Confirms Dates of 880718-22 for Reverification of post-fire Safe Shutdown Capability Insp,Per 880512 Telcon.Util Should Have Matls Listed in Encl Readily Available to Insp Team
ML20197E267
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/27/1988
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cruden D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8806080225
Download: ML20197E267 (3)


Text

.

1 e

i 4

Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7 Virginia Electric and Power Company ATTN: Mr. D. S. Cruden, Vice President.

Nuclear Operations P. O. Box 26666 Richmond, VA 20261 4

Gentleman:

SUBJECT:

TRIENNIAL POSTFIRE SAFE SHUTDOWN CAPABILITY REVERIFICATION INSPECTION I

This letter is to confirm the dates July 18-22, 1988, for the reverification of

'l the postfire safe shutdown capability (Module 64150) inspection of North Anna, which was established during the telephone conversation of May 12, 1988, r

between Bob Endfinger of your staff, and Milton Hunt of this office.

j The purpose of this inspection is to verify your continued compliance with 10 CFR 50, Appendix R, Sections III.G, III.

J.,

III.L. and III.0; reverify your postfire safe shutdown capability; and review your configuration management program with respect to fire protection.

This will be a team type inspection, composed of personnel from NRC Region II office.

In order for us to perform the inspection in an expeditious manner, we request j

that you have the materials listed on the enclosure to this letter readily available to the inspection team when they arrive on site on July 18, 1988.

J Your cooperation with us during this inspection will be appreciated.

Please contact us if you have any questions.

Sincerely, Original Signed-by Luis A. Reyes j

Luis A. Reyes, Director

]

Division of Reactor Projects

Enclosure:

Postfire Safe Shutdown Capability Reverification Inspection:

Requested Materials cc w/ enc 1:

G. E. Kane, Station Manager a

N. E. Hardwick. Manager - Nuclear Programs and Licensing bec w/ encl:

(See page 2) 8806080225 880527

  • . t PDR ADOCK 05000338 i

O DCD

_ _ _ _, _... _,. -. _,_.., _22_c l_

hAAdf 271988 Virginia Electric and Power Company 2

bec w/ enc 1:

NRC Resident Inspector DRS Technical Assistant Document Control Desk D. Kubicki, NRR A. Krasopoulos, RI J. Ulie, RIII J. Singh., RIV C. Ramsey, RV L. Engle, NRR Commonwealth of Virginia RII RI T Td RI y

RII RII 4

[dUf't

],'/

k go 8/fison GWiseman:td Uonlon AHerdt AGi n

05/p /88 05/fj'/88 05/p/88 05/ g'88 05/ J/88 2

. = -.

=

(

ENCLOSURE i

Postfire Safe Shutdown Capability Reverification Inspection: Requested Materials l

l 1.

Current revision of the North Anna Appendix R Report; 2.

Current revision of piping and instrumentation (flow). diagrams for hot standby and cold shutdown systems, alternate shutdown, and RCP oil collection system-3.

Plant layout drawings showing the location of fire barriers and hot standby and cold shutdown equipment;

~

4.

Electrical raceway drawings; 5.

Cable and raceway location drawings; 6.

Plant operating procedures for postfire safe shutdown and repair procedures for cold shutdown systems (if any);

7.

Plant procedures governing design changes and work requests which implement the configuration control program for fire protection; 8.

All approved exemption requests and the associated NRC generated SERs approving or denying these exemptions; 9.

All engineering evaluations prepared in accordance with Generic Letter 86-10 justifying NFPA code deviations, the lack of area wide suppression or detection, and nonrated fire barriers or fire barrier penetrations; i

10. The associated circuits analysis and breaker / fuse coordination study;
11. All 50.59 evaluations which justify design modifications should be available on site.

.