Monthly Operating Rept for Feb 1986
ML20197D311
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1986
From: Elms A, Romberg W
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-8802, NUDOCS 8605140218
Download: ML20197D311 (6)


Text

_.

f.

AVERAGE MILY UNIT POWER LEVEL DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE 3/7/86 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 265 2

0 18 166 3

0 19 67 4

0 20 266 5

0 21 147 6

0 22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

l 13 0

29 0

14 0

30 0

_z_

l 15 213 31 0

i 16 266 l

8605140218 860228 PDR ADOCK 05000423 R

PDR

OPERATINC IRTA REPORT DOCKET N0. 5_0-423 _

DATE 3/7/86 COMPLETED BY A. Elms TELEPHONE {203)444-5388 OPERATING STATUS 1.

Unit Name: Millstone Unit 3 NOTES 2.

Reporting Period: February 1986 3.

Licensed Thermal Power (MWt): 3411 4.

Nameplate Rating (Gross MWe): 1253 5.

DesignElectricalRating(NetMWe): J156 6.

Maximum Dependable Capacity (Gross M4e): 0 7.

Maximum Dependable Capacity (Net MWe): 0 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: Consistency with Reportina Reauirements 9.

PowerLevelToWhichRestricted,IfAny(NetMWe): N/A 10.

Reasons For Restrictions, If Any: N/A This Month Yr To Date Cwoulatire 11.

Hours In Reporting Period 399.6 399.6 399.6 12.

Number of Hours Reactor Was Critical 174.1 174._1 174.1 13.

Reactor Reserve Shutdown Hours 0.0 0.0

_ 0.0 _

14.

Hours Generator On Line 143.5 143.5 143.5 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (MWH) 179659.2

_179659.2 179659.2 17.

Gross Electrical Energy Generated (MdH) 40425.7 40425.7

_ 40425.7 18.

NetElectricalEnergyGenerated(MWH) 28470.7

__28470.7 28470.7 19.

Unit Service Factor N/A N/A N/A _

i 20.

Unit Availability Factor N/A

_-N/A N/A 21.

UnitCapacityFactor(UsingMDCNet)

N/A N/A N/A 22.

Unit Capacity Factor (Using DER Net)

N/A

_ N/A N/A 23.

Unit Forced Outage Rate N/A N/A N/A 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

(See Attached) 25.

If Shut Dow(at End of Report Period, Estimated Date of Startup: March 5 26.

UnitsinTest' Status (PriortoCommercialOperation): Forecast Achieved Initial Criticality 1/23/06

__1/23/86__

Initial Electricity 2/12/86 2/12/36 Comercial Operation 5/1/86

~

s 1NIIT SINTID0lNIS Am PtRER REDUCTICIIS DOCKET NO. 50-423 I

UNIT Millstone Unit No.

3 DATE 3/7/86 C0pFLETED BY A. Eles TELEPHOE (203) 444-5388 REPORT IEINTH February __

Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Type (1)

(Hours)

Reason (2)

Down Reactor (3) Report i Code Code Prevent Recurrence N/A N/A S

272.4 H

N/A N/A N/A N/A Initial Plant Startup 86-01 2/12/86 F 20.7 G

3 86-014-00 2

N/A low S/G Level-Genera-tor program water level shorted to 01 -

personnel error.

86-02 2/13/86 F 35.5 H

3 - '~~ ~ ~ M -016-00 JC R/A Generai warning -

Cause Unknown

)

86-03 2/15/86 5 1.3 B

9 N/A TA TR8 Initial PIant 5tartup Testing-Turbine trip only 86-04 2/18/86 5 21.2 8

1 N/A AC RCT Initial Plant Startup Testing 86-U5 2/21/86 F 177.4 5

1 ft/A SJ SG Clean S/G 1

1 2

3 4

i

- F: Forr.ed

~~ Reason:

- Method:

Exhibit G - Instructions 1

S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data l

8 - Maintenance or Test 2 - Manual Stras Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)

E - Operator Training & License previews month Examination 5 - Power Reduction 5 F - Administrative (Duration =0)

Exhibit 1 - Same Source G-OperationalError(Explain) 9 - Other (Explain)

H - Other (Explain)

A

,e' s

Doeratine Data Report Attachment

24. Scheduled Shutdowns Durina Startuo Testina March 15. 1986 i

Reactor Trip from 205 power during power Ascension Testing - 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i

duration.

March 25, 1986 Reactor Trip from 100% power during power Ascension Testing - 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> duration.

~

,..-----n,.,--,.

,--w,

.,.i..... a...

so <.. c 9

] [

=[ U nT

o. oNNECTICUT 001410270

<L : :===

March 10, 1986 HP-8802 Director, Office of Resource Management U. S. Nuclear Regulatory Consnission Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 86 3, covering operations for the period February 1, 1986 to February 28, 1986, is hereby forwarded.

Yours truly.

NORTHEAST NUCLEAR ENERGY COWANY b0dy 0 Wayne D. R g

Station Superintevident Millstone Nuclear Power Station WDR/DM:se Attachment cc: Regional Administrator, Office cf Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement Washington, D.C. (10)

U. S. Nuclear Regulatory Consnission, c/o Document Management Branch, Washington, D. C. 20555 9

.-., ~.. a.- au n. e--

NORTHEAST UTILITIES g]-]- $.~~~-

9 T o o. CONNECTICUT 06W 0270 L

~50200%~

March 10, 1986 MP-8802 Director Office of Resource Management U. S. Nuclear Reguletory Comission Washington, D. C. 20555

Reference:

Facility Operating License No. NpF-49 Docket No. 50-423 l

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 86-3, covering operations for the period February 1, 1986 to February 28, 1986, is hereby forwarded.

Yours truly, 1

NORTHEAST NUCLEAR ENERGY CopFANY NW 0 Wayne D. R Station Superinte ' nt-Millstone Nuclear Power Station WDR/DM:se Attachment ec: Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection z.nd Enforcement Washington, D.C. (10)

I U. S. Nuclear Regulatory Comist. ion, c/o Document Mar,agement Branch, Washington, D. C. 20555

--