Monthly Operating Repts for May 1984
ML20197H725
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/31/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8406190157
Download: ML20197H725 (17)


Text

.,

OPERATLNG DATA REPORT DOCKET NO.

50-269 DATE 06-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:_

Oc nee 1 Notes

2. Reporting Period:

May 1 - May 31.1984 '

Year-to-date and cumulative

3. Licensed Thermal Power (MWt):

2568 capacity factors are calcu-934 lated using a weighted

. 4.' Nameplate Rating (Gross MWe)i 886 a m age h m h

'5. Design Electrical Rating (Net MWe):

dependable capacity.

J 6'. Maximum Dependable Capacity (Gross MWe):

899

7. Maximum Dependable Capacity (Net MWe):

860 8.' If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

None 9.- Power Level To Which Restricted,if Any (Net MWe):

N-

10. Reasons For Restrictions,If Any:

' This Month' Yr..to.Date Cumulative =

11. Hours in Reporting Period 744.0 3 647,0 95 352.0

.12. Number Of Hours Reactor Was Critical 737.9 3 622.1 68 162.7

- 13. Reactor Reserve Shutdown Hours

~

14. Hours Generator On.Line 733.9 3 614.1 65 003.4

?15. Unit Reserve Shutdown Hours 16.7 Gross Thermal Energy Generated (MWH) 1 860'377 9 240 600 155 538 632.

. _17.' Gross Electrical Energy Generated (MWH) 656 620 3 247 290 54 115 520

18. Net Electrical Energy Generated (MWH) 628 150 3 108 406 51 273 957
19. Unit Service Factor 98.7 99.1 68.2
20. Unit Availability Factor 98.7 99.1 68.2
21. Unit Capacity Factor (Using MDC Net) 98.2 99.1 62.4
22. Unit Capacity Factor (Using DER Net) 95.3 96.2 60.7
23. Unit Forced Outage Rate -

1.4 0.9 16.7

' 24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Each):

g Refueling'- November.19, 1984 - 10 Weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved 4

i(

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION c

9406190157'940531 DR ADOCK 0500026y (9p7)

r

!'t_.

AVERAGE DAILY' UNIT POWER LElfEL s

DOCKET NO.

50-269 UNIT Oconee 1

[

t

.DATE 6-15-84

.l

- COMPLETED BY J. A.,Reavis TELEPHONE 704-373-7567 MONTH.

iMay,11984 n

DAY-AVERAG'E DAl'LY~ POWER LEVEL' DAY ~

AVERAGE DAILY POWER' LEVEL'

- (MWe-Net)-

(MWe-Ne t)

_1 8661 17 864 l

~ --

. 2.1 867-18 863 T

. 866-19 863~

l

~

h R41 20

- 864 j

5..

~asa

.21 863

6-g67 22 863 t

' 7.

a66'

~ 23 863-18 866 24 863 9-'

867

- 25 863

~

10 a6a

'- 26

- 863 L

l1 867' 27 863 i

12 ::

327 28 863

^13 801 29 862 5

~ '14

- 864 30~

864 P

15:

864 31

- 864 16-

864-I

. INSTRUCTIONS 10n this format,: list the~ average daily unit power level in MWe-Net for each day In.the. reporting month.

Compute to the nearest whole megawatt.

0 2

w-w m---e er1e7--'w s

c-ew,-,

-%t-e=-y

-e-r-r v es--

9+-+,uve-p,.

-Fim+y-*,--e+9 q w,y

& yen',

y-.ger

-w s.swe g w ---

we~e u p-og-,m pr 9.y s-9 -%, e 9'w,-s.*

DOCKET NO.

50-269 UNIT SIIUTDOWNS AND POWER REDUCllONS UNIT NAME Oconee 1 DATE 6/15/84 t-COMPLETED ilY J. A. Reav h REPORT Af 0NTil May 1984 TELEPilONE 704-373 7sm7 "5

.5 E 3

237k Licensee

,E r k

Cause & Cos receive o

N...

D.ite g

3g g

jgy Event 3?

