Requests Review of Encl plant-specific Lists by 860531, Adding Omitted Significant Actions & Providing Dates All Aspects of Requirements Completed/Implemented or Expected to Be Completed
ML20198B429
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/21/1986
From: Lynch M
Office of Nuclear Reactor Regulation
To: Agosti F
DETROIT EDISON CO.
References
NUDOCS 8605210622
Download: ML20198B429 (4)


Text

y DIST3180fEON:

.Decket No. 50-341 NRC PDR Docket No: 50-341 Local PDR RWD-3 r/f EAdensam EHylton MDLynch Mr. Frank Agosti HSmith, PPAS/TOS8 Vice President - Nuclear Operations SScott, ADMIN /TIDC Detroit Edison Company Attorney, OELD 6400 North Dixie Highway Edordan Newport, Michigan 48166 BGrimes JPartlow

Dear Mr. Sorensen:

RBernero ACRS (10)

Subject:

Tracking of Multi-Plant Actions The Comptroller General in a Report to the Congress dated September 19, 1984, stated "NRC needs better management controls to ensure implementation of generic issue solutions." To correct this situation, the Nuclear Regulatory Commission is working on a long-term program which will improve its documentation on the .

status of power reactor licensees' implementation of approved regulatory improvements.

To assist me in developing this information for Fermi-?, please review the enclosed plant-specific list, add omitted significant actions to the list, and provide the date that all aspects of each identified requirement were completed /

implemented or are expected to be completed. For each requirement that has been completed, enter " completed" under the Status column and the date the item was completed. For requirements that have not been completed / implemented, provide the projected date and enter " pro.iected" onder the Status column. I do not expect or want a ma.ior effort made to obtain precise dates. Rather, I will accept readily-known or best-estimate dates for actions that have been completely implemented. For example, the year only would be acceptable for completions prior to 1984; the month as well as year is needed for requirements completed after that time. For pro.iected completions / implementations in 1986, use month and year. Use year only for projections thereafter. Please provide a response in the form of a narked up listing by May 31, 1986.

In the future, NRR will need estimated dates prior to issuance of the safety evaluation so that the estimated schedule may be included in the evaluation.

PDR LE

r This requcat is covered by OMB Clearance Number 3150-0011, which expires September 30, 1986.

Sincerely, M. D. Lynch, Project Manager BWR Project Directorate No. 3 Division of RWR Licensing

Enclosure:

As stated cc: See next page i

,e l

  • *L PDLynch/hmc non E m-5/gV86 5//f/86 5//V86

Dr. Wayne Jens Detroit Edison Company Fermi-2 Facility cc: ,

Mr. Harry H. Voigt, Esq. Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W. Michigan Public Service Commission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq. Lansing, Michigan 48909 Senior Attorney The Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U. S. Nuclear Regulatory Comission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Dennis R. Hahn, Chief Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Robert Woolley Acting Supervisor-Licensing The Detroit Edison Company Fermi Unit 2 6400 No. Dixie Highway Newport, Michigan 48166 Mr. Paul Ryron U. S. Nuclear Regulatory Comission Resident Inspector's Office 6450 W. Dixie Highway niewport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161

INF0RMAT1ON TRACK 1NO SYSTEM PA2E NO.t' 166

-1288731-901 REOULAT0RY FAC1LITY IMPLEMENTATION 95/31/86' RCILITY: FERMI 2 LICENSE 0 POWERI 000 NNT PROJECT MANAGER P. ERICKSON LANT LOCATION: LAGUNA BEACH, MICH BRANCH CHIEF 8 E. ADENSAM DCKET NUMBER 8 959-80341 DESIGN POWERS 1993 D#4E NSSS VENDOR: GE LIC. ASSISTANT E. HYLTON RCN/ ENGINEER 8 SSL E INSPECTOR: . N/A -

m LIC ACT LICENSEE AC No. lgEA_.R TITLE COMPLETE STATUS DAIZ A-20 10 CFR 50.62 OPERATING REACTOR REVIENS N//S /

9094 7951 D-01 GE MARK 1 CONTAINMENT EVALUATION - LONG TERM 03/31/80C 58015 D-20 MARK I DRYMELL VACUUM BREAKERS - LICENSEE RESPONSE G