Forwards Insp Repts 50-348/86-05 & 50-364/86-05 on 860324-28.No Violation Noted
ML20197D649
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/29/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20197D653 List:
References
NUDOCS 8605150009
Download: ML20197D649 (2)


See also: IR 05000348/1986005

Text

,

-- _ _ _

-sf~ .

-

p g

~i

i APR 2 91986

Alabama Power Company

VATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641-

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/86-05 AND 50-364/86-05

On March 24-28, 1986, NRC inspected activities authorized by NRC Operation

License Nos. NPF-2 and NPF-8 for your Farley facility. The inspection included

the gathering of information involving various activities at your facility and a

review of your participation in the NRC's spike ' liquid sample Confirmatory

Measurements Program. At the conclusion of the inspection, the findings related

to the Confirmatory Measurements Program were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. The inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations of activities in. progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with 10-CFR 2.790(a), a copy of this letter and the enclosures will

be placed in NRC's Public Document Room unless you notify this office by

telephone within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of the letter. Such application must be consistent with the requirements of

2.790(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verre111, Chief ,

Reactor Projects Branch 2 l

'

Division of Reactor Projects

Enclosure: (See page 2)

51go0

D0 P

G

l

H! 1% a

r

4 -> , .

Alabama Power Company 2

Enclosure:

Inspection Report No. 50-348/86-05

and 50-364/86-05

, je w/ encl:

W. O. Whit c, Executive Vice President

uf. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

d . W. McGowan, Manager-Safety Audit

and Engineering Review

d.K.Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ encl: .

d RC Resident Inspector

vf. Reeves, Project Manager, NRR

VDocument Control Desk

ftateofAlabama

--

.

WIe e S btz P o ryc @

4/N/86 4//p/86 ~

6

4/r)/86 4//]/8

II I RII ,

'

kp

R

4/ /86

ch J rse

4/ /86

HDance

4/g/86

3 \ as .

O.Tdots4l l

coacaraSkN 1

f4'k- ._