In Reply Refer To:
Docket: 50-298/84-10
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Pouer Group
P. O. Box 499
Colud us Nebraska 68601
Gentlemen:
This refers to the inspection conducted under the Resident Inspection Progran
by Messrs. D. L. DuBois and D. R. Carpenter of this office during the period of
April 1-20,1984, of activities authorized by NRC Operating License DPR-46, for
Cooper Nuclear Station, and to the discussion of our findings with
Mr, P. Thomason, and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included operational safety verifications,
monthly surveillance and maintenance observations, licensee event fo11ovup,
plant trips - safety system challenges, declaration of unusual event, imiependent
inspection effort, and followup of previously identified items. Within these
amas, the inspection consisted of selective examination of procedures and
representative acords, interviews with personnel, and observatims W the
inspectors. The inspection findings are documented in the enclosed .nspection
report.
Within the scope of the inspection, no violations or deviations wem identified.
Two unresolved items are identified in paragraph 8 of the enclosed inspection
report.
In accordance with 10 CFR 2.790 (a), a copy of this letter and the enclosures
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter, and submit written
application to withhold information contained therein within 30 days of the
date of this letter. Such application must be consistent with the
requirementsof2.790(b)(1).
\\
f
\\@b
8406180212 840524
PDR ADOCK 05000298
';g
\\
G
, jfj _
,
.s.ai.b.<(fb....
....en..y.(K ....eu..KV
. . . . >
..
.
... ... ...
...... .. ..
. .. . ... ... . ..
.... ..
......
gw.
. sic.p.mn.on.. . 4%omon . ..
- - >
.
.. .. . .. ....
. . . .
..
. . ..
-
.-
? ........ .. . ft/2WW
->'.... .... . ....
...
.
. ......
.... ...
-
.-
-
l NRC FORM 318 etO 801 NRCM O240
_ _ _ _
@NO@0% M@@@@ @@W
_
-
.
.
Hebraska Public Power District
-2-
,
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
A. E W
E. H. Johnson, Chief
Reactor Project Branch 1
Enc.lcsure:
Appendix - NRC Inspection Report 50-298/84-10
cc w/ enclosure:
Paul Thomason, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P.O. Box 98
Brownville, Nebraska 68321
bec to dmb (IE01)
bcc distrib. by RIV:
RPB1
Resident Inspector
RPB2
Section Chief (RPS-A)
TP8
R. Denise, DRRP&EP
J. Collins, RA