Revised Monthly Operating Repts for Apr 1988,correcting Number of Hours in Reporting Period
ML20197F344
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/30/1988
From: Middleton L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20197F342 List:
References
NUDOCS 8806100305
Download: ML20197F344 (13)


Text

..

'[

NRC Monthly Operations Sumary Peach Bottom Atomic Power Station May, 1988 UNIT 2 Unit'2 remained in the cold shutdown condition throughout the report period, with restart and maintenance activities in progress. Major activities in progress throughout the month consisted of Emergency Service Water piping replacement and M0 VATS modification of 121 motor operated valves.

UNIT 3 Unit 3 remained shut down with the core offloaded as the Reactor Recirculation and Residual Heat Removal (RHR) systems piping replacement continued. As of the end of the report period, all ten of the Reactor Recirculation inlet (N-2) safe ends were replaced and the Reactor Recirculation and RHR piping replacement was approximately 55% completed.

l

[

I l

l l '

8906100305 080525 PDR ADOCK 05000277 R

PDR I

1 l

Docket No. 50-277 Attachment to Monthly Operating Report for May, 1988 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Botton Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 7 completed.

Reload 8 indeterminate due to Shutdown Order.

3.

Scheduled date for restart following refueling:

Ir.ceterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

1) Administrative changes to reload amendment
2) Reactor Water Level instrument range change 5.

Scheduled date(s) for submitting proposed licensing action cad supporting information:

(1) submitted April 25, 1988 (2) submitted October 13, 1987 6.

Important licensing consideraticns associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 1734 Fuel Assemblies, 58 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any l

increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies, l

i I

Docket No. 50-277 Attachment to Monthly Operating Report for May, 1988 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September, 1998 (September 1995, with reserve full core discharge) l l

(

l l

l l

l Y

Docket No. 50-278 Attachment to Monthly Operating Report for May, 1988 UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 7 in progress (Major Pipe Replacement Outage) 3.

Scheduled date for restart following refueling Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel and revise reactor core operating limits. Revisions to reflect modification to the primary system piping and installation of the Alternate Rod Insertion system.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Reload 7 License Amendment to be submitted June 13, 1988.

Primary System Piping Amendment submitted March 21, 1988.

Alternate Rod Insertion Amendment submitted June 12, 1987.

6.

Important licensing considerations associatad with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuei storage pool:

(a) Core - 0 Fuel Assemblies (764 assemblies offloaded during outage)

(b) Fuel Pool - 2260 Fuel Assemblies, 6 Fuel Rods

Docket N2. 50-278 Attachment to Monthly Operating Report for May, 1988 Page 2 UNIT 3 REFUELING INFORMATION (Continued) i i

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

i The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on February 20, 1987. The completion date for this modification has been rescheduled for i

February, 1989 to accommodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

l March,1993 (reserve full core discharge cannot be accomanodated after the restart following the completion of the October, 1987 refueling outage until the completion of the new fuel racks)

Installation of the new fuel racks will extend the projected date 1

of the last refueling to September, 2000 (March, 1996, with reserve fullcoredischarge)

4

  • g:

AVERAGE DAILY LNIT PCHER LEVEL

-DOCKET No. 50 - 277 l

LA4IT PEACH 80TTON LNIT 2 3

DATE MAY.-13, 1988 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 8416374 l

MONTH APRIL 1988-

)

DAY AVERAGE DAILY PCHER LEVEL DAY AVERAGE DAILY P0HER LEVEL (PHE-NET)

( PHE-NET )

1 0

17 0

2 0

18 0

3-0 19 0

0 0

20 0

5 0

21 0

0 0

22 0

7 0

23 0

8 0

24 0

9-0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

10 0

30 0

15 0

lo 0

i l

l 1

4

  • .,e e

J r.

AVERAGE DA2LY WIT PCHER LEVEL L

~

DOCKET NO. 50 - 278 WIT PEACH BOTTOM LMIT 3 DATE

' MAY 13, 1988-CON ANY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION MJCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-6374 MONTH APRIL 1988 4

DAY AVERAGE DAILY PCHER LEVEL DAY AVERAGE DAILY P0HER LEVEL

( 794E-NET I

( 79tE-NET )

.1 0

17 0

2 0

18 0

-3 0

19 0

-0 0

20 0

5-0 21 0

6 0

22 0

7 0

23 0

8 0

24 0

l 9

0 25 0

l 10 0

26 ~

0 11 0

27 0

12 '

o 28

-0 13 0

29 0

l 10 0

30 0

1 l'

i 15 0

l i

l 16 0

l l

i

OPLRATING DATA REPORT DOCKET NO. 50 - 277 DATE MAY 13, 1968 i

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE ( 215) 841-6374 OPERATING STATUS

1. LNIT NAME: PEACH BOTTON UNIT 2 l NOTES: UNIT 2 REHAINED SHUTDOW l

l l.

