|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20135F6941996-11-27027 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 ML20128L7761996-10-10010 October 1996 Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant ML20058C2811990-10-26026 October 1990 Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 ML20151T9551988-08-0808 August 1988 Notification of 880915 Meeting W/Util in Rockville,Md to Review 880630 Submittal to Resolve Open Issues Re Ground Motion Attenuation ML20155E8511988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by ML20196J9081988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by .Meeting Room Changed ML20150C4201988-03-10010 March 1988 Forwards BNL Re Ssi/Deconvolution Issue.Ltr Received for Distribution to Applicant,Util & Lpdrs ML20149K1061988-02-18018 February 1988 Notification of 880301-02 Meetings W/Util in New York,Ny to Discuss Soil Structure Interaction/Deconvolution Issue ML20236W0451987-12-0101 December 1987 Notification of 871215 Meeting W/Util in Bethesda,Md to Discuss soil-structure Interaction/Deconvolution Analysis Used in Facility Seismic Evaluation ML20236N1221987-11-0909 November 1987 Forwards Structural & Geosciences Branch Observation & Findings Re Concrete Module on (C3-02) - Const Assurance Program.Observation & Findings Should Be Identified to Region V Lead Reviewer ML20236A7421987-10-14014 October 1987 Forwards Draft Status of Plant Seismic Review to Be Filed ML20214P5991987-05-21021 May 1987 Notification of Significant Meeting on 870529 W/Util in Walnut Creek,Ca to Discuss Licensee Overview Presentation of Completed Activities of Readiness Review Const Assurance Module C3-02 Re Concrete ML20215F9171986-12-11011 December 1986 Notification of Significant Meeting on 870107 W/Util at Region V Ofc to Review Commitments & Schedules for Readiness Review Program ML20207E5431986-07-18018 July 1986 Notification of 860801 Meeting W/Util in Walnut Creek,Ca to Discuss Const Assurance Program Earthwork Module ML20211G7741986-06-16016 June 1986 Advises That G Dick Assigned as Licensing Project Manager for Facility.Dick Will Be point-of-contact for All NRR Activities,Including Readiness Review ML20141D3631986-03-25025 March 1986 Suggests That Response to Util Re Delay Should Be Sent by NRR Rather than EDO ML20153F1681986-02-21021 February 1986 Requests Approval/Disapproval of Encl DOE Proposal, Readiness Review,Const Assurance Program Insp of Washington Nuclear Plant,Unit 3 ML20210B9881986-02-0505 February 1986 Forwards Util 850731 Request for Review of Itt Grinnell Stiff Clamps.Util Prepared to Make Presentation of Rept & Respond to Questions.Complete Review Requested by 860430 ML20137R8821986-02-0404 February 1986 Notification of 860213 Meeting W/Util in Bethesda,Md to Discuss Recent Developments Re Engineering Assurance Program of Readiness Review Program ML20210A9471986-01-15015 January 1986 Responds to 851219 Request for Info Re S&W Engineering Assurance Program.Principal Differences Between Engineering Assurance Program & Idvp Is Review Timing & Who Performs Review ML20210A6731985-12-0606 December 1985 Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.W/o Supporting Documentation from Program Ofcs ML20209H0891985-10-0707 October 1985 Concurs w/marked-up Environ & Hydrologic Enginering Branch Review of Section 2.4 of Draft SER Re PMF on Streams & Rivers & Potential Dam Failures ML20132F2071985-09-27027 September 1985 Notification of Significant Licensee Meeting on 851029 W/Util in Elma,Wa to Examine Readiness Review Const Appraisal Program ML20209H0691985-09-19019 September 1985 Forwards marked-up Section 2.4 of Draft SER for Use in Responding to T Novak Undtd Memo.Figures 2.4.1 & 2.4.2 Missing from Draft ML20209H0811985-09-19019 September 1985 Recommends Concurrence W/Draft SER.Marked-up Page 