Forwards Insp Rept 50-298/86-11 on 860317-21 & Notice of Violation
ML20197E299
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/07/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20197E304 List:
References
NUDOCS 8605150218
Download: ML20197E299 (2)


See also: IR 05000298/1986011

Text

g.

MAY 0 71986

In Reply Refer To:

Docket: 50-298/86-11

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by Messrs. W. M. McNeill and M. E. Skow

of this office during the period March 17-21, 1986, of activities authorized by

NRC Operating License DPR-46 for Cooper Nuclear Station, and to the discussion

of our findings with Mr. G. R. Horn and other members of your staff at the

>

conclusion of the inspection.

The area examined during the inspection was procurement program, offsite review

committee, offsite support staff and actions you have taken with regard to

previously identified inspection findings. Within this area, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector. These findings

are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

]. this violation, in writing, in accordance with the provisions of Section 2.201

! of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

One unresolved item is identified in paragraph 3 of the enclosed inspection

report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8605150218 860307 Original Signed By

DR ADOCK 0500 8'

J. E. Gagliardo

J. E. Gagliardo, Chief

, Reactor Projects Branch

En :1 sures: (see next 's e) ,

R :

WMM dill

8/A r R R /A d[

ME ow JPJaudon EGaglia (

r/(/86 h $/{ /86 i/\/86 / \ /8 i

Ip

- - . . _ . -- ._ ,

1se

Nebraska Public Power District -2-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-298/86-11

cc w/ enclosures:

Guy Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc to DMB (IE01)

bcc distrib. by RIV:

  • RPB DRSP
  • Resident Inspector R. D. Martin, RA

, *Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015

  • R&SPB *RSB
  • MIS System *M. Skow
  • RIV File *W. McNeill
  • RSTS Operator
  • w/766