Monthly Operating Rept for Feb 1986
ML20197D542
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/28/1986
From: Richardson M, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-35547-EEVB, NUDOCS 8605140293
Download: ML20197D542 (11)


Text

--

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-52@

UNIT NAME PMNg@-1 DATE 034ggig@

COMPLETED BY M cPs Righardsgn TELEPHONE 6@g-922-ggg0 Exit 6523 QESRBIlyG gIeIyS

1. Unit Name: Egig yergg Uggigat Ggagrating Statigos ynit 1
2. Reporting Period:Fgbruary 1986 (2/1/86 to 2/12/86)
3. Licensed Thermal Power (MWt): @@g0
4. Nameplate Rating (Gross MWe): 14@@
5. Design Electrical Rating (Net MWe): Ig2O
6. Maximum Dependable Capacity (Gross MWe):Tg pg dgigrmingd
7. Maximum Dependable Capacity (Net MWe): Tg bg dgigrmingd
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: _

_ _ - - - __ _ _ _ _ _ ==_-- . _ _ - _ _ _ - -

Power Level To Which Restricted,._____

9. If Any (Net MWe): _NQNg____
10. Reasons For Restrictions, If Any __ _ _ _ _ _ _ _ _ _ _

________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - = - - - . - - - _ - - - - - - - -

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period ___288____ 1032__ __9792
12. Number Of Hours Reactor Was Critical ___219.2__ ____604.7_ __3331.7_
13. Reactor Reserve Shutdown Hours _____0____ _____0____ __.._0____
14. Hours Generator On-Line ___173.0__ ___536.8__ __2556.6_
15. Unit Reserve Shutdown Hours _____0____ __0____ ___ O____
16. Gross Thermal Energy Generated __564,769_ 1,830,340_ 6,224,529_

(MWH)

17. Gross Electrical Energy Generated __189,600_ __617,600_ 1,954,300_

(MWH)

18. Net Electrical Energy Generated __169,813_ __583,513_ 1,711,163_

(MWH)

19. Unit Service Factor ___N/A____ ___N/A____ __N/A____
20. Unit Availability Factor ___N/A____ ___N/A____
21. Unit Capacity Factor (Using MDC __N/A____

N/A____ ___N/A____ __N/A____

Net)

22. Unit Capacity Factor (Using DER ___N/A____ ___N/A____

Net) __N/A____

23. Unit Forced Outage Rate ___N/A____ ___N/A____ __N/A____
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __Sutvgillengg Test Qutagg - 3L@@t 49 days ______
25. If Shutdown At End Of Report Period, Estimated Date of Startups______
26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY ___5/85_____

INITIAL ELECTRICITY ___5/25/85___

___6/85_____ ___6/10/85___

COMMERCIAL OPERATION __11/85_____ ___2/13/86___

0605140293 860220 PDR ADOCK 05000528

\

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-52g_ ___

UNIT __ __ PVN@S-1 _

DATE_ 03400/86 ___

COMPLETED BY_McP s Righards9D TELEPHONE _608-93g-2300

_Ent s 6Q23_____

MQNTH: February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 _846___ 17 2 837 ___

. _ _ _ 18 ___________ _____

3 _________298 _____

19 ___ _ ___ _____- -

4 ___( 77) __ _ _ __ 20 5 _

____ (74) ___ __ 21 __ __ _ _______ _

6 _

(75) __ _____ 22 - _____ __ __

7 _ _ _ _ _ 1,237- _ _ _ _ _ _ _

23 _ _ _ __ __ _____

O __

_ 456 _ _ _ 24 __

9 _______1,227 _

____ 25 _

10 _ 1,244_ 26 _ _ _ _ _

11 _ _ _ __ _ 1 , 2 4 2 _ ______ 27 _ _____ __

__=__ _ _ _

12 _______1,228_________ _

28 ______________________

13 _ _ _ _ ____ _ _ _ ________

14 _ __________________

15 ___________ ___

'16 _ _ _ _ _ _ = _ _ _ _ _ __ ___

1 1

1 C

i

REFUELING INFoRMATION SOCKET NO._gg-Qgg _ _ _

UNIT _______pyNQS-1 ____

DATE__ 034ggl@@ __

COMPLETED BY_M._En Bichandsgn TELEPHONE __q03-933-3300

__Egit ggg3

1. Scheduled date for next refueling shutdown. l 03/01/87
2. Scheduled date for restart following refueling.

i

)

