ML20198A601

From kanterella
Jump to navigation Jump to search
Forwards Readiness Review Module 3A,Initial Test Program, Preoperational Test Phase Insp Rept 50-424/85-30 on 850514-0906.Program Acceptable W/Stated Exceptions. Deficiencies Noted
ML20198A601
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/21/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20198A604 List:
References
RTR-REGGD-01.095, RTR-REGGD-1.095 NUDOCS 8511060094
Download: ML20198A601 (3)


See also: IR 05000424/1985030

Text

._

<

.

.f(l fCRb

OCT 211995

Georgia P 'er Company

ATTN: r. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO. 3A, INITIAL TEST

l PROGP.AM, PRE 0PERATIONAL TEST PHASE - REPORT N0. 50-424/85-30

l

'

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on May 14, 1985. Periodic inspec-

tions were conducted at the Vogtle site and the resultant findings were discussed

with members of your staff at the conclusion of these inspections. Technical

reviews were conducted primari'y in NRC Bethesda offices and the findings from

these reviews have also been discussed with your staff.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report. Within these areas, the inspection and

verification consisted of selected examinations cf procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing comitments.

The primary results of Module No. 3A reviews and inspections are provided in the

Summary and Conclusions Sections of the enclosed report. Within the Findings

Section several deficiencies are identified. Your attention is invited to these

matters which will be pursued during future reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the Preoperational Test Program for Vogtle 1 is

acceptable and complies with applicable regulatory requirements with the excep-

tion of those items or areas identified in the report. Implementation of the

program will be inspected throughout the execution of the test program.

The conclusions within the report are based upon information currently avail-

able to the inspectors and reviewers. Should information subsequently become

available which was not considered during this review or which conflicts with

earlier information, it will be evaluated to determine what effects it may have

on the above conclusion.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED DY 9

giog Q 4 JOHN A. OLSHINSKI g

O J. Nelson Grace

Regional Administrator

Enclosure: (Seepage 2)

,

\\

SE0/

i .

O

.

-

.

Georgia Power Company 2

GCT 211985

Enclosure:

Report No. 50-424/85-30

g w/ enc 1:

R. E. Conway, Senior Vice President

, A lear Power

D. O. Foster, Vice President

, 3md General Manager Vogtle Project

W. H. Gregory, III, General

nager, Vogtle Nuclear Construction

. Bockhold, Jr., Vogtle

f ant Manager

L. T. Gucwa, Chief

j uclear Engineer

7uble A. Thomas,

Vice President-Licensing Vogtle

Jroject

kdGroover, Quality

surance Site Manager

, _ J. Hayes, QA Manager

.

W. T. Beckham, Vice President

& General Manager - Operations

J. A. Bailey, Project Licensing

,

janager

Weorge F. Trowbridge, Esq.

aw, Pittman, Potts and Trowbridge

ce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

Ernest L. Blake, Jr., Esq.

aw, Pittman, Potts and Trowbridge

ames E. Joiner, Troutman, Sanders,

ckerman and Ashmore

ames G. Ledbetter, Comissioner

Dejartment of Human Resources

1CKrles H. Badger, Office of

Planning and Budget, Management

g A view Division

'Ueppish Kirkiand, III, Counsel

Of ice of the Consumer's Utility

uncil

ouglas C. Teper, Georgians Against

Baclear Energy

Waurie Fowler, Legal Environmental

istance Foundation

im Johnson, Executive Director

,

'

Educational Campaign for a Prosperous

Georgia

i

cc: (Cont'd on page 3)

!

!

! __________ _ _ _____________ _ __

- . _ _ . - - _- ._ - _ -. ._ _

. .

'

.

OCT 211985  ;

Georgia Power Company 3

J Morton B. tiargulies, Esq. , Chairman

Administrative Judge, Atomic Safety

W d Licensing Board Panel

Dr. Oscar H. Paris, Administrative Judge

tomic Safety and Licensing Board Panel

stave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board

S$ P. Garde, Citizens Clinic Director

bec w/enci:

E. Reis, ELD i

W. M. Hill, IE

M. Miller, NRR -

i W. Brach, ED0

T. Michaels, NRR

A. Gibson, RII

A. Herdt, RII ',

F. Jape, RII

M. Sinkule, RII .

4 G. Schnebli, RII 3

i W. Rankin, RII -

g Resident Inspector

'

Document Control Desk l

State of Georgia

-

,

i ,

,

i l .

.

!

R RII ,

RII RII RI

GASchnebli FJape rdt son MS le V wnlee

10//e/85 10/g/85 / ///85 10/g/85 10/p/85 10/gT85

-

.

RII RII' NRR-DL D AVT-IE ELD  !

g 3D.$ pp On. Nonw ge ,

JMI ffhinski p HThompson EChristenbury

'

RWalker Grimes

10//f/85 10/(1/85 10//6 /85 10AS/85 10//p /85

i

!

p

- _ . . _ . _._ _ _ . _ _ . _ . - _ _ _ _ __