$l Action in 4

g$ 5 c2 5 i5 s Repent a uib 5V Preveni Reentrem;c v

i sQ 8-p 84-05-04 S

B CC VALVCX Turbine & Turbine Control Valve and Control Rod Drive Movement PT's 2

84-05-12 F

10.03 A

3 IB INSTRU High Pressure Initiated by BTU Limit from Hotleg Temperature Instrument Mal-function 9-p 84-05-12 F

A HH VALVEX Heater Drain Pump Discharge Valve l

Problems 4

4 i

1 2

.I 4

1 17: 17.u ced Reason:

Meilmd:

Exhihis G Insirnesions S Scholuled A liquipmen: Failure (Explain)

I Manual for Pseparation of Daia 11 Maintenance or Tes:

2 Manual Scram.

Enity Sheels for I.scensee C Ret ~ucting 1-Automatic Scram.

livens Repori (1.t!R) F le INtlRI.G.

D Regulatory Hesifiction 4 Other (Explain) 0161) 1: Opeaaior Training & License Examination 1 Adminisitative 5

G.Opeiational lis tor (lisphin)

Exhibit I Same Sousee 19/77)

Il OiInts liixP aini l

4

k I

DOCKET No: 50-269 UNIT: Oconee 1 DATE: June 15, 1984 NARRATIVE SIRD'ARY i

-Month:.May 1984_

~.

i

--The unit ran at 100% most of the month. On May 12th, the unit tripped due to a -faulty relay in the feedwater control system which caused reduced feedwater flow and a resulting reactor trip on-high pressure. -The unit returned to service the same day.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 1 2.

Scheduled next-refueling shutdown:

November 1984 3.

Scheduled restart following refueling:

January 1985 4.

Will refueling or resumption of operation thereafter require a technical Yes specification change or other license amendment?

If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A

-5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant chapges in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1210 1312*

8.

Present licensed fuel pool capacity:

Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

Aunust 1991 DUKE POWER COMPANY Date: June 15, 1984 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

  • Represents the combined total for Units 1 and 2.

o OPERATLNG DATA REPORT DOCKET NO.

S0-270 DATE 06-15-84 COMPLETED BY J.A. Reavis TELEPil0NE 704-373-7567 OPERATING STATUS Oconee 2 Notes

1. Unit Name:
2. Reporting Period: May 1 - May 31. 1984 Year-to-date and cumulative
3. Licensed Thennal Power IMWt):

2569 capacity factors are calcu-

4. Nameplate Rating (Gross 31We):

934 lated using a weighted 886 average for maximum

5. Design Electrical Rating (Net MWe):

899

6. Maximum Dependable Capacity (Gross MWe):

dependable capacity.

860

7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted,If Any(Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to Date Cumulative 744.0 3 647.0 85 272.0 II. Hours In Reporting Period

12. Number Of Houn Reactor Was Critical 744.0 3 647.0 60 960.5
13. Reactor Reserve Shutdown Hours

~

~

~

14. Hours Gener.itor On.Line 744.0 3 647.0 59 807.2
15. Unit Resene Shutdown Hours
16. Gross Thermal Ene.gy Generated (MWH) 1 901 266 9 362 567 141 853 234

,17. Gross Electrical Enerhy Generated (MWH) 654 340 3 229 330 48 334 186

18. Net Electrical Energy Uenerated (MWH) 627 877 3 099 152 45 910 721
19. Unit Service Factor 100.0 100.0 70.1
20. Unit Availability Factor 100 0 100 0 70_1
21. Unit Capacity Factor (Using MDC Net) 98.1 98.8 62.4
22. Unit Capacity Factor (Using DER Net) 95.3 95.9 60.8
23. Unit Forced Outage Rate 0.0 0.0 15.6
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eacht:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY C0\\lMERCIAL OPER ATION i

(0/77I w _

AVERAGE DAILY UNIT POWER LEVEL

^

DOCKET NO.

50- 270 UNIT _Oconee 2

[

DATE 6-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567

_HONTH May, 1984' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t)

(

1 849 17 845 1

848 18 844 r

3 849 19 842

-4

-948 20 841 5

849 21 843

'6 849 22 842 7

848 23 841 8

848 24 840 9

824 25 838 10 847 26 840 11 847 27 840 12 842 28-841 13 844 29 842 14 848 30 844 15 847 31 846 16 847 i

INSTRUCTIONS' On this format, list the average daily unit power level in HWe-Net for each day in the reporting month. Compute to the ncarest whole megawatt.