04/19/87 1
3. Will refueling or resumption of operation thereafter require a l Technical Specification change or other license amendment? l Not Yet Determined What will these be?

Not Yet Determined

4. Scheduled date for submitting proposed licensing action and supporting information.

Not Yet Determined

5. Important Licensing considerations associated with refueling,
e. g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not Yet Determined

6. The number of fuel assemblies.

a) In the core._241_________ ___

b) In the spent fuel storage pool._____0_______

7. Licensed spent fuel storage capacity.____1330______

Intended change in spent fuel storage capacity.__Ngce______

8. projected date of last refueling that can be discharged to l spent fuel storage pool assuming present capacity.

e 2002 (w/ annual reloads and full core discharge capability).

SUM 598Y QE QEEBATING EEEEBigNGE EQB IME MQNIS DOCKET NO. Q@-528 UNIT ____ _ _ _ . PVNGS-1 DATE__ ___@34@@f8@

COMPLETED BY_M.2_ _ Righardson TELEPHONE __6@2-932-Q300

__Ent. 6593 B2/01 0700 - Plant in Mode 1 with Reactor power at 70%, main generator at 916 MWe.

82/02 Invest igat ion of "B" Feedwater pump revealed a 360 degree shaft crack.

82/02 2236 - Plant at 60% power.

C2/03 1145 - Reactor trip on low level on #2 steam generator. SBCG quick open caused overcooling which led to SIAS/CIAS and MSIS. Plant in Mode 3.

82/06 0250 - Entered Mode 2.

82/06 0316 - Reactor critical.

02/07 1522 - Entered Mode 1.

02/07 1818 - Main generator on line.

82/07 1837 - Reactor trip on lo Steam Generator level due to problems controlling steam generator levels after swapover from downcomer to economizer valves. Plant ~in Mode 3.

02/08 0152 - Entered Mode 2.

02/08 0158 - Reactor critical.

02/08 0736 - Entered Mode 1.

C2/08 0919 - Placed main generator on line.

l i

l l

- - ~ -4

NRC Monthly Report for February Dage 2 C2/08 2000 - Reactor at 90% power, main generator at 1063 MWe.

02/08 2215 - Reactor power at 95%, commencing 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> run for ACC.

02/12 2050 - Reactor power at 99.3%, main generator 1309 MWe.

02/13 0215 - The 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> run at >95% power for Arizona Corporation Commission was completed satisfactorily.

02/18 0819 - Reactor at 99.45% power, main generator 1295 MWe.

1 I

l l

l l

+ .

' * ' UNIT $NUTDOWNS AND POWER REDUCTIONS DOCKET NO. Mn 9?A- t UNIT NAHC ~ PVtKM-I . .

I

. l DATE 03/08/86 . **

COMPLETED BY N.V. R i c h a rri snn

  • TELEPHONE - Q U-slon vvr Aso3 .

Method or

  • Shutting ,

., Down System Component Cause & Corrective 1 Duration 2 3 l.ER 4 5 Action to No. Date Type ( flou rs ) Reason Reactor No. Code Code ' Prevent Recurrence .

1 36 02/03/86 F .63.6 A 3 1-86-018 ,

SJ PMC 'Rx trip'cn low level'#2 S/G.

i i 37 02/05/86 F '44 A N/A, Misalignmeny of FWP.

38 02/07/86 F 7.4 G 3 1-86-007 Rx trip on low level S/G due to scapover from dlowncomer to economizer valves.