2. REPORTING PERIOD APRIL, 1988 l

UNDER NRC ORDER HITH l

l l

3. LICENSED THERMAL P0HERIMKT):

3293 l

RESTART ACTIVITIES l'

l l-O. NAMEPLATE RATING (GROSS WE) 1152 l

CONTINUING.

l l

-l-

5. DESIGN ELECTRICAL RATING (NET HME):

1065 l

l l

l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS HNEla 1098 l

l l

l

/. MAXIMUN DEPENDABLE CAPACITY INET HHE):

1051 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUteER 3 THROUGH 7) SINCE LAST REPORT, GIVE REAS0tG
9. P0HER LEVEL TO HHICH RESTRICTED, IF ANY (NET WE):
10. REASONS FOR RESTRICTIONS, IF ANY THIS HONTH YR-TO-LATE CWULATIVE
11. HOURS IN REPORTING PERIOD 719 2,903 121,175 l
12. HUNBER OF HOURS REACTOR HAS CRITICAL 0

0 74,196.8

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 10'. HOURS GENERATOR ON-LINE 0.0 0.0 71,866.8
15. UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 t

i

16. GROSS THERMAL ENERGY GENERATED (HHH) 0 0

212,810.745 l

I

17. GROSS ELECTRICAL ENERGY GENERATED (MHH) 0 0

70,019,230 l

(

18. NET ELECTRICAL ENERGY GENERATED (HHH)

-3,582 16,709 67,024.407 l

l PAGE 1 0F 2

f_

T :' ' -,,--

. ;t:

-1

_0PERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 - 277 s

b 1

~DATE MAY 13,'1v88

- THIS MONTH YR-TO-DATE

-: CutfAATIVE

19. WIT SERVICE FACTOR 0.0 0.0 59.3

- 20. ' WIT AVAILABILITY FACTOR

-0.0 0.0 59.3 21.: WIT CAPACITY FACTOR IUSING MDC NET) l-0.0 0.0

- 52.6

- 22. LNIT CAPACITY FACTOR IUSING DER NET) 0.0 0.0 51.9

23. WIT FORCED OUTAGE RATE 0.0 0.0 14.6 4

' 24. SHUTDOPNS SCHEDULED OVER NEXT 6 MONTHS LTYPE, DATE, ANO DURATION OF EACH):

REFUELING OLITAGE.

25. IF SHUTDOW AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt
26. WITS IN TEST STATUS (PRIOR TO CotNERCIAL OPERATION):

FORECAST ACHIEVED' 1

INITIAL CRITICALITY 09/I6/73 INITIAL ELECTRICITY 02/18/74, CormERCIAL OPERATION 07/05/74 I

k i

D PAGE 2 0F 2 m - NEGATIVE VALUE REPORTED FOR CONSISTENCY NITH FEDERAL ENERGY REGULATORY COPNISSION REPORTS.

f n

4 3

T n

4

.iv----

,--.e,w-w

---y.v7.

---~w,3v,%w.---m--

9 y.-r

,-,,,33,

,.,-w,r,,

.-e,,,,4,w,m.t,py.w---,3,-

,c-

..,wr r.,-

DPERATING DATA REPORT.

t 1

DOCKET No. 50 - 278 DATE

.MAY 13, 1988' COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON TECHNICAL ASSISTANT LICENSING SECTIDH NUCLEAR SUPPORT DEPARTMENT TELEPHONE '( 215) 841-6374 1 OPERATING STATUS -

1.' UNIT NAME PEACH BOTTOM UNIT 3 l NOTES: UNIT 3 REMAINED SHUTDODN l

l l

2. REPORTING PERIODI APRIL, 1988 l

UNDER NRC ORDER HITH l

l l

3.- LICENSED THERMAL POHERit9(T):

3293 l

REFUEL AND PIPE REPLACEMENT l

l

.I Q. NAMEPLATE RATING (GROSS 194E):

1152

)

'IN PROGRESS.

l l

l S. DESIGN ELECTRICAL RATING INET MNElt 1065 l

l l

l

. 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 1098 l

l I

i

7. HAXIMUM DEPENDABLE CAPACITY INET MHE): ' 1035 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS I4ASER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSt
9. P0HER LEVEL TO NHICH RESTRICTED, IF ANY (HET 791E):
10. REASONS FOR RESTRICTIONS, IF ANY r.

