g.
MAY 0 71986
In Reply Refer To:
Docket:
50-298/86-11
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
Staff-Nuclear Power Group
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Messrs. W. M. McNeill and M. E. Skow
of this office during the period March 17-21, 1986, of activities authorized by
NRC Operating License DPR-46 for Cooper Nuclear Station, and to the discussion
of our findings with Mr. G. R. Horn and other members of your staff at the
conclusion of the inspection.
>
The area examined during the inspection was procurement program, offsite review
committee, offsite support staff and actions you have taken with regard to
previously identified inspection findings.
Within this area, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector. These findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
].
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
!
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
One unresolved item is identified in paragraph 3 of the enclosed inspection
report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8605150218 860307
Original Signed By
DR
ADOCK 0500
8'
J. E. Gagliardo
J. E. Gagliardo, Chief
, Reactor Projects Branch
En :1
sures: (see next 's
e)
,
R :
8/A
r
R
R /A
d[
WMM dill
ME ow
JPJaudon
EGaglia (
r/(/86
h $/{ /86
i/\\/86
/ \\ /8
i
Ip
-
- . . _ .
--
._ ,
1se
Nebraska Public Power District
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/86-11
cc w/ enclosures:
Guy Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska 68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc to DMB (IE01)
bcc distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
, *Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015
- R&SPB
- RSB
- MIS System
- M.
Skow
- RIV File
- W. McNeill
- RSTS Operator
- w/766