1 i

6 i

1 8

1 l

s -

1 2 -

3 4 1 T-Fo rced iten son: Method:

s-scheduled A-Eaufpment refluro (Explain) -Manical Exhibit F - Instructions ror rrnparation or oata n-Ha f ntenance or Test 2-Hancia l scram. Entry slicets ror Licensee -

C-Rerueling 3-Automa t ic Scram, tvent Report (LER) Flie

, D-Regulatory itestriction as-Continua t ion f rom- ,

E-Operator Training 4 License Examinetton (NUREC 0161)

  • Provloeis Month T-Admini s t ra t ive 5-Redisction or 20% $

C-Ope ra t iona l Error (Expleln) ' or Creator in the Exhibit H Same Source H-Other (Explain) Past 2ts llours

'. i- 9-Other ( Expla in)
. s onn..
  • l NRC MONTHLY OPERATING REPORT DOCKET NO. Eg-Q2g UNIT NAME EVugg1 DATE 0340gggg COMPLETED BY M cP s Righgrdgon TELEPHONE 60g-932-530g Ent s 6523 OEEE9Ilug SIBIUS
1. Unit Names Balo Vgtdg Ngglgar Generating Statigno Unit 1
2. Reporting Period:Fgbruary 1906 (2/13/86 to 2/28/86)
3. Licensed Thermal Power (MWt): 3gg0
4. Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): 1210 1
6. Maximum Dependable Capacity (Gross MWe): 1892
7. Maximum Dependable Capacity (Net MWe): 1@00
8. If Changes Occur In Capacity Ratings (Items Number 3 I l

Through 7) Since Last Report, Give Reasons: _ _

____ Commercial Operation _____ ____ - _____

9. Power Level To Which Restricted, If Any (Net MWe): NONE 1C. Reasons For Restrictions, If Any ________________ _______

This Month Yr.-to-Date Cumulative

11. Hours In Re port ing Period ___384 384___ ____384__
12. Number Of Hours Reactor Was Critical ___384____ _384___ ____384__  ;
13. Reactor Reserve Shutdown Hours _____0____ _

_0____

____0____

14. Hours Generator On-Line 384____ ____384___ 384__

15, Unit Reserve Shutdown Hours _____0____ __

_ _0____ ____0____

16. Gross Thermal Energy Generated _1,446,400 _1,446,400 1,446,400_

(MWH)

17. Gross Electrical Energy Generated __499,700_ __499,700_ __499,700_

(MWH)

10. Net Electrical Energy Generated __470,464_ __470,464_ __470,464_

(MWH) 19, Unit Service Factor ___100____ ___100____ __100____ l

23. Unit Availability Factor 100____ ___100____ __100____ l
21. Unit. Capacity Factor (using MDC 102.10_ ___102.10_ __102.10_ l Net)
22. Unit Capacity Factor (Using DER ____96.47_ ____96.47_ ___96.47_ l Net)
23. Unit Forced Outage Rate _____0____ _____0____ ____0____
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):__EgCvgillenge Iggt gutagg - 34@@t 49 days ______
25. If Shutdown At End Of Report Period, Estimated Date of Startups______
26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY ___5/85_____ ___5/25/85___

