Forwards Rev T to ITS Submittal,Dtd 961213.Rev Contains Changes to ITS Section 3.4, Reactor Coolant Sys Which Are Provided in Same Listed ten-section Format as Initial ITS Submittal
ML20198A057
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 12/14/1998
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198A063 List:
References
NUDOCS 9812160146
Download: ML20198A057 (8)


Text

Commonwealth Edsm Company tiraidwomi Generating Station Route si,llox Hi

!! races ille, !!. 60107% 19 Tel HI 5-658-280 t O)

\\

December 14,1998 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington D. C. 20555 - 0001

Subject:

Revision T to the Improved Technical Specifications (ITS) Submittal and Revised License Condition for Relocated items Byron Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-37 and NPF-66 NRC Docket Numbers: 50-454 and 50-455 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Numbers: 50-456 and 50-457 O

References:

(1) G. Stanley and K. Graesser (Commonwealth Edison) letter to NRC Document Control Desk, " Conversion to the Improved Standard Technical Specifications," dated December 13,1996 (2) K. Graesser (Commonwealth Edison) letter to NRC Document Control Desk, " Change to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident," dated May 29,1998 (3) T. Tulon (Commonwealth Edison) letter to NRC Document Control Desk," Comments on Byron and Braidwood Stations, Units 1 and 2 - Draft Safety Evaluation of Proposed Amendment on Improved Technical Specifications (ITS), and Submittal of the Byron and Braidwood ITS and ITS Bases," dated November 23,1998 (4) T. Tulon (Commonwealth Edison) letter to NRC Document Control f

Desk," Application for Amendment to Appendix C, Additional Conditions to Facility Operating Licenses," dated November 19,1998

^

(V 901215014k h 2 N 54 O

0 PDR ADOC PDR R

P A linicom Company

December 14,1998 dc U. S. Nuclear Regulatory Commission Page 2 The purpose of this letter is to provide Revision T to the referenced ITS submittal (Reference 1). ITS Revision T contains changes to ITS Section 3.4 (Enclosure 1) based on Commonwealth Edison (Comed) Company withdrawing changes associated with Reference 2 from the ITS submittal. The corresponding revised SER Tables and RAI Response are also provided.

During final reviews ofITS, it was identified that ITS Figure 3.7.16-3, representing Current Technical Specification (CTS) Figure 5.6-3, was incorrectly drawn. ITS Revision T (Enclosure 2) provides the corrected ITS Figure 3.7.16-3, consistent with the associated CTS Figure. Further, the misspelling of the word " Requirements" in the title ofITS Figures 3.7.16-2 and 3.7.16-3 was corrected. Additionally, the title ofITS Bases 3.7.8 was changed from " Essential Service (SX) Water System" to " Essential Service Water (SX) System," consistent with the title ofITS LCO 3.7.8. Revised ITS and Bases for Byron (Amendment 106) and Braidwood (Amendment 98), as previously submitted in Reference 3, are provided in Enclosures 1 and 2.

These Revisions are being provided in the same ten-section format as the initial ITS submittal:

1. Byron ITS
2. Braidwood(Brwd)ITS
3. Byron CTS Markups
4. Brwd CTS Markups
5. CTS Discussion of Changes (DOCS)
6. LCO Markups
7. LCO Justification for Differences (JFDs)
8. Bases Markups
9. Bases JFDs
10. No Significant Hazards Consideration (NSHC) 0 OV 2

December 14,1998

.s (j

U. S. Nuclear Regulatory Commission Page 3 Via a teleconference on December 10,1998, the NRC ITS Project Manager for Byron and Braidwood requested a revision to the proposed Additional Condition for relocated items that Comed previously submitted in Reference 4. Comed has reviewed and agreed to the requested revised Additional Condition, that reads as follows:

"The licensee is authorized to relocate certain requirements included in Appendix A to licensee-controlled documents. Implementation of this amendment shall include the initial relocation of these requirements to the appropriate documents, as described in the licensee's letter dated November 19,1998, and evaluated in the NRC staff's Safety Evaluation associated with this amendment."

The Implementation Date of the Additional Condition remains at 180 days after issuance of the ITS Amendment.

Via a separate teleconference on December 10,1998, with the NRC Technical Specifications Branch Lead ITS Reviewer for Byron and Braidwood, Comed informed the NRC that CTS DOCS 2.0-LA3 and 5.0-LA13 will be relocated to the Technical Requirements Manual rather that the Quality Assurance Manual. The corresponding

{}

revised SER Tables are provided.

Please address any comments or questions regarding this matter to our Nuclear Licensing Department.

Respectfully, IA T othy J. Tulon Site Vice President Braidwood Nuclear Generating Station : ITS Revision T, ITS Section 3.4 : ITS Revision T, ITS Section 3.7 cc:

NRC Regional Administrator - Region III Senior Resident Inspector - Braidwood Senior Resident inspector - Byron O

Office of Nuclear Facility Safety -IDNS G'

3

_A n

m m

/

Table A - Administrative Changes to CTS Discussion Description ITS CTS of Change of Change Requirement Requirement ITS Section 3.4, Reactor Coolant Systems F

