Interim Deficiency Rept DER 84-18 Re Wiring Error on LPSI Pump B,Switch CS-3.Initially Reported on 840326.Time Extension Until 840718 Requested Because of Extensive Investigation & Evaluation Required
ML20197G946
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/05/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29664-TDS, DER-84-18, NUDOCS 8406180218
Download: ML20197G946 (2)


Text

.

  1. wgo Arizona Public Service Company
p y

{: 7 June 5,1984 'E N ANPP-29664-TDS/TRE U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop,, Director Division of Resident Reactor Projects and Engindering Programs

Subject:

Time Extension For Report - DER 84-18 A 50.55(e) Potentially Reportable Deficiency Relating To Wiring Error On LPSI

'B' Pump CS-3 Switch.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on lurch 26,1984 i

(B) ANPP-29315, dated April 18, 1984 (Interim Report)

Dear Sir:

i The NRC was notified of a potentially reportable deficiency in 4

i Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by June 12, 1984.

1 Dte to the extensive investigation and evaluation required, it is now l

expected that this information will be finalized by July 18, 1984, at I

which time a complete report will be submitted.

1 i

There is no new information or change to the Interim Report at this time.

l Very truly yours,

$ b o rcs yN.

E. E. Van Brunt, Jr.

APS Vice President i

i i

Nuclear Production ANPP Project Director l

EEVB/TRB:db t

i cc: See Page Two memp*.

ZE.27 e

~.

Mr. T. W. Bishop DER 84-18 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. W'eds, Jr.

o D. B. Kurner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza B. S. Kaplan D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen G. A. Flore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339

[.

--