6-19 of Draft SER Re Combustible Gas Control Sys Encl ML20198A1571985-09-19019 September 1985 Comments on WPPSS Project 3 Draft Ser,Including Sections 13.2,14 & 18 Re Training,Initial Test Program & Human Factors Engineering,Respectively.Comments on Sections 13.1, 13.4 & 13.5 Not Provided ML20210A7421985-09-11011 September 1985 Advises That Input in Draft SER Contains Outstanding Issues, Including Responses to Concerns Received in June 1984.Issues Must Be Received & Resolved at Such Time as Licensing Process Reinstated for Unit ML20210A7451985-09-0404 September 1985 Forwards Draft SER for Comments & Concurrence by 850920. Identification of Change in Staff Positions from Feb 1984 - Aug 1985 Requested So That Applicant May Be Advised of Items Requiring Reconsideration.W/O Encl ML20209G1251985-08-29029 August 1985 Forwards Draft SER for Comments & Concurrence by 850920. Draft Originally to Be Issued in Feb 1984.Draft to Provide Baseline Record of Review in Case Const Reinstated. W/O Encl ML20209G1101985-08-23023 August 1985 Forwards Draft SER Input,Based on FSAR Submitted to Date. Unresolved Issues Requiring Addl Info Listed ML20197K2061985-08-21021 August 1985 Recommends That a Bournia & T Cox Be Made Available If Members of NRR Required to Provide Depositions in WPPSS Securities Litigation.Listing of NRR Personnel Involved in Review of CPs of Facilities Forthcoming ML20209E5861985-06-28028 June 1985 Forwards Comments on Design Review Program to Be Implemented by Util as Second Module of Readiness Review Program,Per 850607 Memo.Specific Input from NRR (Secondary Reviewer) Not Required ML20127G1161985-06-21021 June 1985 Responds to Jg Partlow 850508 Memo Requesting Comments on Eight Draft Emergency Preparedness Preoperational Procedures.Program Should Be Similar to Other IE Insp Programs.Inclusion of Procedure 82102 Not Supported ML20209E5021985-06-12012 June 1985 Forwards Meeting Notice on Readiness Review Program Scheduled by Region V for 850701-02.T Ankrum Comments on Meeting Submitted.Implementation of Design Review Ie/Region V Responsibility.W/O Encl ML20197J5561985-05-0202 May 1985 Forwards Fes for Final Concurrence to Permit Issuance. Responses Received Re 841123 Memo Resolved.W/O Encl ML20209E3071985-04-16016 April 1985 Describes Site Environ Status,As Determined by 850411 Telcons W/F Hahn,A Moore & a Christian.Stabilization & Revegetation Efforts Along Stein Creek & Elizabeth Creek Satisfactory.Site Visit Not Necessary for Environ Review ML20209E3681985-04-12012 April 1985 Informs That Development of Draft SER Not Worthwhile,Per 850129 Request That Draft SER Be Provided by 850301,since Most Responses to Questions Not Received.No Approved Schedule Exists for Facility ML20209E0271985-03-0404 March 1985 Advises That Branch Has No Further Input to 831013 Draft SER & Section 3.11,per 850129 Request.Addl Input for Section 3.10 Will Be Provided at Later Time ML20209E0761985-03-0101 March 1985 Forwards Draft SER Re FSAR Chapter 14 Concerning Initial Plant Test Program.Test Program Acceptable & Meets Requirements of 10CFR50 ML20209D9871985-02-26026 February 1985 Forwards Draft SER Input on FSAR Section 4.2, Fuel Sys Design. License Condition 4.2.3.1(g) Re Maintaining Shoulder Gap Clearance During First Two Refueling Outages Should Be Relaxed ML20209E0061985-02-25025 February 1985 Confirms 850208 Notes That No Revs or Additions to 831213 Draft SER Input Provided,Per 850129 Request ML20209D9541985-02-19019 February 1985 Forwards Proposed License Condition & Safeguards SER Input, Based on Review of Facility Security Plan.Protected SER App Containing Safeguards Info Available from E Mcpeek. SALP Input Also Encl ML20209D9711985-02-19019 February 1985 Advises That Meteorology Sections in Draft SER Require No Changes & Should Be Used,Per G Knighton 850129 Request