Text
October 24, 1985 c.
Docket No. 50-336 C
b i
g Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
RESPONSE TO GENERIC LETTER 83-28 ITEMS 3.1.3 AND 3.2.3 (POST-MAINTENANCE TESTING REQUIREMENTS)
The Commission has completed the review of your November 8,1983 response to Generic Letter 83-28 Items 3.1.3 and 3.2.3 Post-Maintenance Testing of Reactor Trip System Components and All Other Safety-Related Equipment, for Millstone Unit 2.
Items 3.1.3 and 3.2.3 are concerned with the review of existing technical specifications for post-maintenance testing requirements that may degrade rather than enhance safety.
Based on the review of your response, we have concluded that at the present time no post-maintenance test requirements were identified in the technical specifications that degrade safety. However, as part of your continuing evaluation, you should factor in such reviews to future technical specification changes to assure that future post-maintenance testing does not degrade the level of safety.
On this basis, we find your responses to these items are adequate in content and therefore are acceptable. We consider our review of items 3.1.3 and 3.2.3 complete.
Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing cc: See next page Distribution:
Docket File NRC & L PDRs Branch Files 00sborne PKreutzer ACRS 10 ordan
$1%04 85gg BGrimes p
PDR HTHompson ORB #3:h/h ORB #3:h 0 #bL PKreutzer /
D0sbdrth;ef u
her to /p2/85 1 0 /: 2185 to c./85
(.
- r. John F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 1 cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building l
Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy I
Division 80 Washington Street Hartford, Connecticut 06106 Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pennsylvania 19406 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Nuclear Power Station P. O. Box 128 Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 06385 u