ML20197J888

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-454/86-14 on 860401-30.No Violations Noted
ML20197J888
Person / Time
Site: Byron Constellation icon.png
Issue date: 05/15/1986
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20197J891 List:
References
NUDOCS 8605200197
Download: ML20197J888 (2)


See also: IR 05000454/1986014

Text

-

bll)h

.

.

RAY 151986

.

N

Docket No. 50-454

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. M. Hinds

Jr. , P.' G. Brochman, and R. M. Lerch of this office on April 1-30, 1986 of

activities at Byron Station Unit 1, authorized by NRC Operating License

No. NPF-37 and to the discussion of our findings with Mr. R. E. Querio and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly disciss any questions you have concerning this inspection.

Sincerely,

unr19 wA ;1p:Az;C.C VM.dh"

1

R. F. Warnick, Chief,

Reactor Projects Branch 1

Enclosure: Inspection Report

No. 50-454/86014(DRP)

See Attached Distribution

9605200197 860515

{DR ADOCK 05000454

j gp3

Poa

RIII .RIIg RI I

inds/mj M B

k

Wa0r ick

1

3q \s

e

'

,

.

>

Commonwealth Edison Company 2

ht4Y 151986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

i

i