AVERAGE DAILY UNIT POWER LEVEL o
i DOCKET NO. 50-245 UNIT Millstone 1 DATE 840606 COMPLETED BY G. Harran TELEPHONE 203/447-1791 Ext. 4194 MONTH May 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 S/D 17 S/D 2
S/D 18 S/D 3
S/D 19 S/D 4
S/D 20 S/D l
5 S/D 21 S/D 6
S/D 22 S/D 7
S/D 23 S/D 8
S/D 24 S/D 9
S/D 25 S/D 10 S/D 26 S/D 11 S/D 27 S/D 12 S/D 28 S/D 13 S/D 29 S/D 14 S/D 30 S/D 15 S/D 31 S/D S/D 16 INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
$4g6 ggjfo h g
/gl p"
c y.
OPERATING DATA REPORT DOCKET NO. 50-245 (April 1984 R /ised)
DATE 840506 COMPLETED BY G. Harran TELEPHONE 203/447-1791 Ext. 4194 OPERATING STATUS t
1.
Unit Name: Millstone 1 Notes 2.
Reporting Period: April (Revised) 3.
Licensed Thermal Power ( W t): 2021 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net We): 660 6.
Maximum Dependable Capacity (Gross MWe): 684 7.
Maximum Dependable Capacity (Net MWe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
I Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net ;We): N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period
- 719
- 2903
- 117647 12.
Number Of Hours Reactor Was Critical 321 2505 89269.2 13.
Reactor Reserve Shutdown Hours 0
0 2//5.8 14.
Hours Generator On-Line 314.2 2498.2 86515.4 15.
Unit Reserve Shutdown Hours 0
0 26.5 4
16.
Gross Thermal Energy Generated (MWH) 595992 4899866 157948734 17.
Gross Elec. Energy Generated (MWH)-
202600 1676200 53039396
- 18. Het Electrical Energy Generated (MWH) 191481 1598//4 50580031 19.
Unit Service Factor
" 43.7
" 86.1 73.5 20.
Unit Availability Factor
" 43.7
= 86.1 73.6 21.
Unit Capacity Factor (Using MDC Net) 40.7 84.2 65.7 22.
Unit Capacity Factor (Using DER Net)
" 40.4 83.4 65.1 23.
Unit Forced Outage Rate 0
0 13.7 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
July 1 1984
'26.
Units In Test Status (Prior to Commercial Operation):
Forecast Acnieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0tNERCIAL OPERATION
- Indicates corrections to the April report due to an error in " Hours In Reporting Period" which should been 719 because of Daylight Saving Time.
OPERATING DATA REPORT DOCKET NO. 50-245 DATE 840606 COMPLETED BY G. Harran TELEPHONE 203/447-1/91 Ext. 4194 OPERATING STATUS 1.
Unit Name: Millstone 1 Notes 2.
Reporting Period: May 1984 3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net MWe): 660 6.
Maximum Oependable Capacity (Gross MWe): 684 7.
Maximum Dependable Capacity (Net MWe): 654 8.
If Changes Occur ir Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 1
11.
Hours In Reporting Period 744 3647 118366 12.
Number Of Hours Reactor Was Critical 0
2505 89269.2 13.
Reactor Reserve Shutdown Hours 0
0 2//5.8 i
14.
Hours Generator On-Line o
2498.2 86515.4 15.
Unit Reserve Shutdown Hours 0
0 26.5 16.
Gross Thermal Energy Generated (MWH) 0 4899866 157948734 l
- 17. Gross Elec. Energy Generated (MWH) 0 1676200 53039396 l
18.
Net Electrical Energy Generated (MWH)
(-2966) 1595808 50577065 19.
Unit Service Factor 0
68.5 73.1 20.
Unit Availability Factor 0
68.5 73.1 21.
Unit Capacity Factor (Using MDC Net) 0 66.9 65.3 22.
Unit Capacity Factor (Using DER Net) 0 66.3 64.7 l
23.
Unit Forced Outage Rate 0
0 13.7 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each).
N/A l
25.
If Shut Down At End Of Report Period, Estimated Date of Startup: July 1, 1984 l
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0ttiERCIAL OPERATION l
I DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 (April 1984 Revised)
DATE 840508 COMPLETED BY G. Harran REPORT MONTH April (Revised TELEPHONE 203/447-1/91 Ext. 4194 l
2 No.
Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)
Shutting Event Code Code Action to 3
Down Reactor Report #
Prevent Recurrence 1
2 840414 5
404.8 C
1 N/A N/A N/A Refueling Outage Scheduled from 840514 to 840630 i
i i
i 1
2 3
4 i
F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from -
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5
G-Operational Error (Explain)
(Duration = 0)
Exihibit 1 - Same Source H-Other (Explain) 9-Other (Explain)
- Revised due to an error in reporting " April's Hours in Reporting Period" g
DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS.
UNIT NAME Millstone 1 DATE 840606 COMPLETED BY G. Harran REPORT MONTH May TELEPHONE 203/447-1791 Ext. 4194 l
2 No.
Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)
Shutting Event Code Code Action to 3
Down Reactor Report #
Prevent Recurrence 2a 840501 S
744 C
4 N/A N/A N/A Refueling Outage 1
2 3
4 F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)
E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5
G-Operational Error (Explain)
(Duration = 0)
Exihibit 1 - Same Source H-Other (Explain) 9-Other(Explain)
W
~
a REFUELING INFORMATION REQUEST 1.
Name of facility: Millstone 1 2.
Scheduled date for next refueling shutdown:
December 1985 3.
Schedule date for restart following refueling: February 1986 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Changes Recarding:
(1) Maximum Average Planar Linear Feat Generating Rate (2) Maximum Critical Power Ratio P
5.
Scheduled date(s) for submitting licensing action and t
supporting information:
Fall 1985 6.
Important licensing considerations associated with refueling, e.g.,
l new or different fuel design or supplier, unreviewed design or i
performance analysis methods, significant changes in fuel design, new operating procedures:
i 200 GE7B Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent l
j fuel storage pool:
(a) In Core: (a) 580 (b) 1346 l
l 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
2184 Assemblies 9.
The projected date of the last refueling that can be d hcharged to l
the spent fuel pool assuming the present licensed capacity:
1 1986, Spent Fuel Pool Full Core Off Load Capability is Reached.
1991 Core Full, Spent Fuel Pool Contains 2146 Bundles.
i GH:ejz
D NORTHEAST IfTILITIES S'a" o"'"" S*'*a S"' 8""a coa"acu' 7,,7MQ%",' *,",,",
P.O. BOX 270 HARTFORD. CONNECTICUT 06141-0270
.ex,m n..o co.
=oa'se' w e cow (203) 666-6911 g
g g
l June 12, 1984 l
MP-6093 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Reference:
Provisional License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Very truly yours, l
NORTHEAST NUCLEAR ENERGY COMPANY y
.4/
E. J. Mroczka l
i Station Superintendent Millstone Nuclear Power Station l
EJM/GRH:ejz
Enclosures:
( )
cc:
Director, Office of Inspection and Enforcement, Region I i
Director, Office of Inspection and Enforcement, Washington, D. C. (10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 l
l i
i