INITIAL ELECTRICITY ___6/85_____ ___6/10/85___

COMMERCI AL OPERATION __11/85_____ ___2/13/86___

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. Q0-52@_. _ _ _ _

UNI T_ _ _ _ _ _ _ PVN@S-1 DATE______g@l0@fg@

COMPLETED BY_M._P._ Righandsgn TELEPHONE _602:932:5300

_Egte 6593 _

MQt!Ttj February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 __

___ 17 _ _ ____1,225___ _ _ __ _ _ _ _

2 __-- - -- 18 _________1e212 3 _ _ _ _ _ _ _ 19 _

1,224 4 _ _ _ _ _ _ _ _ -


__ _-___ 20 __ ___1,230__ ___

5 _ _ _ _ _ ___ __ _ _

_ _ _ _ _ 21 ________1,235 _____

6 __

22 ____ 1,237_ _ __

7 -_-- = _ - - - __ _ _ _ _ _ _ _ _ _ 23 _________1,237__ __

C _ _ _ _ _ _ _ 24 __ _ _ 1 , 2 2 8 _ _ _ _ _ _ _ __

1 9 _ _ _______- ___ ___

25 __ _ _1,229_ _ _ _ _

1 10 _ __________________ 26 1,225 __

11 _ _ _ _ _ _ _ __ _ _ _ _ __ _ _ _ ___ 27 1,234_ _ _ _ _ _

12 _______ -- _ _ _ - - -_ 28 1,230____________

13 ___ ____1,230__ ____ _ ___

14 ___ ____1,224_________ _ _

15 __ 1,299________ _

16 _______1,205_______ __ _ _

au

_ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ __-_________m _ _ - _

f REFUELING INFORMATION J

DOCKET NO. _Q&--5gg_ __ ___ _

UNIT ____ _PMNGS-1 _

DATE____ 034g6466_____

COMPLETED BY_M. gu Highardsgn TELEPHONE __geg-23g-gge0____

__ Ento E523 -- - - _ =_

1. Scheduled date for next refueling shutdown.

93/01/87

2. Scheduled date for restart following refueling.

04/19/87

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not Yet Determined What will these be?

! Not Yet Determined

4. Scheduled date for submitting proposed licensing action and supporting information.

No t Yet Determined

5. Important Licensing considerations associated with refueling,
e. g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not Yet Determined E. The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool._ l O_______

7. Licensed spent fuel storage capacity.____1gg2______

Intended change in spent fuel storage capacity.__Noce______

C. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2002 (w/ annual reloads and full core discharge capability).

. . . . . _ _ _ - . ~ _ . . _ _ --. _ ._. ._.- - -_ _ .-_ . _ - .

s s '

un e e .. . rv, , , , - , ,

J DATC March lu. 1960 ,

, COMPLETED BY N.P. Richardsng TELEril0NC - Q U-5 700 Pye Ar,03 Hethod of g

Shutting Down f' System Component

'Cause ar Corrective 1 Dura t ion 2

  • 3 1.ER 4 5 Action to
  • No. Date Type (slours ) Reason Rosctor No. Codo Code ' Prevent Recurrence I  ? .

~-'

3 . .

j ,

j y NONE -

i  ! .

.s . . .

k I

t. I e

E s

a

i 1

i 1 2 * .. t T-Fo rced Rensing 3 la S-scheduled .

Method A-roulpment re fluro (Explain) 1-Hanual Exhibit T = Instructions D-Haintenance or Test '

2-Hanual Scram.

for traparation of Da tn C-Rcructing ,

Entry Shoots for Licensee

, 0-negulatory Restriction 3-Automa tic scram. Event Report (LER) File T-operator Training & License Examination 4-Cont inua t ion f rom- (NunEC 0161)

  • r -

T-Administrative rrovious Month

  • c-opo ra t iona l Error (Explain) . , ' '
  • 5-neduction or 20% 5 H-Other (Explain) * '-

or creator in the Exhibit H-Same Source P

o ~ast 27: * ~llours

- ' ' ' ~^ _ __ _

2' A y

Arizona Nuclear Power Project P O BOX 52034

March 14, 1986 ANPP-35547 EEV8/LJM/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating, Station (PVNGS)

Unit 1 Docket No. STN-50-528 (License NPF-41)

February Monthly Operating Report File: 86-024-404

~

Dear Mr. Scroggins:

4 Attached please find the February,1986, Manthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours,

-x

.. . - . M M O E. E... Van Brunt, Jr.

Executive Vice President Project Director EEVB/LJM/dlk Attachments -

cc: J. B. Martin (al1~w/a)

~

R. P. Zimmerman E. A. Licitra ,

A. C. Gehr .