ML20209D9771985-02-15015 February 1985 Advises of Dr Muller 840511 Memo to Tm Novak That Provided Final SER Input Identifying One Open Item Re Control Room Habitability from Section 6.4.Item Remains Open Due to Lack of Info from Util ML20209D9371985-02-0808 February 1985 Forwards 831031 Draft SER Re Radiation Exposure in Response to 850129 Memo.Fsar Review Status Continuing Since Response to Eight Open Items Not Yet Received.W/O Encl ML20209D8971985-02-0606 February 1985 Discusses Review of Section 4.0, Identification of Vital Areas & App of Safeguards SER for Facility.No Concerns Re 10CFR73.55 Found ML20209D8481985-01-29029 January 1985 Informs That Draft SER Issuance Rescheduled for Mar 1985. Draft SER Input Indicating Appropriate Findings Re Topic Review or Inadequate Applicant Response Requested by 850301 ML20209D7321985-01-0303 January 1985 Forwards Summary of Review Costs Incurred by Various Program Ofcs Directly Involved in Processing of Ol.W/O Encl ML20209D6671984-12-0505 December 1984 Informs That Listed Items Should Be Corrected in Draft Fes. Corrections Needed Include Encl Table 4.7 Changes Re Population Distribution within 0-10 Miles in 1980 & Changes to Sections 4.2.2 & 5.9.4.4(2) Per Encl 840927 Memo ML20209D6331984-11-30030 November 1984 Forwards Comments on Portions of Fes,Per T Novak 841123 Request 1996-11-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20135F6941996-11-27027 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 ML20128L7761996-10-10010 October 1996 Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant ML20058C2811990-10-26026 October 1990 Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 ML20151T9551988-08-0808 August 1988 Notification of 880915 Meeting W/Util in Rockville,Md to Review 880630 Submittal to Resolve Open Issues Re Ground Motion Attenuation ML20155E8511988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by ML20196J9081988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by .Meeting Room Changed ML20150C4201988-03-10010 March 1988 Forwards BNL Re Ssi/Deconvolution Issue.Ltr Received for Distribution to Applicant,Util & Lpdrs ML20149K1061988-02-18018 February 1988 Notification of 880301-02 Meetings W/Util in New York,Ny to Discuss Soil Structure Interaction/Deconvolution Issue ML20236W0451987-12-0101 December 1987 Notification of 871215 Meeting W/Util in Bethesda,Md to Discuss soil-structure Interaction/Deconvolution Analysis Used in Facility Seismic Evaluation ML20236N1221987-11-0909 November 1987 Forwards Structural & Geosciences Branch Observation & Findings Re Concrete Module on (C3-02) - Const Assurance Program.Observation & Findings Should Be Identified to Region V Lead Reviewer ML20236A7421987-10-14014 October 1987 Forwards Draft Status of Plant Seismic Review to Be Filed ML20214P5991987-05-21021 May 1987 Notification of Significant Meeting on 870529 W/Util in Walnut Creek,Ca to Discuss Licensee Overview Presentation of Completed Activities of Readiness Review Const Assurance Module C3-02 Re Concrete ML20215F9171986-12-11011 December 1986 Notification of Significant Meeting on 870107 W/Util at Region V Ofc to Review Commitments & Schedules for Readiness Review Program ML20207E5431986-07-18018 July 1986 Notification of 860801 Meeting W/Util in Walnut Creek,Ca to Discuss Const Assurance Program Earthwork Module ML20211G7741986-06-16016 June 1986 Advises That G Dick Assigned as Licensing Project Manager for Facility.Dick Will Be point-of-contact for All NRR Activities,Including Readiness Review ML20141D3631986-03-25025 March 1986 Suggests That Response to Util Re Delay Should Be Sent by NRR Rather than EDO ML20153F1681986-02-21021 February 1986 Requests Approval/Disapproval of Encl DOE Proposal, Readiness Review,Const Assurance Program Insp of Washington Nuclear Plant,Unit 3 