ML20197D558

From kanterella
Jump to navigation Jump to search
Forwards SER Supporting Util Responses to Generic Ltr 83-28, Item 1.2, Post-Trip Review - Date & Info Capabilities. Capabilities Acceptable
ML20197D558
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/05/1986
From: Noonan V
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20197D563 List:
References
GL-83-28, NUDOCS 8605140297
Download: ML20197D558 (3)


Text

-

, MAY 0 51986 Docket Nos. : STN 50-456, STN 50-457 Mr. Dennis L. Farrar Director of Nuclear licensing .

Commonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

Subject:

Braidwood Station, Units 1 and 2 - Safety Evaluation of Compliance with Item 1.2 of Generic letter 83-28 By letters dated November 5, 1983, February 29, 1984 and April 4,1986 you responded to Item 1.2 (Post -Trip Review - Data and Information Capabilityl of Generic t.etter 83 -28. The enclosed Safety Evaluation, prepared with the assistance of Science Applications International Corporation, concluded that your post-trip review data and information capabilities for Braidwood are acceptable.

Sincerely, i

Vincent S. Noonan, Director 5 PWR Project Directorate #5 Division of PWR I.icensing-A

~

cc: See next page '

Enclosure. As stated /

Distribution Dechet F1le NRC PDR local PDR PD#5 R/F T. Novak OELD ,'

E. Jordan B. Grimes v J. Partlow I.. Olshan M. Rushbrook ACRS (10I D#5 01shan tib#

g/54 DIR:PD VSN n 5/5/86 5 /86 e l

8605140297 860505 PDR ADOCK 05000456 A PDR

,p unq

. ,[

kg UNITED STATES NUCLEAR REGULATORY COMMISSION 5 'j WASHINGTON, D. C. 20555 o,

. . . .+ . 'p N 05 W Docket Nos. : STN 50-456, STN 50-457 Mr. Dennis I., Farrar Director of Nuclear I.icensing Conynonwealth Edison Company P.O. Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

Subject:

Braidwood Station, Units 1 and 2 - Safety Evaluation of Compliance with Item 1.2 of Generic l.et ter 83-28 By letters dated November 5, 1983, February 29, 1984 and April 4, 1986 you responded to Item 1.2 (Post -Trip Review - Data and Information Capability) of Generic l.etter 83 -28. The enclosed Safety Evaluation, prepared with the assistance of Science Applications International Corporation, concluded that your post-trip review data and information capabilities for Braidwood are acceptable.

Sincerely,

/ p - /

nt nan, frector R Pro" ct D ectorate #5 DivisiopofPWRI.icensing-A

Enclosures:

As stated cc: See next page

6 Mr. Dennis L. Farrar Braidwood Station Comonwealth Edison Company Units 1 and 2 cc:

Mr. William Kortier Ms. l.orraine Creek  ;

Atomic Power Distribution Route 1, Box 182 Westinghouse Electric Corporation Manteno, Illinois 60950 Post Office Box 355 Pittsburgh, Pennsylvania 15230 Douglass Cassel, Esq.

109 N. Dearborn Street

, Joseph Gallo, Esq. Chicago, Illinois 60602  :

Isham, t.incoln & Beale 1150 Connecticut Ave., N. W. Elena 7. Xezelis, Esq.

Suite 1100 Isham,t.incoln & Beale Washington, D. C. 20036 Three First National Plaza Suite 5200 C. Allen Bock, Esq. Chicago, Illinois 60602 Post Offices Box 342 Urbana, Illinois 61801 Mr. Charles D. Jones, Director Illinois Emergency Services Thomas J. Gordon, Esq. and Disaster Agency Waaler, Evans & Gordon 110 East Adams Street 2503 S. Neil Springfield, Illinois 62706 Champaign Illinois 61820 George I.. Edgar Ms. Bridget little Rorem Newman & Poltzinger, P.C.

Appleseed Coordinator 1615 L Street, N.W.

117 North Linden Street Washington, D.C. 20036 Essex, Illinois 60935 Michael Miller, Esq.

Mr. Edward R. Cress Isham,t.incoln & Beale Nuclear Safeguards and One First Nationti Plaza t.icensing Division 42nd Floor Sargent & I. undy Engineers Chicago, Illinois 60603 55 East Monroe Street Chicago, Illinois 60603 U. S. Nuclear Regulatory Comission Resident Inspectors Office RR#1, Box 79 Braceville, Illinois 60407 Regional Administrator Region III U. S. Nuclear Regulatory Commission .

799 Roosevelt Road Glen Ellyn, Illinois 60137

- - . . - - . . . . - , - - _ , + ?A ..