Text
-
_ .
. ~ . .
. . ,
.
. .
.
. .
_ . = _ _ . . _ _ _ _ _ _
,
-
I
.-
f "%,,'%
j
f
UNITED STATES
J
f-
5.[ i
NUCl. EAR REGULATORY COMMISSION
!
-
y
-
e
uo man v:
j b.
[
- h,M u.;! A DRr/E SIME JCC
g
j
uwam : sus emcu
.....
DEC l i 1998
-
1
G. R. Horn, Senior Vice President
of Energy Supply
Nebraska Public Power District
141415th Street
Columbus, Nebraska 68601
SUBJECT: NRC INSPECTION REPORT 50-298/98-07 AND NOTICE OF VIOLATION
Dear Mr. Horn:
From October 4 through November 14,1998, inspection was conducted at your Cooper Nuclear
Station reactor facility. The enclosed report presents the scope and results of that inspection.
During this inspection, two violations of NRC requirements were identified. The first violation
involved the use of standing orders to direct operator actions such that, in effect, procedure
changes were being implemented without processing the changes in accordance with Technical
Specifications requirements. The second violation involved the cycling of six torus-to-drywell
vacuum breakers prior to obtaining their as-found lift values. This practice preconditioned the
';
vacuum breakers, rendering the as-found test results invalid.
The NRC has concluded that information regarding the reason for the violations and the
corrective actions taken and planned to correct the violations and prevent recurrence are
already adequately addressed in this inspection report. Therefore, you are not required to
respond to this letter unless the description therein does not accurately reflect your corrective
actions or your position in that car;e, or if you choose to provide additionalinformation, you
should follow the instructions specified in the enclosed Notice.
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures and your response wiil be placed in the NRC Public Document Room.
Should you hata any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
!
,
'.
..
Charles S. Marschall, Chief
Project Branch C
l
Division of Reactor Projects
'
Docket No.:
50-298
License No.: DPR-46
i
9812150189 981211
ADOCK 05000298
G
}
r-
'
.-
.
\\
Nebraska Public Power District
-2--
Enclosures:
2. NRC Inspection Report
50-298/98-07
i
cc w/ enclosures:
John R. McPhail, General Counsel
Nebraska Public Power District -
P.O. Box 499
Columbus, Nebraska 68602-0499
J. H. Swailes, Vice President of
Nuclear Energy
Nebraska Public Power District
P.O. Box 98
Brownville, Nebraska 68321
l
B. L. Houston, Nuclear Licensing
j
and Safety Manager
'
Nebraska Public Power District
P.O. Box 98
'
. Brownville, Nebraska 68321
Dr. William D. Leech
1
MidAmerican Energy
l
907 Walnut Street
P.O. Box 657-
Des Moines, Iowa 50303-0657
Mr. Ron Stoddard
Lincoln Electric System
1040 O Street
'
P.O. Box 80869
Lincoln, Nebraska 68501-0869
Randolph Wood, Director
Nebraska Department of Environmental
'
Ouality
P.O. Box 98922
Lincoln, Nebraska 68509-8922
Chairman
Nemaha County Board of Commissioners
Nemaha County Courthouse
1824 N Street
Auburn, Nebraska 68305
l
- --,
,
__-
_ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .
..
i
a-
Nebraska Public Power District
-3-
1
l
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
.!
Nebraska Department of Health
'
' 301 Centennial Mall, South
- P.O. Box 95007
Lincoln, Nebraska 68509-5007
R. A. Kucera, Department Director
of Intergovernmental Cooperation
Department of Natural Resources
P.O. Box 176
Jefferson City, Missouri 65102
Jerry Uhlmann, Director
State Emergency Management Agency
P.O. Box 116
Jefferson City, Missouri 65101
Kansas Radiation Control Program Director
i
!
i
!
--
,
-
-
.
..
.. ..
._ .
.
,,
.
.
_
_ _ _ _ _ _ _
9 .
'
,
Nebraska Public Power District
-4-
l
E-Mail report to T. Frye (TJF)
E mail report to D. Lange (DJL)
i
E-Mail report to NRR Event Tracking System (IPAS)
- E Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
l
'
- bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Branch Chief (DRP/TSS)
RIV File
Project Engineer (DRP/C)
l
l
l'
!
!
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy
,
with enclosures "N" = No copy
l
l
RIV: RI
m l)/
ASRI
fM[/ PE
DRS/EB n ()/
DRS/MB
l
l
l
CESkinner %IfrO VGGaddyMd JFMelfi
p-
CAClark V %g. CJPaulk 09
[
12/ (p /98
12/(o /98
12/g /98l
12/ 7 /98
12/ 7 ,/98'
==:r
DRS/OB
C:DRS/MB
C:DRS/PSB l
C:DRP/C
TRMeadows b@f DAPowered P
BMurray %
CSMarschall(3M
'
121 'I /98
P
12/ 9 /98
12/ 4 /98
12/ u /98
OFFICIAL RECORD COPY
,
,__
. _ . _,
T
.e
h.
1'
Nebraska Public Power District
-4-
E Mail report to T. Frye (TJF) ;
E-mail repcrt to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
l
E Mail report to Document Control Desk (DOCDESK)
'
E Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
I
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS PSB
Branch Chief (DRP/C)
MIS System
Brunch Chief (DRP/TSS)
RIV File
Project Engineer (DRP/C)
,
)
To receive copy of document, Indicate in bow: "C" = Copy without enclosures "E" = Copy
'
with enclosures "N" = No copy
f
RIV: RI
_ fl/
ASRI
J
l
DRS/EB T J/
DRS/MB
'
CESkinner 1SIf& VGGaddy 7-)M JFMelfi
12-
pAClark PMt CJPaulk cy
f
12/ O /98
12/(c /98
12/ A /98/
12/ 7 /98
12/ 7 /98'
I DRS/OB
C:DRS/MB l
C:DRS/PSB
C:DRP/C
TRMeadows 3.. d'f DAPowers
s
BMurray %
CSMarschallCIM
12/ 'l /98
i
12/ / 98
12/ @ /98
12/a /98
/
OFFICIAL RECORD COPY