Forwards Addl Info in Support of 860106 Proposed Tech Spec Changes Re Shift Overtime Requirements.Personnel Scheduled to Work No More than Four 12 H Shifts W/No Fewer than Three Scheduled Days Off
ML20198B496
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/16/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
1004Y, SL-737, TAC-60732, TAC-60733, NUDOCS 8605220022
Download: ML20198B496 (3)


Text

  • , Georgia Power Company 333 Piedmont Avenue Atianta, Georg.a 30308 Teiephone 404 526 6526 Maihng Address-Post Off>ce Box 4545 Atlanta, Georgia 30302 b Georgia Power L T. Gucwa *"'"C*""'#

Manager Nuclear Safety and Licens ng SL-737 1004y May 16,1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 ADDITIONAL INFORMATION IN SUPPORT OF PROPOSED TECHNICAL SPECIFICATIONS CHANGE REGARDING SHIFT OVERTIME REQijIREMENTS Gentlemen:

Georgia Power Company's submittal of January 6, 1986, requested changes to the Plant Hatch Uni ts 1 and 2 Technical Specifications regarding requirements for shift overtime. Specifically, relief was sought from Specification 6.2.2.g, which presently requires that operating personnel work a " normal 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> day." The proposed change would allow implementation of a more flexible shift schedule which would incorporate alternating weeks of three and four 12-hour shifts. The NRC staff has requested additional information in regard to this change. The requested information is hereby provided.

Staff Question:

"What is the minimum time between shifts for the proposed shift schedule?"

Response

l l Under the proposed 12-hour shift schedule, personnel would normally I be scheduled to work no more than four consecutive 12-hour shifts with no fewer than three scheduled off-days prior to the next block ,

of 12-hour shif ts. Enclosure 1 is a preliminary schedule for the 12-hour shift program. This diagram covers a 10-week period. Shift schedules for each of the five teams are staggered but are otherwise identical. The letters "D" and "N" represent 12-hour day and night shi f ts, respectively. The letter "0" represents an off-day. The number "8" represents an 8-hour period normally reserved for cob 8605220022 DR ET&OS16 \

p ADOCK 05000312 PDR

\\'j

. _ _ _ . _ A

. y Georgia Power d Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Director of Nuclear Reactor Regulation May 16,1986 Page 2 training. Under some circumstances, this 8-hour period might be

. changed to a 12-hour day or night shift.

Staff Question:

"For licensed operators, what are the staffing requirements? How many operators are used per shift?"

Response

The Technical Specifications require that, during normal power operation for both units, each shift complement be comprised of three Licensed Reactor Operators and two Senior Reactor Operators. Plant Hatch typically operates, during normal power operation for both units, with a shift complement of four Licensed Reactor Operators and three Senior Reactor Operators.

4 Please contact this office if you desire further information.

Sincerely,

/C& e_-

L. T. Gucwa REB /lc Enclosure c: Georgia Power Company Nuclear Regulatory Commission Mr. J. P. O'Reilly Dr. d. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr. Senior Resident Inspector Mr. H. C. Nix, Jr.

GO-NORMS J

1 t--- - - -

m, -

. .~,p-.- - .~ w w w ,,,

y -343 wrg~ng,y 3 n n mp., ~- -

SL-737

~

1l0lmlClZlo 1 lZlOl0l0lo HlZlCl0lclc HlOlmlclzlo 3 3l=lClClclc 3l0lclclZlo

'kn Hl0l=l0lmlc Hlclml0lolZ h slo lZlClclO slclmlOlolZ blCi=lCl0lo y mlCl0lol0l=

mlolZlClClO O 2c

~

mlcl0lololZ 1 lZlololclQ g 1lololZlol0 '

rlZlol0lclc HlmlclZlolC 3l=lOlolclo Elmlol=lOlo .

rialZlciclo slmlolOl=lo .

slclololz!c -.

siclzlolmla m,

elol=lclOlO mlalolol=lc _.

oi E mIOlOlol=loL .~

r ml0lzlclolo

  1. " u. j o l o l'O l c l z u.l=I ciz ioio g.

rlOloleiciz slelclzlclc -

BiololelciZ EimlolzlclOl y rizjolmicial rl=lclol=ic E sl=lolmicio slmlolol=lc $"

el=loIOlo!o , miololol=lo ,=3 = m mi=lololo'Ol O ml0lalo!=to g[  !"

$4 m o A miclOlmiol= , clolzlololo 8- Ad E

-Icl=lOlolm $ t

~E r;Olaimici:

BIO loleiclZ Biol=lalolm "$ $ $

sl=lalmlolo slalOl=l0l= "$5 " J sl= aleloto slOlolZlcim-z elol0 ZlolO g

, mIz alojalo O mlZ ol0l0l0 ml0lolZl0lo S" l0l=lO Olm

> 1lOIOlcl=lo 1 rlo mlQlZlO HlQlZlo Olm 3l0 mlclZlo j 3lclZlO Olm HlOlmlCl0l= km Hlol0lZlclm slC mlclojz g slol0lZlclm f clo Ol0lolZ ml0lolZlDlO"

( mtC i OlOlOl=

N ml0lolZlClO

$ O N O t

N

< m o a w < c o a w E

E!

2 3l 3 .

m

.J