NRC MONTHLY OPERATING REPORT DOCKET NO.
50-52@
UNIT NAME PMNg@-1 DATE 034ggig@
COMPLETED BY M P Righardsgn c s TELEPHONE 6@g-922-ggg0 Exit 6523 QESRBIlyG gIeIyS 1.
Unit Name: Egig yergg Uggigat Ggagrating Statigos ynit 1 2.
Reporting Period:Fgbruary 1986 (2/1/86 to 2/12/86) 3.
Licensed Thermal Power (MWt): @@g0 4.
Nameplate Rating (Gross MWe): 14@@
5.
Design Electrical Rating (Net MWe): Ig2O 6.
Maximum Dependable Capacity (Gross MWe):Tg pg dgigrmingd 7.
Maximum Dependable Capacity (Net MWe):
Tg bg dgigrmingd 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
==_--
9.
Power Level To Which Restricted,._____
If Any (Net MWe): _NQNg____
- 10. Reasons For Restrictions, If Any
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - = - - -. - - - _
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
___288____
1032__
__9792
- 12. Number Of Hours Reactor Was Critical
___219.2__
____604.7_
__3331.7_
- 13. Reactor Reserve Shutdown Hours
_____0____
_____0____
__.._0____
- 14. Hours Generator On-Line
___173.0__
___536.8__
__2556.6_
- 15. Unit Reserve Shutdown Hours
_____0____
__0____
O____
- 16. Gross Thermal Energy Generated
__564,769_
1,830,340_
6,224,529_
(MWH)
- 17. Gross Electrical Energy Generated
__189,600_
__617,600_
1,954,300_
(MWH)
- 18. Net Electrical Energy Generated
__169,813_
__583,513_
1,711,163_
(MWH)
- 19. Unit Service Factor
___N/A____
___N/A____
__N/A____
- 20. Unit Availability Factor
___N/A____
___N/A____
__N/A____
- 21. Unit Capacity Factor (Using MDC N/A____
___N/A____
__N/A____
Net)
- 22. Unit Capacity Factor (Using DER
___N/A____
___N/A____
__N/A____
Net)
- 23. Unit Forced Outage Rate
___N/A____
___N/A____
__N/A____
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): __Sutvgillengg Test Qutagg - 3L@@t 49 days ______
- 25. If Shutdown At End Of Report Period, Estimated Date of Startups______
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
___5/85_____
___5/25/85___
INITIAL ELECTRICITY
___6/85_____
___6/10/85___
COMMERCIAL OPERATION
__11/85_____
___2/13/86___
0605140293 860220 PDR ADOCK 05000528
\\
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-52g_
UNIT __ __ PVN@S-1 DATE_
03400/86 COMPLETED BY_McP Righards9D s
TELEPHONE _608-93g-2300
_Ent 6Q23_____
s MQNTH:
February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
_846___
17 2
837 18 ___________
3
_________298 19 ___ _
4
___ 77) 20
(
5
____ 74) ___
(
21 6
(75) __
22 -
7 1,237-23 _ _ _
O 456 24 9
_______1,227 25 10 _
1,244_
26 11 _ _ _
__ _ 1, 2 4 2 _
27 _ _____ __
__=__ _ _ _
12 _______1,228_________
28 13 _ _ _ _ ____ _ _ _
14 15 ___________
'16
_ _ _ _ _ _ = _ _ _ _ _ __
1 1
1 C
i
REFUELING INFoRMATION SOCKET NO._gg-Qgg UNIT _______pyNQS-1 DATE__
034ggl@@
COMPLETED BY_M._En Bichandsgn TELEPHONE __q03-933-3300
__Egit ggg3 1.
Scheduled date for next refueling shutdown.
l 03/01/87 2.
Scheduled date for restart following refueling.
i
)
04/19/87 1
3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not Yet Determined What will these be?
Not Yet Determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not Yet Determined 5.
Important Licensing considerations associated with refueling,
- e. g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not Yet Determined 6.
The number of fuel assemblies.
a) In the core._241_________
b) In the spent fuel storage pool._____0_______
- 7. Licensed spent fuel storage capacity.____1330______
Intended change in spent fuel storage capacity.__Ngce______
8.
projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2002 (w/ annual reloads and full core discharge capability).
e
SUM 598Y QE QEEBATING EEEEBigNGE EQB IME MQNIS DOCKET NO.
Q@-528 UNIT ____ _ _ _.
PVNGS-1 DATE__
___@34@@f8@
COMPLETED BY_M.2_ _ Righardson TELEPHONE __6@2-932-Q300
__Ent. 6593 B2/01 0700 - Plant in Mode 1 with Reactor power at 70%, main generator at 916 MWe.
82/02 Invest igat ion of "B" Feedwater pump revealed a 360 degree shaft crack.
