Confirms Verbal Temporary Waiver of Compliance from Tech Specs 4.10.1.D & 3.3.D to Permit four-loop Operation at Plant.Waiver in Effect Until 860514 While Processing of Emergency License Amend Completed
ML20197F385
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/08/1986
From: Charemagne Grimes
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8605150550
Download: ML20197F385 (3)


Text

,

h May 8, 1986 Docket No. 50-213 DISTRIBUTION VDocket File PAnderson NRC PDR ACRS (10)

Local POR NSIC Mr. John F. Opeka, Senior Vice President ISAP Reading 0 ELD Nuclear Engineering and Operations FMiraglia Starostecki Connecticut Yankee Atomic Power Company EJordan DCrutchfield Post Office Box 270 BGrimes Hartford, Connecticut 06141-0270 JPartlow 1

FAkstulewicz

Dear Mr. Opeka:

SUBJECT:

EMERGENCY WAIVER OF COMPLIANCE FROM TECHNICAL SPECIFICATIONS i

4.10.1.D.2 AND 3.3.0 Re:

Haddam Neck Plant i

l By letter dated May 7, 1986, as clarified by conference call on May 8, 1986, you requested a temporary waiver of compliance from technical specifications 1

4.10.1.D and 3.3.D of Facility Operating License DP9-61 to permit four-loop 4

operation even though one tube in SG #2 was not plugged, as required by the the cited technical specifications, during the recent 1986 outage.

We have reviewed the justification in your letter, as well as that provided during our conference call and conclude that operation of SG #2 will not place the plant in an unsafe condition nor will it present any undue risk to the health and safety of the public.

This letter will confirm the verbal granting of a temporary waiver of compliance from the subject technical specifications to permit four-loop operation at the Haddam Neck Plant. This waiver of compliance will be in effect until May 14, 1986, while we complete the processing of an emergency license amendment.

1 Sincerely, Original signed by Christopher Grimes

]

Christopher I. Grimes, Director i

Integrated Safety Assessment-Project Directorate Division of PWR Licensing - B cc: See next page

  • SEE PREVIOUS CONCURRENCE ISAP:DPL-B EB:DPL-B Region I ISAP:0PL-A-
  • FAkstulewicz:mn
  • Prue
  • Memo CGrimes DC tShfield 05/8/86 05/8/85 05/7/86 05/g/86 05/g/86

{

  • by memo, Starostecki to Crutchfield i

h P

i P

~

i Docket No. 50-213 DISTRIBUTION Docket File PAnderson NRC PDR ACRS (10) local PDR NSIC

^

Mr. John F. Opeka, Senior Vice President ISAP Reading OELD Nuclear Engineering and Operations FMiraglia Connecticut Yankee Atomic Power Company Edordan Post Office Box 270 BGrimes Hartford, Connecticut 06141-0270 JPartlow FAkstulewicz

Dear Mr. Opeka:

SUBJECT:

. EMERGENCY WAIVER OF COMPLIANCE FROM TECHNICAL SPECIFICATIONS 4.10.1.D.2 AND 3.3.D Re:

Haddam Neck Plant i

By letter dated May 7, 1986, as clarified by conference call on May 8, 1986, i

you requested a temporary waiver of compliance from technical specifications 4.10.1.0 and 3.3.D of Facility Operating License DPR-61 to permit four-loop operation even though one tube in SG #2 was not plugged, as required by the l

the cited technical specifications, during the recent 1986 outage.

)

We have reviewed the justification in your letter, as well as that provided during our conference call and conclude that operation of SG #2 will not l

lP ace the plant in an unsafe condition nor will it present any undue risk to i

the health and safety of the public.

This letter will confirm the verbal granting of a temporary waiver of compliance from the subject technical specifications to permit four-loop operation at the Haddam Neck Plant. This waiver of compliance will be in effect until May 14, 1986, while we complete the processing of an emergency license amendment.

Sincerely, i

Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B cc: See next page ISAP:DPL-B!fd EB 01 L-B Regicn I ISAP:DPL-B JJ/[wI FAkstulewic)z:mn W Sh CGrimes i

05/8/86 05M,/85 05/

6.

05/ /86 AO: Wt.- B w a.A Qb $6 CSI l%

bW to dr0fM*M

s.

e.

Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Guard of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 i}