ML20197J882
| ML20197J882 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/14/1986 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20197J885 | List: |
| References | |
| NUDOCS 8605200196 | |
| Download: ML20197J882 (2) | |
See also: IR 05000348/1986008
Text
yd\\oO
s
a
.
MAY 141986
Alabama, Power Company
ATTN: VMr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT:
REPORT NO. 50-348/86-08 AND 50-364/86-08
On April 14-18, 1986, NRC inspected activities authorized by NRC License
Nos. NPF-2 and NPF-8 for your Farley facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within these
. areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in. progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
\\Si
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-348/86-08
and 50-364/86-08
c w/ encl:
0. Whitt, Executive Vice President
. D. Woodard, General Manager -
j Nuclear Plant
v'W. G. Hairston, III, General Manager -
Nuclear Support
/J. W. McGowan, Manager-Safety Audit
_ j and Engineering Review
v'J. K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
~ b'cr w/ encl:
(See page 2)
8605200196 860514^
ADOCK 05000348
G
1i
JE6\\
,
-
.
,
.
Alabama Power Company
2
MAY I 41936
'c w/ encl:
C Resident Inspector
. Reeves, Project Manager, NRR
v00cument Control Desk
@ tate of Alabama
.
RII
RII
RI
IH0an'c
wsome:lb
ke
AHer
04/A/86
l$/86
g/86
-
[JV86