Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127M9521993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives ML20128B4491993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled ML20126J3941992-12-30030 December 1992 Notification of Significant Licensee Meeting W/Util on 930114 to Discuss Licensee QA Program Initiatives 1999-09-08 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20212H0351999-09-27027 September 1999
[Table view]Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20195J8301999-06-18018 June 1999 Staff Requirements Memo Re 990618 Affirmation Session for SECY-99-133, Final Rev to 10CFR50.65 to Require Licensees to Perform Assessments Before Performing Maint & SECY-99-145 Re Antitrust Issues for Wolf Creek Unit 1 ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 ML20141C5301997-06-19019 June 1997 Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action ML20141H8881997-05-16016 May 1997 Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals ML20138E4481997-04-30030 April 1997 Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues ML20137Z9201997-04-22022 April 1997 Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20147C0771997-02-0404 February 1997 Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals ML20133B1691996-12-31031 December 1996 Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues ML20134P1201996-11-25025 November 1996 Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant ML20134P2201996-11-21021 November 1996 Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys ML20236M0341996-11-12012 November 1996 Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant ML20128L3481996-10-0808 October 1996 Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use ML20236L5801994-08-31031 August 1994 Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint ML20059K5351994-01-21021 January 1994 Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20059E8421993-10-28028 October 1993 Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses ML20057F9461993-10-0808 October 1993 Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program ML20057F2431993-10-0404 October 1993 Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127M9521993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives ML20128B4491993-01-22022 January 1993 Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled 1999-09-08 |
Text
.
December 21, 1984 MEMORANDUM FOR: Robert D. Martin, Regional Administrator i Region IV FROM: Ben B. Hayes, Director Office of Investigations s
SUBJECT:
01 EVALUATION OF THE KANSAS GAS & ELECTRIC (KG&E)
INVESTIGATIVE PROGRAM The attached memorandum from William Ward is one of three anticipated reports I have asked Mr. Ward to prepare. With the anticipation that many licensees will institute their own investigative process concerning allegations, I thought it prudent that we review three such licensee programs. Please note that Mr. Ward did not do an " investigation" of the Quality First Program but more a managerial review to assist me in fornulating a national perspective on how the Office of Investigations should inferface with the utilities investi-gative program.
I ask that this document not be made public at this time. As I have noted above, it is one of three reports which will assist me in developing policy.
Please note that the " staff" also did a review of the Ouality First Progran at Wolf Creek. The results of their review are unknown to me personally.
Attachment:
As stated cc w/att:
W. Dircks, EDO H. Denton, NRR R. Herr, 01, RIV [
Distribution: "
01 s/f FAC Wolf Creek I 01 c/f D'N'/ b2 VJ Office : s I Surname: E@ ayes:dl Date : 12/21/34 g g 8511070243 851015 PDR FOIA VARRICCBS-101 PDR .
Enclosure 1 e'
)