ML20197D303

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1986
ML20197D303
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/28/1986
From: Richardson M, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-35546-EEVB, NUDOCS 8605140212
Download: ML20197D303 (6)


Text

. .- ______

NRC MONTHLY OPERATING REPORT DOCKET NO. 30-5g2 UNIT NAME 92Ng@-g DATE @gf0gfg6 COMPLETED BY Mc Es Rigbgrgggg TELEPHONE 693-932-Q30@

Entt 6523 OEgRBIING SIBIUS

1. Unit Name: Palo yerde Nggleat gegetating gigtigos Unig g
2. Reporting Period:Fgbrugry i@@5
3. Licensed Thermal Power (MWt): ]@00
4. Nameplate Rating (Gross MWe): 140@
5. Design Electrical Rating (Net MWe): igZ@
6. Maximum Dependable Capacity (Gross MWe):Tg bg ggtgrmingd
7. Maximum Dependable Capacity (Net MWe): Tg bg ggtgrmingd O. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __ _

Recalculated according to definition

9. Power Level To Which Rest rAct ed, If Any (Net 5We):120 MWt JO MWel
10. Reasons For Restrictions, If Any __ ___

______699 EserC 09etalins 61seOse_______ _ __- _ _ _ , _ _

_ _ _ _ _ _ _ _ - _ - __ __ _ _ .__ =

This Month Yr.-to-Date Cumulative

11. Hours In Re port ing Period ___672_ 1416 __2904____
12. Number Of Hours Reactor Was Critical _____0 _

_ O____ O__

13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 O __ ____0__
15. Unit Reserve Shutdown Hours _0 _ _

O_ O_____

16. Gross Thermal Energy Generated ._ _0_ _0 __0_____

(MWH)

17. Gross Electrical Energy Generated _

_0 __0____ O____

(MWH)

18. Net Electrical Energy Generated _____0 _

_ O____ _0____

(MWH)

19. Unit Service Factor ___N/A____ ___N/A __N/A____
20. Unit Availability Factor ___N/A____ ___N/A_ __N/A____
21. Unit Capacity Factor (Using MDC ___N/A N/A_ __N/A____

Net)

22. Unit Capacity Factor (Using DER N/A N/A____ __N/A____

Net)

23. Unit Forced Outage Rate ___N/A_ N/A____ __N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):__Ng signifigang gutage planned until after_____

_____________ untraggy run______ _ _ _

25. If Shutdown At End Of Report Period, Estimated Date of Startup: _ _ _ _ _

N/A

26. Units In Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/86 INITIAL ELECTRICITY ___6/86 _[ ___

COMMERCIAL OPERATION __11/86_____ _

B605140212 860228 PDR ADOCK 05000529 R PDR __ _

_. CL F'_294_i .L/_ . , - -- - - -

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 30-Ug2_______

UNIT ___ _ PVNGS--2__ _

DATE_ _02/9@f@@ _____

COMPLETED BY_MuP u Richardgon TELEPHONE _603-233-2309

_E2st,_ 6323 _

MONTH: February 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 O_ . __ 17 0- __

2 _ _ _ _

0 __

18 ___ _ __ _0 __

1 3 _ _ _ _ O__ 19 0 4 __0 _ _ _ _

20 __ O______

5 0 21 0 __

6 0 22 O__ _ ____ __

7 _ _ _

_ 0_ __ _ _ _ _ _

23 _ _ _ _0 1

0 __

O_ 24 0 _ _ _

9 0 25 0 10 O_ __ 26 _

O____

11 0 _._z____ 27 __

O_ _ _ _

12 0 _ __ 28 O___ __

13 _0_ ________

14 O_ _ _ )

15 =_

0 __ _

16

0. __

REFUELING INFORMATION DOCKET NO._QO-Qgg_ _

UNIT _ PVNGE-g_____

DATE__ _03/0gfg6_____

COMPLETED BY_M.pu Bichardson TELEPHONE __60g-233-Q300 __

__Egtz @@93 _ _

l. Scheduled date for next refueling shutdown.

01/02/88 )

2. Scheduled date for restart following refueling.  ;

02/20/88 l

3. Will refueling or resumption of operation thereafter require a l Technical Specification change or other license amendment?

Not Yet Determined What will these be?

l Not Yet Determined

4. Scheduled date for submitting proposed licensing action and supporting information.

Not Yet Determined

5. Important Licensing considerations associated with refueling,
e. g. new or di fferent fuel design or supplier, unreviewed l design or performance analysis methods, significant changes in l fuel design, new operating procedures. I Not Yet Determined
6. The number of fuel assemblies, a) In the core._g41_

b) In the spent fuel storage pool.__ _0

7. Licensed spent fuel storage capacity.____1335______

Intended change in spent fuel storage capacity. None _ _ .

_C.-

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2003 (w/ annual reloads and full core discharge capability).

t SUMM9RY QE QEg8ATIN@ EXEg8IENQE EQB Tdg MQNTS DOCKET NO. 50-529_ _

UNIT _ PVNGS-@__

DATE_ ___ @32@gfg5 _

COMPLETED BY_M._En Eighardson__

TELEPHONE __@e2-93g-5300__ _ __

__Eut _ 6523 82/01 Plant in Mode 5.

02/19 1647 - Received a MSIS actuation. MSIS signal was reset. Problem found to be a bad power supply in PPS ESFAS.

C2/23 Completed group trip testing for all rod groups. Test was l satisfactory.

i

- - , _. . , , _ , , , , _ . . . - . . - _ , 9..._,_ ._m._.. .

8

, i .

s. 'E UNIT SHUTOOWNS AND POWER REDUCTIONS af. DOCKET NO, En-M99 8' "

UNIT NANC ?VNfS-? .

'k j .

DATE 13-08-6b . .*

, COMPLETED BY 1. t' . R i c h a rrt enrg

\

TELEPHONC ~ 4 U - D HO

, Fve A90} I a

Nethod or

  • Shutting ,

Down System Component . Cause & Corrective 1 Duration 2

  • 3 1.CR 4 5 Action to No. Date Type (Hours) Reason Rosctor No. Code Code Prevent Recurrence .

Not applic' a ble - reactor, has not schievi!d initial criticality.

1 e

k 5

i f

e4 k 1 2 .

J .

F-Fo rced Reasnni

' 4 s-scheduled A-Caulpment ralluro (Cuplainl Method! [xhibit F = Instructions n-ttaintenance or Test -

l-Hanual for renparation or onta C-(te rtte l ing 2-Hanua l Scram. Entry sheets ror f.lcensee -

, 0-negula tory Itcstriction 3-Automa tic Scram. Event Report (LCR) File E-operator training h I.lconse Examination la-continuation from. (NURCC 0161) * .

F-Admi n i s t ra t ivo Provfous Month

,, , , , 5-Dcdtsction or 20% 5

Arizona Nuclear Power Project P O BOX 52034 e PHOENIX, ARIZONA 85072-2034 March 14, 1986 ANPP-35546 EEVB/LJM/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN-50-529 (Licenne NPF-46)

February Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the February, 1986, Monthly Operating Report prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter, we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours,

\

f S . \. a a ; oE E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/LJM/dk Attachments cc: J. B. Martin (all w/a)

R. P. Zimmerr.an E. A. Licitra A. C. Gehr INPO Records Center