Forwards Insp Rept 50-293/97-11 on 970914-1110 & NOV Re Three Licensed Operator Errors Involved W/Writing & Implementing Tagout for Backup Battery Charger Breaker,Which Resulted in Tagging Breaker in Wrong Position
ML20197H234
Person / Time
Site: Pilgrim
Issue date: 12/11/1997
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Olivier L
BOSTON EDISON CO.
Shared Package
ML20197H238 List:
References
50-293-97-11, NUDOCS 9712310227
Download: ML20197H234 (5)


See also: IR 05000293/1997011

Text

..

4

_

v

,

t=

.

'

.

December 11,1997

Mr. Leon J. O'ivier

~ l

- Vice President - Nuclear

<

Boston Edison Company

Pilgrim Nuclear Power Station

600 Rocky Hill Road

Plymouth, Massachusetts 02360-5599

,

SUBJECT:

PILGRIM INSPECTION REPORT 50 293/97-11 AND NOTICE OF

VIOLATION

'

Dear Mr. Olivier:

"On November 10,1997, the NRC completed an inspection at the Pilgrim N sclear Power

Station in Plymouth, Mattachusetts. The enclosed report presents the results of that

inspection.

During the eight (8) weeks covered by this inspection period, the conduct of activities at

the Pilgrim facility was characterized by safe plant operations. Operators responded

effectively to two different events. The events involved the partialloss of foed water

-:

'

heating and ako the unplanned trip of a reactor recirculation pump.

+~

Based on the resu' ' sf this inspection, a violation of NRC requirements was identified

involving two examples of problems with tagging process implementation. The first

example involved three licensed operator errors involved with writing and implementing a

tngout for the backup battery charger breaker, which resulted in tagging the breaker in the

wrong position. We acknowledge the positive actions of an off going operator who

identified this tagging error; however, we chose not_to exercise discretion and cite this

violation based on the multiple errors made and a weakness in your apparent cause

analysis. The NRC also identified a second tagging error involving the adequacy of the

boundary valve tagout for the air start compressor for the "A" emergency diesel generator.

.-

. You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. In your response, you should document

the specific actions taken and any additional actions you plan to prevent recurrence. Your

response may reference or include previous docketed correspondence if the

correspondence adequately addresses the required response. After reviewing your

response to this Not!ce, including your proposed' corrective actionji and the results of

_

future inspections, the NRC will determine whether further NRC pnforcement action is

necessary to ensure _ compliance with NRC regulatory requirempts.

[

t

'

I 'h

'

9712310227 971211

-

PDR

ADOCK 05000293

O

PDR

i

. Tl

'

I.lll.lLi.lil. l.lllIL.I,l.l

-

.

.

__

4

La

.-

'

L Olivier

2'

-in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR). To the extent

. possible, your response should not include any personal privacy, proprietary, or safeguards

information so that it can be placed in the PDR without redaction.

1

The retponses directed by this letter and the enclosed Notice are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

Curtis J. Cowgill, Ill, Chief

Reactor Projects Branch No. 5

Division of Reactor Projects

. Docket No.: 50-293

' License No.: DPR-35

Enclosure:

Notice of Violation

Inspection Report 50 293/97-11

-.

-

-

.

.

. _

. -,

..

- -.

-

l

4

h

,

-

L. Olivier --

35

~

~

cc w/ encl:'

-

R. Lodgett, Executive Vice Presid int - Operations
.C. Goddard, Plant Department M snager.

.

,

-

. N. Desmond, Regulatory R6'etions -

-

D.-Tarantino, Nuclear _ inform ation Manager

. R. Hallisey, Department of Public Health, Commonwealth of Massachusetts -

-

~ The Honorable Therese Murrt v.-

I

- The Honorable Joseph Gallitano

. B. Abbenet, Department of Fublic Utilities

- Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Chairman, Nuclear Matters Committee

Plymouth Civil Defense Director

l

! P. Gromer, Massachusetts Secretary of Energy Resources

' iJ. Miller, Senior lssues Manager

~J. Fleming ' . .

