ML20198A236
| ML20198A236 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/01/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML20198A241 | List: |
| References | |
| NUDOCS 8605200388 | |
| Download: ML20198A236 (2) | |
Text
ffh a
MAY 1 1986 ATTN: /a Power and Light Company Florid Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
FRANKLIN RESEARCH CENTER - FAILURE ANALYSIS REPORT OF CHECK VALVE GUIDE PIN Enclosed for your information is a copy of the Franklin Research Center (FRC) report of the auxiliary feedwater system steam supply valve parts from Turkey Point. The NRC requested these components be forwarded to FRC for an independent failure analysis.
Conclusions in FRC report are analogous to those presented in your LER 86-00L No new information was identified.
This report or portions will be included in a future inspection report of this matter and will therefore, become available in the Public Document Room.
Any questions or comments on the report may be addressed to Frank Jape on 404-331-4182.
Sincerely, jtbrf &lan dr -
J. Nelson Grace Regional Administrator
Enclosure:
FRC Technical Report No. F-5896-015 cc w/o encl:
J. M. Wethy, Vice President d.TurkeyPointNuclearPlant J. Baker, Plant Manager d.TurkeyPointNuclearPlant W. Bladow, Plant QA Superintendent v3. Arias, Jr., Regulatory and Compliance Supervisor bcc w/o encl:
C Resident Inspector ocument Control Desk tate of Florida RII Y,d RII Yd RIION RII II RII GSchnebli:ls FJapg ARHerdt A Gibson alker Dverrelli 4/py86-04p3 86 04/p/86
/\\ /86
/ \\ /86 5/l/86 0605200388 860501 PDR ADOCK 05000250 S
PDR g)
~
w I
MAYI 1986 FRANKLIN RESEARCH CENTER DIVISION OF ARVIN/CALSPAN 3
)
1 3
TECHNICAL REPORT r
3 1
3 7
7 20m m a s1 m 1s m o m e..,,,e m,,0.
- 70.,, mu m,
.,.o 1
.