ML20197J993

From kanterella
Jump to navigation Jump to search

Advises That ASME Code Case N-416, Alternate Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping Section Xi,Div 1, May Be Used within Limitations Stated in Inquiry & Reply Sections of Code Case
ML20197J993
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/11/1985
From: Bosnak R
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
References
CON-WNP-0805 TAC-58029, NUDOCS 8507170726
Download: ML20197J993 (1)


Text

'~

~

JUL 111985 y/_

Docket No. 50-397 MEMORANDUM FOR:

Thomas M. Novak, Assistant Director for Licensing Division of Licensing FROM:

Robert J. Bosnak, Acting Assistant Director for Components & Structures Engineering Division of Engineering

SUBJECT:

USE OF ASME CODE CASE N-416 FOR THE WNP-2, DOCKET NO. 50-397, TAC N0. 58029 The Mechanical Engineering Branch has completed its review of the Washington Public Power Supply System request for authorization to use ASME Code Case' N-416 for application in the repair or replacement of Class 2 piping for the WNP-2 plant, as discussed in the licensee's letter G02-85-313, dated June 14, 1985.

Code Case N-416, " Alternate Rules for Hydrostatic 6 Testing of Repair or Replacement of Class 2 Piping Section XI, Division 1,", is an acceptable Code Case which is approved as written with no additional requirements other than those specified in the Code Case.

The Code Case is expected to be endorsed by the NRC in a future revision of Regulatory Guide 1.147, " Inservice Inspection Code Case Acceptability ASME Section XI Division 1."

Code Case N-416 may, therefore, be used at the WNP-2 plant in the repair or replacement of Class 2 piping within the limitations stated in the " Inquiry" and " Reply" section of the Code Case.

Use of the Code Case should be documented in a future Amendment to the FSAR.

8 07170726 B50711 N

~'

ADOCK 05000397 Q E-WPD#

Robert J. Bosnak, Acting Assistant Director for Components & Structures Engine.ering Division of Engineering cc:

H. Thompson, DL B. D. Liaw, DE F. Miraglia, DL W. Johnston, DE W. Butler, DL H. Brammer, DE J. Bradfute, DL R. Kirkwet,d, DE J. Knight, DE F. Cherny, DE l

Co.ntact:

R. Kirkwood, DE:MEB x28436 r

s-l0FC

DE:MEB
DE:MEB

,/-:.____Q__)_::

j

.NE DE E

_f___

'NAME :5520/vgt

RKirkwood:
FCherny
RJBosnak
DATE
7/9/85
7/f/85
7/0) /85
7/ 10/85

/