ML20198A601
| ML20198A601 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/21/1985 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20198A604 | List: |
| References | |
| RTR-REGGD-01.095, RTR-REGGD-1.095 NUDOCS 8511060094 | |
| Download: ML20198A601 (3) | |
See also: IR 05000424/1985030
Text
._
.f(l fCRb
<
.
OCT 211995
Georgia P 'er Company
ATTN:
r. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO. 3A, INITIAL TEST
l
PROGP.AM, PRE 0PERATIONAL TEST PHASE - REPORT N0. 50-424/85-30
l
'
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to the NRC on May 14, 1985.
Periodic inspec-
tions were conducted at the Vogtle site and the resultant findings were discussed
with members of your staff at the conclusion of these inspections.
Technical
reviews were conducted primari'y in NRC Bethesda offices and the findings from
these reviews have also been discussed with your staff.
Areas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations cf procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing comitments.
The primary results of Module No. 3A reviews and inspections are provided in the
Summary and Conclusions Sections of the enclosed report.
Within the Findings
Section several deficiencies are identified.
Your attention is invited to these
matters which will be pursued during future reviews and inspections.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the Preoperational Test Program for Vogtle 1 is
acceptable and complies with applicable regulatory requirements with the excep-
tion of those items or areas identified in the report.
Implementation of the
program will be inspected throughout the execution of the test program.
The conclusions within the report are based upon information currently avail-
able to the inspectors and reviewers.
Should information subsequently become
available which was not considered during this review or which conflicts with
earlier information, it will be evaluated to determine what effects it may have
on the above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED DY
9
4
JOHN A. OLSHINSKI g
giog Q
O
J. Nelson Grace
Regional Administrator
Enclosure:
(Seepage 2)
,
\\\\
SE0/
i
.
.
O
-
.
Georgia Power Company
2
GCT 211985
Enclosure:
Report No. 50-424/85-30
g w/ enc 1:
R. E. Conway, Senior Vice President
, A lear Power
D. O. Foster, Vice President
3md General Manager Vogtle Project
,W. H. Gregory, III, General
nager, Vogtle Nuclear Construction
. Bockhold, Jr., Vogtle
f ant Manager
L. T. Gucwa, Chief
j uclear Engineer
7uble A. Thomas,
Vice President-Licensing Vogtle
Jroject
kdGroover, Quality
surance Site Manager
, _ J. Hayes, QA Manager
.
W. T. Beckham, Vice President
& General Manager - Operations
J. A. Bailey, Project Licensing
janager
,
Weorge F. Trowbridge, Esq.
aw, Pittman, Potts and Trowbridge
ce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge
Ernest L. Blake, Jr., Esq.
aw, Pittman, Potts and Trowbridge
ames E. Joiner, Troutman, Sanders,
ckerman and Ashmore
ames G. Ledbetter, Comissioner
Dejartment of Human Resources
1CKrles H. Badger, Office of
Planning and Budget, Management
g A view Division
'Ueppish Kirkiand, III, Counsel
Of ice of the Consumer's Utility
uncil
ouglas C. Teper, Georgians Against
Baclear Energy
Waurie Fowler, Legal Environmental
istance Foundation
im Johnson, Executive Director
Educational Campaign for a Prosperous
,
'
i
cc:
(Cont'd on page 3)
!
!
- . _ _ . - -
_-
._
-
_
-.
._
_
.
.
'
.
OCT 211985
Georgia Power Company
3
J
Morton B. tiargulies, Esq. , Chairman
Administrative Judge, Atomic Safety
W d Licensing Board Panel
Dr. Oscar H. Paris, Administrative Judge
tomic Safety and Licensing Board Panel
stave A. Linenberger, Jr., Administrative
Judge, Atomic Safety and Licensing Board
S$ P. Garde, Citizens Clinic Director
bec w/enci:
E. Reis, ELD
i
W. M. Hill, IE
M. Miller, NRR
-
i
W. Brach, ED0
T. Michaels, NRR
A. Gibson, RII
A. Herdt, RII
',
F. Jape, RII
M. Sinkule, RII
.
4
G. Schnebli, RII
3
i
W. Rankin, RII
-
g Resident Inspector
Document Control Desk
l
'
State of Georgia
,
-
i
,
,
i
l
.
.
!
R
RII
RII
RII
RI
,
GASchnebli
FJape
rdt
son
MS
le V
wnlee
10//e/85
10/g/85
/ ///85
10/g/85
10/p/85
10/gT85
.
-
RII
RII'
NRR-DL
D AVT-IE ELD
!
g 3D.$
pp
On. Nonw
ge
,
RWalker
JMIffhinski p HThompson
Grimes
EChristenbury
'
10//f/85
10/(1/85
10//6 /85
10AS/85
10//p /85
i
!
p
- _ .
. _ .
_._ _ _ . _
_ .
.
-
_