ML20210B9881986-02-0505 February 1986 Forwards Util 850731 Request for Review of Itt Grinnell Stiff Clamps.Util Prepared to Make Presentation of Rept & Respond to Questions.Complete Review Requested by 860430 ML20137R8821986-02-0404 February 1986 Notification of 860213 Meeting W/Util in Bethesda,Md to Discuss Recent Developments Re Engineering Assurance Program of Readiness Review Program ML20210A9471986-01-15015 January 1986 Responds to 851219 Request for Info Re S&W Engineering Assurance Program.Principal Differences Between Engineering Assurance Program & Idvp Is Review Timing & Who Performs Review ML20210A6731985-12-0606 December 1985 Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.W/o Supporting Documentation from Program Ofcs ML20209H0891985-10-0707 October 1985 Concurs w/marked-up Environ & Hydrologic Enginering Branch Review of Section 2.4 of Draft SER Re PMF on Streams & Rivers & Potential Dam Failures ML20132F2071985-09-27027 September 1985 Notification of Significant Licensee Meeting on 851029 W/Util in Elma,Wa to Examine Readiness Review Const Appraisal Program ML20209H0691985-09-19019 September 1985 Forwards marked-up Section 2.4 of Draft SER for Use in Responding to T Novak Undtd Memo.Figures 2.4.1 & 2.4.2 Missing from Draft ML20209H0811985-09-19019 September 1985 Recommends Concurrence W/Draft SER.Marked-up Page 6-19 of Draft SER Re Combustible Gas Control Sys Encl ML20198A1571985-09-19019 September 1985 Comments on WPPSS Project 3 Draft Ser,Including Sections 13.2,14 & 18 Re Training,Initial Test Program & Human Factors Engineering,Respectively.Comments on Sections 13.1, 13.4 & 13.5 Not Provided ML20210A7421985-09-11011 September 1985 Advises That Input in Draft SER Contains Outstanding Issues, Including Responses to Concerns Received in June 1984.Issues Must Be Received & Resolved at Such Time as Licensing Process Reinstated for Unit ML20210A7451985-09-0404 September 1985 Forwards Draft SER for Comments & Concurrence by 850920. Identification of Change in Staff Positions from Feb 1984 - Aug 1985 Requested So That Applicant May Be Advised of Items Requiring Reconsideration.W/O Encl ML20209G1251985-08-29029 August 1985 Forwards Draft SER for Comments & Concurrence by 850920. Draft Originally to Be Issued in Feb 1984.Draft to Provide Baseline Record of Review in Case Const Reinstated. W/O Encl ML20209G1101985-08-23023 August 1985 Forwards Draft SER Input,Based on FSAR Submitted to Date. Unresolved Issues Requiring Addl Info Listed ML20197K2061985-08-21021 August 1985 Recommends That a Bournia & T Cox Be Made Available If Members of NRR Required to Provide Depositions in WPPSS Securities Litigation.Listing of NRR Personnel Involved in Review of CPs of Facilities Forthcoming ML20209E5861985-06-28028 June 1985 Forwards Comments on Design Review Program to Be Implemented by Util as Second Module of Readiness Review Program,Per 850607 Memo.Specific Input from NRR (Secondary Reviewer) Not Required ML20127G1161985-06-21021 June 1985 Responds to Jg Partlow 850508 Memo Requesting Comments on Eight Draft Emergency Preparedness Preoperational Procedures.Program Should Be Similar to Other IE Insp Programs.Inclusion of Procedure 82102 Not Supported ML20209E5021985-06-12012 June 1985 Forwards Meeting Notice on Readiness Review Program Scheduled by Region V for 850701-02.T Ankrum Comments on Meeting Submitted.Implementation of Design Review Ie/Region V Responsibility.W/O Encl ML20197J5561985-05-0202 May 1985 Forwards Fes for Final Concurrence to Permit Issuance. Responses Received Re 841123 Memo Resolved.W/O Encl ML20209E3071985-04-16016 April 1985 Describes Site Environ Status,As Determined by 850411 Telcons W/F Hahn,A Moore & a Christian.Stabilization & Revegetation Efforts Along Stein Creek & Elizabeth Creek Satisfactory.Site Visit Not Necessary for Environ Review ML20209E3681985-04-12012 April 1985 Informs That Development of Draft SER Not Worthwhile,Per 850129 Request That Draft SER Be Provided by 850301,since Most Responses to Questions Not Received.No Approved Schedule Exists for Facility ML20209E0271985-03-0404 March 1985 Advises That Branch Has No Further Input to 831013 Draft SER & Section 3.11,per 850129 Request.Addl Input for Section 3.10 Will Be Provided at Later Time ML20209E0761985-03-0101 March 1985 Forwards Draft SER Re FSAR Chapter 14 Concerning Initial Plant Test Program.Test Program Acceptable & Meets Requirements of 10CFR50 ML20209D9871985-02-26026 February 1985 Forwards Draft SER Input on FSAR Section 4.2, Fuel Sys Design. License Condition 4.2.3.1(g) Re Maintaining Shoulder Gap Clearance During First Two Refueling Outages Should Be Relaxed ML20209E0061985-02-25025 February 1985 Confirms 850208 Notes That No Revs or Additions to 831213 Draft SER Input Provided,Per 850129 Request ML20209D9541985-02-19019 February 1985 Forwards Proposed License Condition & Safeguards SER Input, Based on Review of Facility Security Plan.Protected SER App Containing Safeguards Info Available from E Mcpeek. SALP Input Also Encl ML20209D9711985-02-19019 February 1985 Advises That Meteorology Sections in Draft SER Require No Changes & Should Be Used,Per G Knighton 850129 Request ML20209D9771985-02-15015 February 1985 Advises of Dr Muller 840511 Memo to Tm Novak That Provided Final SER Input Identifying One Open Item Re Control Room Habitability from Section 6.4.Item Remains Open Due to Lack of Info from Util ML20209D9371985-02-0808 February 1985 Forwards 831031 Draft SER Re Radiation Exposure in Response to 850129 Memo.Fsar Review Status Continuing Since Response to Eight Open Items Not Yet Received.W/O Encl ML20209D8971985-02-0606 February 1985 Discusses Review of Section 4.0, Identification of Vital Areas & App of Safeguards SER for Facility.No Concerns Re 10CFR73.55 Found ML20209D8481985-01-29029 January 1985 Informs That Draft SER Issuance Rescheduled for Mar 1985. Draft SER Input Indicating Appropriate Findings Re Topic Review or Inadequate Applicant Response Requested by 850301 ML20209D7321985-01-0303 January 1985 Forwards Summary of Review Costs Incurred by Various Program Ofcs Directly Involved in Processing of Ol.W/O Encl ML20209D6671984-12-0505 December 1984 Informs That Listed Items Should Be Corrected in Draft Fes. Corrections Needed Include Encl Table 4.7 Changes Re Population Distribution within 0-10 Miles in 1980 & Changes to Sections 4.2.2 & 5.9.4.4(2) Per Encl 840927 Memo ML20209D6331984-11-30030 November 1984 Forwards Comments on Portions of Fes,Per T Novak 841123 Request 1996-11-27
[Table view] |
Text
-
N
..m
[' s f- DISTRIBUTION:
sDOCKET FILES RAB R/F JUL 0 9 E FJCongel/ Plant File Docket No.: 50-508 RWHouston R/F MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Licensing, DL FROM: R. Wayne Houston, Assistant Director for Radiation Protection, DSI
SUBJECT:
ACCEPTANCE REVIEW FOR THE WASHINGTON NUCLEAR PROJECT NO. 3 (WNP-3) ENVIR0 MENTAL REPORT (ER)
PLANT NAME: Washington Nuclear Project No. 3 (WNP-3)
LICENSING STAGE: OL DOCKET NUMBER: '50-508 RESPONSIBLE BRANCH: LBf 3; L. Wheeler, LPM REQUESTED COMPLETION DATE: July 7,1982 DESCRIPTION OF RESPONSE: ' Acceptance Review of ER REVIEW STATUS: RAB - Complete As requested in a maorandum dated June 2,1982, the Radiological Impact Section (RIS) Radiological Assessment Branch (RAB) has reviewed the Environnental Report (ER-OL) of the Washington Nuclear Project No. 3 (HNP-3) for adequacy in the area .
of radiological impacts. 'RIS/RAB has found that the ER-OL contains most of the required information to estimate doses to people. The ER-OL is acceptable as presented. The comments and r.Noests for additional information are contained in Enclosure 1.