A. Nogee, MASSPihu ;

.

,

Office of the Commissioner, Massachusetts Department of Environmental Quality

i

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

.

T. Rapone, Massachusetts Executive Office of Public Safety

- Chairman, Citizens Urging Responsible Energy.

- Commonwealth of Massachusetts, SLO Designee

>

1

.

n

.!

.

.-

a

T

.-

_-

A-

-

r

.

.

.

. .

-....

...- - - .

_- . - -

.. . . ... . . . - . - . .

~ .

_

,

-

-

'

_

"

}

1

'

, ..

L .Olivier -

4

i-

.

.,

.

1

Distribution w/ encl.

' Region I Docket Room (with concurrences)

PUBLIC;

,

_

- Nuclear Safety information Center (NSIC) -

i

NRC Resident inspector

l

H. Miller, RA/W Axelson, DRA -

!

-

L.C.' Cowgil, DRP

R Summers, DRP

e

C. O'Daniell, DRP .

]n

'

Distribution w/e'ici (VIA E-MAIL);

+

. R._ Eat _on; NRR

. i

'

A. Wang, NRR1

.

l

-

<

lK Kennedy, OEDO

.

t

R. Correia, NRR '

~ F. Talbot, NRR -

4

DOCDESK.

.

Inspection Program Branch, NRR (IPAS)-

3

,

1

s

h

1

.

r

,

.

~

! DOCUMENT NAME: G:\\ BRANCH 5\\9711 A.PIL .

,

- To receive a copy of this document, indicate in the box:

C" =' Copy without

"

attachment / enclosure M"E" - Copy with attachment / enclosure . "N" = No copy -

"

[

OFFICE -

Rl/DRP [g C-

l

Rl/DRP-

l-

/--

l

/

l

ll "

.

NAME-

CCowgdli

-

I *i

'

DATE-

.-12/g /97

e

j':

.

OFFICIAL RECORD COPY:

e;

,y

,

t

,

y

4

$

- ---

,e

g-

w.y-s

ig y 4m

.g

ycyy-<

em

+m%,,

ye

w

.wy>4.-4

>-r.-9mmv

m-m

, :iy

. .

~

+

.-

~ .-

. . ...

.

. - - .

-.

.-

-.

- - . . - . - . . . . .

-

,

. ..

1

v

u

..

. L. Olivier:

3-

1

j

'cc w/ encl;

~

'

R. Ledgett, Executive Vice President e Operations

.}

C. Goddardi Plant Department Manager:

1

N. Desmondi Regulatory Relations .

~

,

D. Tarantino,' Nuclear Information Manager;

.

R.- Hallisey, Department of Public Health, Commonwealth of Massachusetts -

=

,

. The Honorable Therese Murray;

The Honorable Joseph Gallitano.-

-

B." Abbanat, Department of Public Utilities..

Chairman, Plymouth Board of Selectmen

,

Chairman, Duxbury Board of Selectmen

Chairmai., Nuclear Matters Committee

"

= Plymouth Civil Defense Director

P. Gromer, Massachusetts Secretary of Energy Resources -
j

~

- JJ Miller, Senior issues Manager

,;

,

'

DJ. Fleming -

_

,

- A. Nogee, MASSPIRG -

Office of the Commissioner, Massachusetts Department of Environmental Quality.

. Engineering

' Office of the Attorney General, Commonwealth of Massachusetts

!

<

T. Rapone, Massachusetts Executive Office of Public Safety

Chairman, Citizens Urging Responsible Energy

Commonwealth of Massachusetts, SLO Designee

,

'

,

4

4

4

9

f

.

I .

.

s

.y

y

1

dB

6,

,

3.--

-

.

C

_

'

. : . . ~ . - .

+ '

,1

.

-.

- . ,

,

.-