ML20197F337

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Apr 1988, Correcting Number of Hours in Reporting Period
ML20197F337
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/25/1988
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20197F342 List:
References
NUDOCS 8806100304
Download: ML20197F337 (1)


Text

...

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A PA.19sO1 1215)8414000 May 25, 1988 Docket Mos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Connaission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Botton Atomic Power Station Monthly Operating Report Gentlemen:

Attached are twelve revised copies of tae monthly operating report for Peach Bottom Units 2 and 3 for the month of April, 1988 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

This revision is being submitted to reflect the corrected number of hours in the reporting period for both Units 2 and 3.

Both corrections are indicated by a bar in the adjacent margin. We regret the inconvenience these changes may have caused.

Very truly yours, fs W. M. Alden Director Licensing Section Nuclear Support Division Attachment cc:

W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, USNRC Senior Resident Inspector i

S. P. Mangi, Dept. of Envir. Resources i

P. A. Ross, NRC (2 copies)

R. E. Martin, NRC Project Manager l,

Thomas Magette, Maryland Power Plant Siting l

INP0 Records Center jN I \\

8806100304 080525 PDR ADUCK 05000277 R

PDR t