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 719 2,903 117,071 l

E NUMBER OF HOURS REACTOR HAS CRITICAL 0

0 76,357.4

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0

. IO. HUURS GENERATOR ON-LINE 0.0 0.0 73,929.3

15. UNIT RESERVE SHUTD0694 HOURS 0.0 0.0 0.0

- 16. GROSS THERMAL ENERGY GENERATED IMHH) 0 0

215,278,901 117. GROSS ELECTRTCAL ENERGY GENERATED (MHH) 0 0

70,611.432

10. NET ELECTRICAL ENERGY GENERATED (MNH)

-3,582 a

-16,709 67,685,446 PAGE 1 0F 2

. _, ~,

e' OPERATING DATA REPORT (CONTINUED)

DOCKET No. 50 - 273 DATE MAY 13, 1988 THIS HONTH

'. YR-TO-DATC CLitJLATIVE

- 19.' WIT SERVICE FACTOR 0.0 0.0 63.1

20. WIT AVAILABILITV FACTOR 0.0 0.0 63.1
21. WIT CAPACITY FACTOR (USING MOC NET) 0.0 0.0 55.9
22. WIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 54.3 23.~ UNIT FORCED OUTAGE RATE 0.0 0.0 13.3 24.' SHUTD0ff4S SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHit INDETERMINATE UNTIL NRC ORDER IS SATISFIED.
25. IF SHUTD0694 AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP8
26. WITS IN TEST STATUS (PRIOR TO Cott1ERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 Cott1ERCIAL OPERATION 12/23/74 PAGE 2 0F 2

f

- LNIT SHUTDO>NS AND P0HER REDUCTIONS DOCKET No. ED - 277 UNIT HAME PEACH BOTTON LNIT 2 DATE HAY 13, 1988-t REPORT HONTH APRIL, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON i.-

TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTNENT TELEPHONE ( 215) 841-6374

(...........................................................................................................................

l-

'l i

l l HETHOD OF l LICENSEC lSYSTEHlCOMPONENTl CAUSE AND CORRECTIVE l

l TY PE l DURATION i RE ASON I SHUTTING DokN !

EVENT l CODE I CODE I ACTION TO 3.1 DATE l (1)l (HOURS)] (2) l REACTOR (3) l REPORT 8 l (4) l (5) l PREVENT RECURREhCE 1

I i

l i

i i

l I

7 I 880401 1 S l 719.0 1 C i 1

1 N/A l RC l FUEuo( l NRC REQUIRED SHUTDolN.

~l

.I i ----- 1 I

I I

l l

l l

l 719.D l'

I

-l l

l (1)

(2)

(3)

(4)

- FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS

- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1. HANUAL FOR PREPARATIDH OF DATA B - HAINTENANCE OR TEST 2 - HAPAJAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT ILER)

D - REGULATORY RESTRICTION

.4. OTHER (EXPLAIN)

FILE (NUREG-D161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - CPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE

9<,_.,

e i'

i f

i r

s UNIT SHUTDODNS AND P0HER REDUCTIONS DOCKET NO. 50 - 278 i

LNIT NAME PEACH 80TTOM UNIT 3 DATE MAY 13, 1988 REPORT MONTH APRIL, 1968 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICEtGING SECTION NUCLEAR SUPPORT DEPARTMENT i

TELEPHONE I215) 841-6374 p................................................................................................................___.........

l l

l l

l NETH00 0F l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE l

I TYPE l DURATION ! RE ASON I SHUTTING DODN l EVENT l CODE I CODE i ACTION TO

.1 DATE I (lli (HOURS)l 12) l RE ACTOR (3) l REPORT S l (4) l (5) l PREYENT RECURRENCE F

s....................__.__...................................................................................................

l' 1

I I

I i

i l

i

'7 1 680401 1 ~S l 719.0 l C l 1

i N/A l RC l FUELXX l PIPE REPLACEMENT GJTAGE.

1 I

'l I

I I

I I

L i

I I ----- 1 1

I I

I l-l l

1 719.0 l l

l l

1 l

l

?

f.

(1)

(2)

(3)

(4)

[-FORCED REASON HETHOD EXHIBIT Q = INSTRUCTIONS 6 - SCHEDULED A - EQUIPMENT FAILURE lEXPLAIN) 1 - KANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LERI D - REGULATORY RESTRICTION 4. OTHER (EXPLAIN)

FILE INUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION i

{

F - ADMINISTRATIVE (5)

G - DPERATIONAL ERROR (EXPLAIN)

H = OTHERIEXPLAIN)

EXHIBIT I - SAME SOURCE I