NRC MONTHLY OPERATING REPORT DOCKET NO.
30-5g2 UNIT NAME 92Ng@-g DATE
@gf0gfg6 COMPLETED BY M Es Rigbgrgggg c
TELEPHONE 693-932-Q30@
Entt 6523 OEgRBIING SIBIUS 1.
Unit Name: Palo yerde Nggleat gegetating gigtigos Unig g 2.
Reporting Period:Fgbrugry i@@5 3.
Licensed Thermal Power (MWt): ]@00 4.
Nameplate Rating (Gross MWe): 140@
5.
Design Electrical Rating (Net MWe): igZ@
6.
Maximum Dependable Capacity (Gross MWe):Tg bg ggtgrmingd 7.
Maximum Dependable Capacity (Net MWe):
Tg bg ggtgrmingd O.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __
Recalculated according to definition 9.
Power Level To Which Rest rAct ed, If Any (Net 5We):120 MWt JO MWel
- 10. Reasons For Restrictions, If Any
______699 EserC 0 etalins 61seOse_______
9
=
This Month Yr.-to-Date Cumulative
- 11. Hours In Re port ing Period
___672_
1416
__2904____
- 12. Number Of Hours Reactor Was Critical
_____0 O____
O__
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
O __
____0__
- 15. Unit Reserve Shutdown Hours
_0 O_
O_____
- 16. Gross Thermal Energy Generated
._ _0_
_0
__0_____
(MWH)
- 17. Gross Electrical Energy Generated
_0
__0____
O____
(MWH)
- 18. Net Electrical Energy Generated
_____0 O____
_0____
(MWH)
- 19. Unit Service Factor
___N/A____
___N/A
__N/A____
- 20. Unit Availability Factor
___N/A____
___N/A_
__N/A____
- 21. Unit Capacity Factor (Using MDC
___N/A N/A_
__N/A____
Net)
- 22. Unit Capacity Factor (Using DER N/A N/A____
__N/A____
Net)
- 23. Unit Forced Outage Rate
___N/A_
N/A____
__N/A
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):__Ng signifigang gutage planned until after_____
untraggy run______ _ _
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup: _ _ _ _ _
N/A
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 3/86 INITIAL ELECTRICITY
___6/86
_[
COMMERCIAL OPERATION
__11/86_____
B605140212 860228
_. CL F'_294_. _.,
L i
PDR ADOCK 05000529
/
R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
30-Ug2_______
UNIT ___
_ PVNGS--2__
DATE_
_02/9@f@@
COMPLETED BY_MuP Richardgon u
TELEPHONE _603-233-2309
_E st,_ 6323 _
2 MONTH:
February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 O_. __
17 0-2 0
18 ___ _ __
_0 1
3 O__
19 0
4
__0 20 __
O______
5 0
21 0
6 0
22 O__ _
7 0_
23 _
_ _ _0 1
0 O_
24 0
9 0
25 0
10 O_
26 O___
11 0
_._z____
27 O_ _ _ _
12 0
28 O___
13
_0_
14 O_ _ _
15
=_
0 16 0.
REFUELING INFORMATION DOCKET NO._QO-Qgg_
UNIT _
PVNGE-g_____
DATE__
_03/0gfg6_____
COMPLETED BY_M.pu Bichardson TELEPHONE __60g-233-Q300
__Egtz @@93 l.
Scheduled date for next refueling shutdown.
01/02/88
)
2.
Scheduled date for restart following refueling.
02/20/88 3.
Will refueling or resumption of operation thereafter require a l
Technical Specification change or other license amendment?
Not Yet Determined What will these be?
l Not Yet Determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not Yet Determined
- 5. Important Licensing considerations associated with refueling,
- e. g.
new or di fferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not Yet Determined 6.
The number of fuel assemblies, a) In the core._g41_
b) In the spent fuel storage pool.__
_0
- 7. Licensed spent fuel storage capacity.____1335______
Intended change in spent fuel storage capacity.
None
_C.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2003 (w/ annual reloads and full core discharge capability).
t SUMM9RY QE QEg8ATIN@ EXEg8IENQE EQB Tdg MQNTS DOCKET NO.
50-529_ _
UNIT _
PVNGS-@__
DATE_
@32@gfg5 _
COMPLETED BY_M._En Eighardson__
TELEPHONE __@e2-93g-5300__ _
__Eut 6523 82/01 Plant in Mode 5.
02/19 1647 - Received a MSIS actuation.
MSIS signal was reset.
Problem found to be a bad power supply in PPS ESFAS.
C2/23 Completed group trip testing for all rod groups.
Test was l
satisfactory.
i 9..._,_
._m._..
8 i
'E UNIT SHUTOOWNS AND POWER REDUCTIONS af. DOCKET NO, En-M99 s.
UNIT NANC
?VNfS-?
'k 8'
DATE 13-08-6b j
COMPLETED BY
- 1. t'. R i c h a rrt enrg
\\
TELEPHONC ~ 4 U - D HO Fve A90}
I a
Nethod or Shutting
. Cause & Corrective Down System Component 1
Duration 2
3 1.CR 4
5 Action to No.
Date Type (Hours)
Reason Rosctor No.
Code Code Prevent Recurrence Not applic' ble - reactor, has not schievi!d initial criticality.
a 1
e k
5 i
f e4 k
i 1
2 J
4 F-Fo rced Reasnni Method!
[xhibit F = Instructions s-scheduled A-Caulpment ralluro (Cuplainl l-Hanual for renparation or onta n-ttaintenance or Test 2-Hanua l Scram.
Entry sheets ror f.lcensee C-(te rtte l ing 3-Automa tic Scram.
Event Report (LCR) File 0-negula tory Itcstriction la-continuation from.
(NURCC 0161)
E-operator training h I.lconse Examination Provfous Month F-Admi n i s t ra t ivo 5-Dcdtsction or 20%
5
Arizona Nuclear Power Project P O BOX 52034 e PHOENIX, ARIZONA 85072-2034 March 14, 1986 ANPP-35546 EEVB/LJM/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN-50-529 (Licenne NPF-46)
February Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the February, 1986, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yours,
\\
f S. \\. a a ;
oE E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/LJM/dk Attachments cc:
J. B. Martin (all w/a)
R. P. Zimmerr.an E. A. Licitra A. C. Gehr INPO Records Center