  1. 'g "f"e.. _ _.. _. l_ _ J a_ _ _ 22 - _ A _ am_____

___..__A_J

,:_____A___J___A n__..__A ft A f"n J _ A _ J eJ 44 A_A___

q J J A_A*_--

3.4 7

V 5 %# vr u d 5 % v edv sa LV s u s svv4 ba spi rgvJ E Uqtaw a6wg5 55 5 U mg t 4JU s u p s% 5 5Mg p 5L E BE 6 \\pqubJL (W5 \\f La u bw u g#."v. 5 5 DV L'VB 5 J V.7.7DUUV15J 4 fman%"'

rt:_

A__

_ _i s e.. _ J _ _ __2_...___.Je__

r____r

_ _ s At _ aAn mA:_

a m_.. mn 5JJV!7U 5 5 530 stwa s s 5J Jure u u r%4 U 5 g w v uw vy yp 5 3Vu4 rg L5EJyvasug#4 5 V5 Es sU WL 5430 s y ss.s y 4.0, open-stem sciua"y inere estik't:ac than OTO because it ic-que.es operas: t, of the outsinatc actuaton t

-___ m.. _, m _ nm ns,_

-,u.._

1,_____.._J

.A _m_...J m_._A_J

._ m _ u r,_, _

buyU4J15ELy %J E LE EU E V B \\ W J, 3 I E U J, IE D I V YUU, BL JE 3V M BU bpU statw Q FE & 43 IU 375 5 Uh/IL.

L 3.4 A28 Not used.

P S

Q g

A_A'__..

J r - _ f'% A F'M # I- _ - _ - _ L *f 'A.

J.._

a_

__A___L'_

__A._.A'__

VI5 b u'A_.

X if.. _ _... _ _ _Yvv5U

%#.'v. a 5 nuuV13J ed."v."v nbuV3 5 J S 2 44 A_A.*___

O J J A_A'___

es.

w nVUVEEJ5 g CIIMIBIgI %f E T W 33 5Vp 3 ME.#ERIEy W WU L%# UMLV355UU% UV4W EEUV5 5 BLa y s E.Es5 u B U 5 b Vr3 5 8b he ab[

b b b45 b bh[5 Ekh5 tb b L5Be cb yh Ib v vb thiIthh y aI E I5 43 5

open1 tem etstometteeily c!osedNct used. This ltc5n is span because actens sie based on a pend ng LATI.

' proposed).

e__,

A,,

m__

%#U U eJ.y MI ULJ%#v%.

3.4 A30 Actions pertaining to inoperable PORVs were reformatted for clarification to be conditional upon 3.4.11 Actions A, 3.4.4 Actions a, the capability of the valve being manually sad auton.atca", cycled rather than upon excessive B, and E b, and c opetutem seat leakage. This is consistent with the intent of the CTS action requirements.

i 1

i 5

(By)- Byron specirc (Bw) - Braidwood specife Byron and Braidwood 1

A_TBL3.4

C~.)

O y

Table LA - Details Relocated from CTS Discussion of CTS Description of New-Control Change Reference Relocated Details Location Process Type ITS Section 3.4, Reactor Coolant Systems 3.4 LA8 Not Surveillande reduifemsnt ta perforrn 'an.18' month Channel Calibration of the TRM

$50.59 3

tssed4.4 A.1.a pressurizer power operated relief valves actuation instrumentation Relecated Detail Types 1

Details of System Design 3 Procedural Detads fer Meeting TS Requirements 2 Desenptm of System Operatm 4 Surveillance Requirements Icr Indicati0rHmly instrumentatm t

(By)- Byron specific (Bw)- Braidwood specife

(

Byron and Braidwood 1

LA_TBL3.4 i

i

g...-.

=_

_=;==._-. =

_;_..,= -.. _

Respons2 to NRC RAI For ITS Section 3A 08-Dec 98

___._..___..__.._.._._.___..__.L____.__

NRC RAI Number NRC issued Date RAI Status

[

3.4.I1-04 03/09/1998 Closed NRC Description ofIssue DOC LA8 CTS SR 4.4.4.1.a The licensee proposes to move the CTS requirement for Channel Calibration of the PORV actuation instrumentation to the j

TRM, but does not fully explain why specifying this requirement in TS is not necessary to ensure Operability of the PORV actuation instrumentation or how the retained surveillances ensure the Operability of this instrumentation. Comment: Revise DOC LA8 to address the concerns noted.

Comed Response to Issue 12/10/98 Revised Response: Comed has withdrawn the changes associated with the CTS License Amendment Request for Spurious SI at Power. Refer to revised CTS DOC 3.4-LA8. This change is provided in ITS Section 3.4 submittal Revision T.

Original Response: Comed will revise the ITS submittal to reflect our proposed resolution to the " Spurious SI at Power" issue. The CTS License Amendment Request (LAR)is expected to be docketed by April,30,1998. An ITS Revision

)

incorporating the CTS LAR will be submitted subsequently.

.===

_ :==========- =_==.==::====-===----

2.-

I l

i n

v 27

., ~

,m e ~.

Table LA - Details Relocated from CTS Discussion of CTS Description of New Control Change Reference Relocated Details Location Process Type ITS Section 2.0, Safety Limits 2.0 LA3 SL Action 2.1.1, Preparation, review, and submittal of a Safety Limit Violation Report within 14 days UF6ARTR

$50.59 3

SL Action 2.1.2, to the NRC, appropriate management personnel, and plant safety committees M'

6.7.1.b, 6.7.1.c following an SL violation.

L i

I I

h r

l l

e Relocated Detail Types 1

Details of System Design 3 Procedural Details for Meeting TS Requirements 6

2 Desenption of System Operation 4 Survet!!ance Requirements for indcatervonly Instrumentation

{

(By) - Byron specific (Bw)- Braidwood spectre Byron and Braidwood 1

LA_TBL2.0 l

l

.