ML20197F728
| ML20197F728 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 02/18/1982 |
| From: | Houston R Office of Nuclear Reactor Regulation |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-1233 NUDOCS 8203040381 | |
| Download: ML20197F728 (1) | |
Text
r'y
. l
.m DISTRIBUTI0ti:
[DocketFile c tidu ne ETSB D ile
' D, RP R g File NED 9
Docket flo. S0-460 FEB 1. 81982 p.
B 22 iggg,
{ um?4'ac I'EMORAflDU!1 FOR:
R. L. Tedesco, Assistant Director 8
samas mment for Licensing. DL m
//
FR0fi:
R. Lt. Houston, Assistant Director 4
for Radiation Protection, DSI
~
SUBJECT:
ETSB ACCEPTAllCE REVIEW OF UtiP, UflIT f0. 1, EtiVIR0f;fIErlTAL REPORT The Effluent Treatment Systems Branch has reviewed the OL-Stage Environmental Report (ER-OL) for Washington fluclear Project, Unit lio.1. He find the ER sufficiently complete to enable us to initiate our. review process. He have no acceptance review questions and have identified no areas for which addi-tional information is required prior to docketing.
We recommend acceptance of the ER-OL for docketing.
R. Wayne Houston, Assistant Director for Radiation Protection Division of Systems Integration cc:
R. flattson D. Eisenhut R. Capra W. Gammill F. Congel E. Adensam R. Hernan R. Bangart P. Stoddart O
l 0/k DO
.#.sdiE;.dse.l.o.st:.bge.
.3.3g.:.sB..sg,... l.....
c mc.,
su;nme >
tu.i.WJi.=R ar.t..
..WP.G
.11....RW#6s on...!.
'ObO40$bfebO218
^
~
"'OSl* " *0S" "O l" I'02" ' ' "
ADOCK 05000460 OFFICIAL RECORD COPY uom ini-m-m
i ~._
c)
MAR 2 1982 Docket Nos. 50-460 and 50-513 d
(o s
MEMORANDUM FOR: Elinor G. Adensam, Chief
^ $^
(s s
Licensing Branch No. 4. DL E
\\
4% ?
FRW:
Ronald L. Ballard~, Chief f:., l'.3
~.o +.h
'Sa'g Environmental Engineering Branch, DE B'
n.x
SUBJECT:
ACCEPTANCE REVIEW OF WNP-1 N
%,I f '
As requested by your memorandum of February 10, we have reviewed our sections of the Environmental Report for the Operating License application for the WHP-1/4 Pro, ject. We find the ER acceptable for initiating the review.
In the enclosure we have identified additional infomation which will be necessary for us to complete our review. Reviewers are G. LaRoche, M. Masnik, and R. Samworth.
Origine! sijr.cd 6 C.nid L 22hrd Ronald L. Ballard, Chief Environmental Engineering Branch Division of Engineering
Enclosure:
As stated l
cc:
R. Hernan G. LaRoche M. Masnik R. Samworth DISTRIBUTION:
L.Mckets j
EEB Rdg EEB File l
RLBallard M;-~ADOCK05000--- 6.:vauw d'A c
l a;
ik?
i a,'
omer>.DE: EI:'EEB.....DE:ET:EEB...... D E.:.ET.;EEB..... 0E:EI;EEB...
>=>.88.Samatth:w.s..Gl.a.8pr,he..
.. M@ m ik,...
, N.B h.l.),a.cf..,
- >l.3/.2/82...........1/1/82N
.. 3/... /.8 2......... 3/.; /E2......
NRCFORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY
~
~
WPPSS-1 Acceptance Review Additional Information Requirements 290.1 Provide in Chapter 5 information on the amount of drift and the predicted direction and distance of the maximum amount of drift.
290.2 ER page 6.1-18, first line.
" Table 6.1-2" should be Table 6.1-1.
290.3 ER page 6.1-20, first paragraph. A map should be provided indicating where soil sample collection sites are located.
290.4 Chapter 6.2.
Provide an Operational Monitoring Program for terrestrial ecology, i.e. effects of cooling tower drift or the basis for not needing one.
291.1 Provide quantitative estimates of Corbicula sp. densities in the vicinity of the intake structure.
l 291.2 The site drawing in Figure 3.1-2 is illegible; provide a new figure.
291.3 Compare the anticipated station water use provided during the CP review to the present values.
l 291.4 Provide additional information on the presence of bass and sturgeon in the vicinity of the intake and discharge structures.
i
1
-2 291.5 Make references 23 and 25 from Section 2 available for review during
~
the site visit.
291.6 In addition to other requested infonnation provide a summary and brief discussion in table form, by section, of differences between currently projected environmental effects (including those that would degrade, and those that would enhance environmental conditions) and the effects discussed in the environmental report submitted at the construction pennit stage.
291.7 The NPDES discharge permit General Condition G1 prohibits the discharge of materials added for corrosion inhibition of recirculating cooling water.
Is the proposed use of sulfuric acid in the cooling system in compliance with the current NPDES Permit or will an amendment be required? Under what conditions could the cooling system be operated without acid addition?