This review was performed jointly by R. Struckeyer and T. Mo, RIS, RAB.
ggeei signeOY
, R. h7D8 E*8 R. Wayne Houston, Assistant Director for Radiation Protection Division of Systems Integration
Enclosure:
As Stated' cc: w/ enclosure R. Mattson F. Miraglia L. Wheeler W. Paseiak .. .. .
T. Mo R. Struckmeyer (go7210437 AD03 03000508 820709 OjN. .
q rud' iV
/ e .
D' DSI:RAB i emen) ..D.SI:RAB
..................... ....................... .. D..SI
. . . . . . . . . :RA.
....... 8DSI..:.RAB............(.
l
.. .. s. . . j . . . . . . . . . . . . . .
.ue m > ..TM.9.i.km..T:.e.M.S t.r.u.c..km.ex.er. ....WJf a s c.i a.k.. g. Cage.1
.. , .. g.4.... 9.9.. . . . . . . .. . .
7 #
7/7 7 7 CATE) ........./8. . .2
. . . . . . . . ..- ../. ... .... /.8 2
. . . . ../. . }a'. 7/.7D..../.8
...../. 8 2 2 . . /... .../. 8 2 NRC FORM 318 (10 80) NRCM 024o OFFICIAL RECORD COPY. usoeo: e-m-neo
~ s,
. ' n m a \
'JNr-i, ER-OL ACCEPTANCE REY!T.: OUE5L ONS ER-0 470.1 (Secticr.s 2.i and 5.2):
s Reconfirm distan:c and direction for special 10:::i:n; (;ita boundary, milk cow, h etc.) [See Table 2.1-8] Explain how :hese ts:: cr: cataircd and/or cite source of data used in ecmputer run of reference 5.2 .
J ER-G 470.2 (Sections 2.1 and 5.2):
Reconfirm that there is no drinking water withcra'.;al der;nstream, and that there will be none. .has recharge of wells via river water been considered? For those wells which n:y be recharged in this m.'nner crd ' "i:P are a source of drinking water (among those in Tables 2.1-12 and 2.1-13) provide transit times and dilution
~ factors, and the basis or method of calculating these values.* [ Table 5.2-6 and Appendix B are incomplete because they do not provide these values for the various locatiohs].
ER-Q 470.3 (Sections 2.1 and 5.2):
Why was only the population of Montesano used for population doses via recreation pathways (shoreline usage, swirmr.ing, boating)? Where do these activities take place (locations of state parks, etc.), and what are the dilution factors transit times for each? (Table 2.1-6 lists the locations and distances, but not dilution factors and transition times).
ER-Q 470.4 (Section 3.5.3.2, p. 3.5-11):
Section 3.5.3.2, p. 3.5-11 states that WPPSS has chosen the cost benefit option for ALARA compliance. Provide the following distributional data for each of the 22 1/2-degree radial sectors centered on the 16 cardinal compass directions for radial distance of 1, 2, 3, 4, 5,10, 20, 30, and 50 miles from the reactor (from the ER):
- 1. Present annual meat production (kg/yr),
a q
- 2. Present annual milk production (liter /yr), .
- 3. Present annual vegetable production (kg/yr).
ER-0 470.5 (Section 2.1):
Ccnfirm that fish harvest data includes all fish taken within 80 km downstream of the plant radwaste discharge. (See Table 2.1-10) .
ER-0 470.6 (Section 5.2):
What is the basis for the irrigation data of Table 5.2-6 and Appendix B?
ER-0 470.7 (Section 5.2, Table 5.2-6):
How was dilution factor calculated /obtained? (It is not necessarily the same for aquatic food / shoreline / drinking water nor are dilutions for any individual necessarily the same as for population. Justi fyl)
ER-0 470.8 (Section 5.2.4 and Appendix B):
The ER-OL assumed that all fish consumed was to be from 1 location i.e., Chehalis River? Why? Table 2.1-10 of Section 2.1.3 indicates higher fish catches at
~
Grays Harbor & Ocean (off Grays Harbor) than at Chehalis River.
O T
O 4
. . - . .