AVERAGE DAILY UNIT POWER LEVEL o

i DOCKET NO. 50-245 UNIT Millstone 1 DATE 840606 COMPLETED BY G. Harran TELEPHONE 203/447-1791 Ext. 4194 MONTH May 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 S/D 17 S/D 2

S/D 18 S/D 3

S/D 19 S/D 4

S/D 20 S/D l

5 S/D 21 S/D 6

S/D 22 S/D 7

S/D 23 S/D 8

S/D 24 S/D 9

S/D 25 S/D 10 S/D 26 S/D 11 S/D 27 S/D 12 S/D 28 S/D 13 S/D 29 S/D 14 S/D 30 S/D 15 S/D 31 S/D S/D 16 INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

$4g6 ggjfo h g

/gl p"

c y.

OPERATING DATA REPORT DOCKET NO. 50-245 (April 1984 R /ised)

DATE 840506 COMPLETED BY G. Harran TELEPHONE 203/447-1791 Ext. 4194 OPERATING STATUS t

1.

Unit Name: Millstone 1 Notes 2.

Reporting Period: April (Revised) 3.

Licensed Thermal Power ( W t): 2021 4.

Nameplate Rating (Gross MWe): 662 5.

Design Electrical Rating (Net We): 660 6.

Maximum Dependable Capacity (Gross MWe): 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

I Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net ;We): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period

  • 719
  • 2903
  • 117647 12.

Number Of Hours Reactor Was Critical 321 2505 89269.2 13.

Reactor Reserve Shutdown Hours 0

0 2//5.8 14.

Hours Generator On-Line 314.2 2498.2 86515.4 15.

Unit Reserve Shutdown Hours 0

0 26.5 4

16.

Gross Thermal Energy Generated (MWH) 595992 4899866 157948734 17.

Gross Elec. Energy Generated (MWH)-

202600 1676200 53039396

18. Het Electrical Energy Generated (MWH) 191481 1598//4 50580031 19.

Unit Service Factor

" 43.7

" 86.1 73.5 20.

Unit Availability Factor

" 43.7

= 86.1 73.6 21.

Unit Capacity Factor (Using MDC Net) 40.7 84.2 65.7 22.

Unit Capacity Factor (Using DER Net)

" 40.4 83.4 65.1 23.

Unit Forced Outage Rate 0

0 13.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

July 1 1984

'26.

Units In Test Status (Prior to Commercial Operation):

Forecast Acnieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0tNERCIAL OPERATION

  • Indicates corrections to the April report due to an error in " Hours In Reporting Period" which should been 719 because of Daylight Saving Time.

OPERATING DATA REPORT DOCKET NO. 50-245 DATE 840606 COMPLETED BY G. Harran TELEPHONE 203/447-1/91 Ext. 4194 OPERATING STATUS 1.

Unit Name: Millstone 1 Notes 2.

Reporting Period: May 1984 3.

Licensed Thermal Power (MWt): 2011 4.

Nameplate Rating (Gross MWe): 662 5.

Design Electrical Rating (Net MWe): 660 6.

Maximum Oependable Capacity (Gross MWe): 684 7.

Maximum Dependable Capacity (Net MWe): 654 8.

If Changes Occur ir Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe): N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 1

11.

Hours In Reporting Period 744 3647 118366 12.

Number Of Hours Reactor Was Critical 0

2505 89269.2 13.

Reactor Reserve Shutdown Hours 0

0 2//5.8 i

14.

Hours Generator On-Line o

2498.2 86515.4 15.

Unit Reserve Shutdown Hours 0

0 26.5 16.

Gross Thermal Energy Generated (MWH) 0 4899866 157948734 l

17. Gross Elec. Energy Generated (MWH) 0 1676200 53039396 l

18.

Net Electrical Energy Generated (MWH)

(-2966) 1595808 50577065 19.

Unit Service Factor 0

68.5 73.1 20.

Unit Availability Factor 0

68.5 73.1 21.

Unit Capacity Factor (Using MDC Net) 0 66.9 65.3 22.

Unit Capacity Factor (Using DER Net) 0 66.3 64.7 l

23.

Unit Forced Outage Rate 0

0 13.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each).

N/A l

25.

If Shut Down At End Of Report Period, Estimated Date of Startup: July 1, 1984 l

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved i

INITIAL CRITICALITY INITIAL ELECTRICITY N/A C0ttiERCIAL OPERATION l

I DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 (April 1984 Revised)

DATE 840508 COMPLETED BY G. Harran REPORT MONTH April (Revised TELEPHONE 203/447-1/91 Ext. 4194 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence 1

2 840414 5

404.8 C

1 N/A N/A N/A Refueling Outage Scheduled from 840514 to 840630 i

i i

i 1

2 3

4 i

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from -

(NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exihibit 1 - Same Source H-Other (Explain) 9-Other (Explain)

    • Revised due to an error in reporting " April's Hours in Reporting Period" g

DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS.

UNIT NAME Millstone 1 DATE 840606 COMPLETED BY G. Harran REPORT MONTH May TELEPHONE 203/447-1791 Ext. 4194 l

2 No.

Date Type Duration Reason Method of Licensee Systeg Compogent Cause & Corrective (Hours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence 2a 840501 S

744 C

4 N/A N/A N/A Refueling Outage 1

2 3

4 F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exihibit 1 - Same Source H-Other (Explain) 9-Other(Explain)

W

~

a REFUELING INFORMATION REQUEST 1.

Name of facility: Millstone 1 2.

Scheduled date for next refueling shutdown:

December 1985 3.

Schedule date for restart following refueling: February 1986 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Recarding:

(1) Maximum Average Planar Linear Feat Generating Rate (2) Maximum Critical Power Ratio P

5.

Scheduled date(s) for submitting licensing action and t

supporting information:

Fall 1985 6.

Important licensing considerations associated with refueling, e.g.,

l new or different fuel design or supplier, unreviewed design or i

performance analysis methods, significant changes in fuel design, new operating procedures:

i 200 GE7B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent l

j fuel storage pool:

(a) In Core: (a) 580 (b) 1346 l

l 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

2184 Assemblies 9.

The projected date of the last refueling that can be d hcharged to l

the spent fuel pool assuming the present licensed capacity:

1 1986, Spent Fuel Pool Full Core Off Load Capability is Reached.

1991 Core Full, Spent Fuel Pool Contains 2146 Bundles.

i GH:ejz

D NORTHEAST IfTILITIES S'a" o"'"" S*'*a S"' 8""a coa"acu' 7,,7MQ%",' *,",,",

P.O. BOX 270 HARTFORD. CONNECTICUT 06141-0270

.ex,m n..o co.

=oa'se' w e cow (203) 666-6911 g

g g

l June 12, 1984 l

MP-6093 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.

Very truly yours, l

NORTHEAST NUCLEAR ENERGY COMPANY y

.4/

E. J. Mroczka l

i Station Superintendent Millstone Nuclear Power Station l

EJM/GRH:ejz

Enclosures:

( )

cc:

Director, Office of Inspection and Enforcement, Region I i

Director, Office of Inspection and Enforcement, Washington, D. C. (10)

U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C. 20555 l

l i

i