L mm m-m

liOCKET NO.

50-270' UNITSilUTDOWNS AND POWER HEDUCllONS UNIT NAME Oconee 2 DATE 6/15/84 COMPLETED HY J. A. Reavis RI: PORT AIONTI: May 1984 TELErilONE - 704-373-7567 e.

E E

    • L Cause & Cipreceive

.[ E 3

$ E5 Licenser E-r, g?

Date e-

%2 2s5 Evens

??

e.

Attism in S

j@

5 ;f, =

Rep.no e jig 5

Prevent Recurrente o

O B

CC VALVEX Control & Stop Valve PT's 6-p 84-05-09 S

i 2

.I

~

.I l': EmceJ Heaun. ;

kleilu4:

Exhihis G Instructiems -

S. Sthestnleil A-l'iguipment F.silure(Lxplaan) l-blanual for Pseparation of Dat.:

Il-klaintenance of Test 2-kl.mnal Scram.

Entry Sheets for 1.icensee C-Itefueling

.l-Automatic Sciam.

Event Report II.1:RIl'ile INtlRI.G.

4 Oshes (lixplain) 01611 D-Regulatory Resifiction l'-Ope.aior Training & License lixamination I:-Administrative 5

G-Opciainmal Ensue Ilhpt int thhihis I - Same Somee 19/77)

Il-Other IINplaiu)

r:-

DOCKET NO:

50-270 UNIT:

Oconee 2 DATE:

June 15,1984 NARRATIVE

SUMMARY

Month:

May 1984 The unit'ran at 100% all month except for stop and control valves PT's on May 9th.

O n

(

MONTHLY REFUELING INFORMATION REQDIST L

Oconee Unit 2 1.

Facility name:

2.

Scheduled next-refueling shutdown:

February 1985 3.

Scheduled restart following refueling:

April 1985 f-4.

Will refueling or resumption of operation thereafter require a technical i

Yes specification change or other license amendment?

If yes, what will these be?

Technical Specification Revision L

i i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

-N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

I k

t i

7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

1210 i

8.

Present licensed fuel pool capacity:

1312*

Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 June 15, 1984 DUKE POWER COMPANY Date:

t a

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 i

i

  • Represents the combined total for Units 1 and 2.

t i

-~

y-r e,

OPERATING DATA REPORT DOCKET NO, 50-287 DATE 06-15-84 CO>lPLETED S a' J.A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS oconee 3 Notes

1. Unit Name:

. 2. Reporting Period:

May 1 - May 31. 1984 Year-to-date and cumulative

3. Licensed Thermal Power (MWt):

2568 capacity factors are calcu-934 lated using a weighted

4. Nameplate Rating (Gross SIWE):

- 5. ' Design Electrical Rating (Net SIWE):

886 average for maximum 899 dependable capacity.

6. Maximum Dependable Capacity (Gross MWe):

860

' 7. Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

~

9. Power Level To which Restricted,if Any (Net MWe):
10. Reasons For Restrictions. If Any:

This Stonth Yr to.Date -

Camulative 744.0 3 647.0 82 919.0

11. Hours in Reporting Period 147.5 1 767.1 58 477.0
12. Number Of Hours Reactor Was Critical

~

~

~

13. Reactor Reserve Shutdown Hours 14.' Hours Generator On Line 125.2 1 740.7 57 323.3
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 169 124 4 217 160 139 709 724

.17. Gross Electrical Energy Generated (SIWH) 62 470 1 460 020 _

48 274 618

18. Net Electrical Energy Generated (MWH) 52 913 1 388 856 45'955 974
19. Unit Service Factor 16.8 47.7 69.1
20. Unit Availability Factor 16.8 47.7 69.1
21. Unit Capacity Factor (Using MDC Net) 8.3 44.3 64.3
22. Unit Capacity Factor (Using DER Net) 8.0 43.0 62.6

- 23. Unit Forced Outage Rate 0.0 0.2 14.8

24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION

/

(9/77i

p.;

, 3

' AVERAGE: DAILY UNIT POWER LEVEL-3 DOCKET NO.

50-287 UNIT Oconee 3 DATE 6-15-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH Mav. 1984

. DAY-AVERA'GE DdlLY POWER LEVEL DAY.

AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ne t) 1~

17

-2:

18

.3 19 4

20 1

5-21 4

61 22

.7-23 8~

24 9-25

.- 10 26 10 7

11 27 294

-.12'

'28 307

'.13 29 453

.14 30 659 15 31 687

'16

-INSTRUCTIONS On:this format, list the average dally unit power. level in MWe-Net for each day in-the reporting month. Compute to the nearest whole megawatt.

1 l

t r

DOCKET NO.

50-287 l' NIT SiluTDOWNS AND POWi!R REl>UCIIONS UNIT NAME Oconee 3 DATE 6/15/84 COMPLETED llY

.1 A. Raavic RI. PORT AfONTil May 1984

. TELEPilONE 704 373 7RA7 jg

'k 25*

Licensee E-r,

~t c.inse a cuirective o.iie 3

3; g

aga Ewns y

e-l Acusin tai 5 ;?, g; Repent a cn U 5'

Pieveni Recurrence AE 5

r e

o O

2 84-05-01 S

618.78 C

1 RC FUELXX End of Cycle 7 Refueling Outage 3-p 84-05-27 S

B RC FUELXX Power Escalation Physics Testin.g at 40% Power 4-p 84-05-29 S

B RC FUELXX Power Escalation Physics Testing -

at 60% Power B

RC FUELXX Power Escalation Physics Testing 5-p 84-05-29 S

at 75% Power HH PUMPXX Repair Mechanical Seals on Heater 6-p 84-05-31 F

A Drain Pump I

2 1

.I l: l'in ced Reamn; hiciln=l:

E.shihis G - Insirnesions -

S. Scheluleil A-l'iguipinent Failure (Explain) 1 -Manual for Psepas.nion of Data Il Maintenance of Test 2 Mannal Serain.

linery Sheets for I.neensee-c RefocI ng 1-Automatic Serain.

Event ReporI (1.lilu File INtliti G.

-l-Other (lixplaisil 01bl) 1)-Itegulatory Resisietion I -Ope..iior Training & t.seense lixainination I -Attminist rative 5

G.Opciational Estur (lisplain)

Esinhit I - S.une Somce l'7/77) ll-Other llisplaini

r-y DOCKET NO:

50-287 UNIT:

Oconee 3 DATE:

June 15, 1984 NARRATIVE

SUMMARY

Month:

May 1984 The unit returned from its end of cycle 7 refueling outage on May 26, 1984, and spent the balance of the month perfonning power escalation testing.

E t

en&

y_-

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: Oconee Unit 3 2.

Scheduled next refueling shutdown:

October 1985 3.

Scheduled restart following refueling:

December 1985 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes If yes, what will these be?

Technical Specification Revision If no,-has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblier (a) in the core:

177 (b) in the spent fuel pool:

75 8.

Present licensed fuel pool capacity: 825 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

August 1991 DUKE POWER COMPANY Date:

June 15, 1984 Name of

Contact:

J. A. Reavis Phone: 704-373-7567 4

7-OCONEE NUCLEAR STATION Monthly Operating Status Report 1.

Personnel Exposure For the monthfof April, 15 individual (s) exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 2.260 rem, which represents approximately 18.8% of that person's allowable annual limit.

2.

The total station liquid release for April has been compared with the. Technical Specifications annual value of 15 curies; the total release for-April was less than 10 percent of this limit.

The total station gaseous release for April has been compared with the derived Technical Specifications annual value of 15,000 curies; the total release for April was less than 10 percent of this limit.

9

m 4

DUKE POWER COMPMnr P.O. Box 33180 CHARLOTTE, N.O. 28242 HAL B. TUCKER retepuong um ammemswr (704) 373-4531 June 15, 1984

===. -

Director Office of Inspection and Enforcement

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk RE: Oconee Nuclear Station Docket Nos. 50-269, -270, -287

Dear Sir:

Please find attached information concerning the performance and operating status of the Oconee Nuclear Station for the month of May 1984.

-y.

Very truly yours, f [

p_

Hal B. Tucker JAR:scs Attachments cc: Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Ms. Helen Nicolaras, Project Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation HNBB-5715 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Washington, D. C.

20555 Senior Resident Inspector INPO Records Center Oconee Nucicar Station Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 f6 4

'll