ML20198B526

From kanterella
Jump to navigation Jump to search
Amend 160 to License DPR-72,approving Changes to FSAR & Improved TS Bases to Reflect Change in Design Basis of Emergency Diesel Generator Air Handling Sys
ML20198B526
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/12/1997
From: Hebdon F
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20198B530 List:
References
NUDOCS 9801060348
Download: ML20198B526 (2)


Text

p* 884g O'

t_

UNITE 3 STATES 3

3 NUCLEAR REGULATORY COMMISSION waseavon, o.c. me eooi FLOR 10A POWER CORPORATION CllY OF ALACHUA CITY OF BUSHNELL-Cl"Y OF GA'NESHal-C: TY OF K SSIMM E'E CITY OF LE dE!M CITY OF NEW SMYRNA EEACH AN) JTILITIES COMMISSION.

C1 1Y 0 NEW SMYRNA BEACH CilY OF OCALA QRLANDO UTILITIES COMP ISS106 AND CITY OF ORLANDO SEMINOLE ELECTRIC C00)ERATIVE. INC.

011Y OF TALLAHASSEE DOCKET NO. 50-302 CRYSIAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 160 License No. DPR-72 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendmeat by Florida Power Cor) oration, et al.

(the licensees) dated August 26,1997, complies wit 1 the standards and requirements of the Atomic Energy Act of 1954. as amended (the Act), and the Commission's rules and regulations set brth in 10 CFR Cnapter I:

B.

The facility will operate in conformity with the application, the~

arovisions of the Act, and the rules and regulations of the Commission:

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations:

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have t'een satisfied.

P

6 3

2.

2.

Accordingly, the license is hereby) amended to authorize revision of the-Final Safet Analysis Report (FSAR as set forth in the application for amendment-Florida Power Corporation dated August -26, 1997. The licensee s 11 submit the revised description authorized by this' amendment with the next update of.the UFSAR.in accordance with 10 CFR 50.71(e)..

-3;

- This license amendment-is effective is of its date.of issuance and shall-be implemented as specified in (2), above.

FOR THE NUCLEAR REGULATORY COMMISSION-n Frederick J. Hebd6n. Director Project Directorate II-3 Division of Reactor Projects - I/I!-

Office of Nuclear Reactor Regulation Date.of Issuance:

Deceraber 12, 1997-7

..}

_ _ _ _ _ _ _ _