Forwards Insp Rept 50-440/97-19 on 971027-31.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews W/Personnel & Observation of Activities in Progress
ML20197H609
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/25/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Myers L
CENTERIOR ENERGY
Shared Package
ML20197H613 List:
References
50-440-97-19, NUDOCS 9712310331
Download: ML20197H609 (4)


See also: IR 05000440/1997019

Text

.

- .

,

-

-

r

,

,

t

November 25,-1997

Mr. Lew W, Myers

Vice President - Nuclear.

.

Centerior Service Company

P.O. Box 97, A200

Perry, OH 44081

SUBJECT:

NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT

50-440/97019(DRS)

Dear Mr. Myers:

'

On October 31,1997, the NRC completed an inspection at your Perry Nuclear Power Plant.

l

On November 3,1997, the NRC contacted management in the radiation protection section

i

to discuss the results of this inspection, The enclosed report presents the results of this

inspection.

The inspection was an examination of activities conducted under your license as they relate

to radiation safety and to compliance with the Commission's rules and regulations and with

the conditions of your license. Within these areas, the inspection consisted of selective

,

j

examinations of procedures and representative records, interviews with personnel, and

observation of activities in progress.

[ :.

Overall, the radiation protection department was successful in maintaining station dose as

low as reasonably achievable, and the radiological control of outage work activities was

"

. effective. Additionally, corrective actions taken to address problems identified during the

main steam line plug installation were effective as evidenced through the successful

.

l

completion of the main steam line plug removal. We are concemed however with several

'

fecent instances when high radiation area controls were not in accordance with regulatory

requirements resulting in non-cited violations. While each example had been licensee

identified and corrective action has been initiated, these problems indicated that there were

several weaknesses in the high radiation area control pmgram We will continue to evaluate

the efiectiveness of Perry Plant actions to ensure the breadth of the high radiation area

= control issues are understood and corrected.

In accordance with 10 CFR 2.790 of the Commissions regulationsi a copy of this letter and

the enclosure will be placed in the NRC Public Document Room.

(

\\

o

ill!Il!Illl,5!Illll)ll'

c

.

_~

.-

'

.,

-

L. W. Myers .

2

November 25,1997

We will gladly discuss any questions you have conceming this inspection.

Sincerely,

/s/ J. A. Grobe

' John A. Grobe, Director

Division of Reactor Safety

'

Decket No - 50-440

License No. NPF-58 -

Enclosure:

' Inspection Report 50-440/97019(DRS)

1

cc w/encli

H. L. Hegrat, Manager, Regulatory Affairs

T. S. Rausch, Director, Quality and

Personnel Development

R. W. Schrauder, Director, Perry

Nuclear Engineering Department

W. R. Kanda, General fAanager,

Nuclear Power Plant Department

N. L Bonner, Director, Nuclear

t

Maintenance Department

H. W. Bergendahl, Director, Nucbar

Services Department

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio -

.

Public Utilities Commission

Roy P. Lessy, Jr., Esq.

,

1..

-

.

. . .

.

_ _ _ _ _ _ _ _ _ _ _ _

_ _ _ . _ . . _ _ _ _

-

_ _ -

_. -

. .

._ ,

_

_ . . , _ . . . _ __. _ .

_ . _ _ .

. . _

_

y-

- <

-

,

w

_;c

~

-

,

' ;

' ~

-

.

_

-

_

-

,

.-

- --

_9

Mr. Lew W. Myers : .

i

_

Vice President -' Nuclear:

i

Centerior Service Company-.

P.O. Box 97, A200

1

Perry, OH _44081 '

-: SUBJECT::

NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT-

50-440/97019(DRS).

i

Dear .Mr.- Myers
On. October 31,1997, thw NRC completed an inspection at your Perry Nuclear Power Plant.

On November 3,1997, the NRC contacted management in the radiation protection section

to discuss the results of this inspection. The enclosed report presents the results of this -

Inspection.

The inspection was an examination of activities coriducted under your license as they relate

'

' to radiation safety and to compliance with the Commission's rules and regulations and with

the conditions of ynur license. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with personnel, and

observation of activities in progress.

.

Overall,- the radiation protection department was successful in maintaining station dose as

.

low as reasonably achievable, and the radiological control of outage work activities'was

effective.:: Additionally, corrective actions taken to addres , problems identified during the

main steam line plug installation were effective as evidenced through the successful

completion of the main steam line plug removal. We are concemed however with several

recent instances when high radiation area controls were not in accordance with regulatory

~

requirements resulting in non-cited violations. While each example had been licensee-

identified and corrective action has been initiated l these problems indicated that there were

- several weaknesses in the high radiation area control program We will continue to evaluate -

the effectivenass of Perry Plant actions to ensure the breadth of the high radiation area

control issues are understood and corrected.

'

=In accordance1with 10 CFR 2.790 of the Commistions regulations, a copy of this letter and

the enclosure will be placed in the NRC Public Document Room.

t

3

-

a

$

.

J

_

x

?

l

%.

,

,

,' [..O [ ,

,.[

n

,

,

,, . , . . ,

,

,, , ,

4. y , ,

, . , . , ,

y

, ,

p

, . , e

, . - .

.

= .

- . - -

-

4 .

L

'

L W. Myers -

2

. We _will gladly discuss any questions you have conceming this inspection.

Sincerely,

John A. Grobe, Director

Division of Reactor Safety _

Docket No. 50-440

'

~

License No. NPF-58

' Enebsurei

inspection Report 50-440/97019(DRS)

Ice w/ encl:

H. L Hegrat, Manager, Regulatory Affairs

, T. S. Rausch, Director, Quality and

Personnel Development

R. W. Schrauder, Director, Perry

. Nuclear Engineering Department

W. R. Kanda, General Manag",

~ Nuclear Power Plant Department

N. L. Bonner, Director, Nuclear

Maintenance Department

H. W. Bergendahl, Director, Nuclear

Services Department

4-

Terry L. Lodge, Esq.

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio

Public Utilities Commission

Roy P. Lessy, Jr., Esq.

Distribution:

Docket File wj/ nel

Rlli PRR w/enct

Rlli Enf. Coordinator w/enct

PUBLIC 1E41 w/enci

SRI, Perry w/enci

TSS w/enci

OCFO/LFARB w/enci

LPM, NRR w/ encl

DOCDESK w/enci

DRP w/enci

' A. B. Beach, Rlll w/enci

CAA1 w/enct

' DRS w/enci

J. L. Caldwell, Rlli w/enct

'

-

COCUMENT NAME: G;\\DRS\\PER97019.DRS

1.

~ .

-

-

c . c ~ .n-.

v . c o

.n. m n.nv.n

v . m em -

OFFICE-

Rlil:DRS

_l

Rill:DRS

l

Rill:DRP

Rlll:DRS

l

NAME.

KSelburg:jp

GShsar

TKozak

JGrobe

DATE-

12/ /97

12/ /97

12/ /97.

12/ /97

OFFICIAL RECOND COPY

l

I

.-

.

.

.

-

--

.

.

.