82/02 2236 - Plant at 60% power.
C2/03 1145 - Reactor trip on low level on #2 steam generator.
SBCG quick open caused overcooling which led to SIAS/CIAS and MSIS.
Plant in Mode 3.
82/06 0250 - Entered Mode 2.
82/06 0316 - Reactor critical.
02/07 1522 - Entered Mode 1.
02/07 1818 - Main generator on line.
82/07 1837 - Reactor trip on lo Steam Generator level due to problems controlling steam generator levels after swapover from downcomer to economizer valves.
Plant ~in Mode 3.
02/08 0152 - Entered Mode 2.
02/08 0158 - Reactor critical.
02/08 0736 - Entered Mode 1.
C2/08 0919 - Placed main generator on line.
l i
- - ~
-4
NRC Monthly Report for February Dage 2 C2/08 2000 - Reactor at 90% power, main generator at 1063 MWe.
02/08 2215 - Reactor power at 95%, commencing 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> run for ACC.
02/12 2050 - Reactor power at 99.3%, main generator 1309 MWe.
02/13 0215 - The 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> run at >95% power for Arizona Corporation Commission was completed satisfactorily.
02/18 0819 - Reactor at 99.45% power, main generator 1295 MWe.
l
+
' * ' UNIT $NUTDOWNS AND POWER REDUCTIONS DOCKET NO.
Mn 9?A-t I
UNIT NAHC ~ PVtKM-I l
DATE 03/08/86 COMPLETED BY N.V.
R i c h a rri snn TELEPHONE - Q U-slon vvr Aso3 Method or Shutting Down System Component Cause & Corrective 1
Duration 2
3 l.ER 4
5 Action to No.
Date Type
( flou rs )
Reason Reactor No.
Code Code '
Prevent Recurrence 1
36 02/03/86 F
.63.6 A
3 1-86-018 SJ PMC
'Rx trip'cn low level'#2 S/G.
i i
37 02/05/86 F
'44 A
N/A, Misalignmeny of FWP.
38 02/07/86 F
7.4 G
3 1-86-007 Rx trip on low level S/G due to scapover from dlowncomer to economizer valves.
1 i
6 i
1 1
8 l
s 1
2 3
4 1
T-Fo rced iten son:
Method:
Exhibit F - Instructions s-scheduled A-Eaufpment refluro (Explain)
-Manical ror rrnparation or oata n-Ha f ntenance or Test 2-Hancia l scram.
Entry slicets ror Licensee C-Rerueling 3-Automa t ic Scram, tvent Report (LER) Flie D-Regulatory itestriction as-Continua t ion f rom-(NUREC 0161)
E-Operator Training 4 License Examinetton Provloeis Month T-Admini s t ra t ive C-Ope ra t iona l Error (Expleln) '
5-Redisction or 20%
or Creator in the Exhibit H Same Source H-Other (Explain)
Past 2ts llours
. s onn..
i-9-Other ( Expla in)
NRC MONTHLY OPERATING REPORT DOCKET NO.
Eg-Q2g UNIT NAME EVugg1 DATE 0340gggg COMPLETED BY M P Righgrdgon c s TELEPHONE 60g-932-530g Ent 6523 s
OEEE9Ilug SIBIUS 1.
Unit Names Balo Vgtdg Ngglgar Generating Statigno Unit 1 2.
Reporting Period:Fgbruary 1906 (2/13/86 to 2/28/86) 3.
Licensed Thermal Power (MWt): 3gg0 4.
Nameplate Rating (Gross MWe): 1403 5.
Design Electrical Rating (Net MWe):
1210 1
6.
Maximum Dependable Capacity (Gross MWe):
1892 7.
Maximum Dependable Capacity (Net MWe):
1@00 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
l
____ Commercial Operation 9.
Power Level To Which Restricted, If Any (Net MWe): NONE 1C. Reasons For Restrictions, If Any This Month Yr.-to-Date Cumulative
- 11. Hours In Re port ing Period
___384 384___
____384__
- 12. Number Of Hours Reactor Was Critical
___384____
_384___
____384__
- 13. Reactor Reserve Shutdown Hours
_____0____
_0____
____0____
- 14. Hours Generator On-Line 384____
____384___
384__
15, Unit Reserve Shutdown Hours
_____0____
_0____
____0____
- 16. Gross Thermal Energy Generated
_1,446,400
_1,446,400 1,446,400_
(MWH)
- 17. Gross Electrical Energy Generated
__499,700_
__499,700_
__499,700_
(MWH)
- 10. Net Electrical Energy Generated
__470,464_
__470,464_
__470,464_
(MWH) 19, Unit Service Factor
___100____
___100____
__100____
- 23. Unit Availability Factor 100____
___100____
__100____
- 21. Unit. Capacity Factor (using MDC 102.10_
___102.10_
__102.10_
Net)
- 22. Unit Capacity Factor (Using DER
____96.47_
____96.47_
___96.47_
Net)
- 23. Unit Forced Outage Rate
_____0____
_____0____
____0____
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):__EgCvgillenge Iggt gutagg - 34@@t 49 days ______
- 25. If Shutdown At End Of Report Period, Estimated Date of Startups______
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
___5/85_____
___5/25/85___
INITIAL ELECTRICITY
___6/85_____
___6/10/85___
COMMERCI AL OPERATION
__11/85_____
___2/13/86___
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Q0-52@_.
UNI T_ _ _ _ _ _ _ PVN@S-1 DATE______g@l0@fg@
COMPLETED BY_M._P._ Righandsgn TELEPHONE _602:932:5300
_Egte 6593 MQt!Ttj February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 17 _ _
____1,225___
2 18 _________1e212 3
19 1,224 4
___1,230__
20 5
21 ________1,235 6
22 ____
1,237_ _
7
= _ - - -
23 _________1,237__
C 24
__ _ _ 1, 2 2 8 _ _ _ _ _ _ _
9 25 __ _
_1,229_
1 10 _
26 1,225 11 27 1,234_
12 _______ -- _ _ _ - - -_
28 1,230____________
13 ___ ____1,230__ ____ _ ___
14 ___ ____1,224_________ _ _
15 __
1,299________ _
16 _______1,205_______ __ _ _
au m
f REFUELING INFORMATION J
DOCKET NO. _Q&--5gg_ __ ___
UNIT ____
_PMNGS-1 DATE____
034g6466_____
COMPLETED BY_M. gu Highardsgn TELEPHONE __geg-23g-gge0____
__ Ento E523 --
- - _ =
1.
Scheduled date for next refueling shutdown.
93/01/87 2.
Scheduled date for restart following refueling.
04/19/87 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not Yet Determined What will these be?
Not Yet Determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
N t Yet Determined o
- 5. Important Licensing considerations associated with refueling,
- e. g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not Yet Determined E. The number of fuel assemblies.
a) In the core. 241 b) In the spent fuel storage pool._
O_______
- 7. Licensed spent fuel storage capacity.____1gg2______
Intended change in spent fuel storage capacity.__Noce______
C.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2002 (w/ annual reloads and full core discharge capability).
~ _..
s s '
un e e...
rv,,,, -,
J DATC March lu. 1960 COMPLETED BY N.P.
Richardsng TELEril0NC - Q U-5 700 Pye Ar,03 Hethod of g
Shutting f'
Down System Component
'Cause ar Corrective 1
Dura t ion 2
- 3 1.ER 4
5 Action to No.
Date Type (slours )
Reason Rosctor No.
Codo Code '
Prevent Recurrence I
?
~-
3 j
j y
NONE i
.s k
I t.
I e
E s
a i
1 i
1 2
.. t 3
la T-Fo rced Rensing Method Exhibit T = Instructions S-scheduled A-roulpment re fluro (Explain) 1-Hanual for traparation of Da tn D-Haintenance or Test C-Rcructing 2-Hanual Scram.
Entry Shoots for Licensee 0-negulatory Restriction 3-Automa tic scram.
Event Report (LER) File 4-Cont inua t ion f rom-(NunEC 0161)
T-operator Training & License Examination rrovious Month T-Administrative r
5-neduction or 20%
5 c-opo ra t iona l Error (Explain) or creator in the Exhibit H-Same Source H-Other (Explain)
P o ~ast 27: llours
- ~ - ' ' '
~^
2' A
y Arizona Nuclear Power Project P O BOX 52034
March 14, 1986 ANPP-35547 EEV8/LJM/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating, Station (PVNGS)
Unit 1 Docket No. STN-50-528 (License NPF-41)
February Monthly Operating Report File: 86-024-404
~
Dear Mr. Scroggins:
4 Attached please find the February,1986, Manthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yours,
-x M
M O
E. E... Van Brunt, Jr.
Executive Vice President Project Director EEVB/LJM/dlk Attachments cc:
J. B. Martin (al1~w/a)
R. P. Zimmerman
~
E. A. Licitra A. C. Gehr INPO Records Center N
4
'e
..