NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE February 1986 At the onset of the February 1986 reporting period, reactor power was 68%

Rated Thermal Power (31 MWe-net). Power was being escalated following the January 25-29 outage. A reactor power level of approximately 91% (44 MWe-net) was achieved on February 4. For the remainder of the reporting period, the plant coasted down. Reactor power was 84% (40 MWe-net) at the end of February.

No major safety-related maintenance was conducted during February. A Type B leakage test was conducted on the emergency airlock on February 17 with satisfactory results. No leakage was measured during the test.

B605140206 860228 PDR ADOCK 05000409 R PDR g gL[

YI

]

OPERATING DATA REPORT DOCKET NO. 50-409 DATE 03/05/86 COMPLETED BY Loree Malin TELEPHONE 608-689-2331 OPERATING STATUS NOTES:

1. Unit Name: La Crosse Boiling Water Reactor
2. Reporting Period: 0000, 02/01/86 to 2400, 02/28/86
3. Licensed Thermal Power (MWt ): 165
4. Nameplate Rating (Gross MWe ): 65.3
5. Design Electrical Rating (Net MW e): 50
6. Maximum Dependable Capacity (Gross MWe ): 50 l 7. Maximum Dependable Capacity (Net MWe ): 48
8. If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:

i

9. Power Level To Which Restricted, If Any (Net MW )-e
10. Reasons for Restrictions, If Any:

This Month Yr.-to-Date Cumulative i 11. Hours In Reporting Period 672 1,416 143,139

12. Number Of Hours Reactor Was Critical 672 1,175.0 97,255.9 )

i 13. Reactor Reserve Shutdown Hours 0 0 478 l

14. Hours Generator On-Line 672 1,124.1 90,625.0 l
15. Unit Reserve Shutdown Hours 0 0 79
16. Gross Thermal Energy Generated (MWH) 95,812.6 153,881.5 12,612,844.1_ l
17. Gross Electrical Energy Generated (MWH) 29,714 47,909 3,787,118
18. Net Electrical Energy Generated (MWH) 28,018 44,830 3,513,575
19. Unit Service Factor 100.0 79.4 63.3
20. Unit Availability Factor 100.0 79.4 63.4
21. Unit Capacity Factor (Using MDC Net) 86.9 66.0 51.1
22. Unit Capacity Factor (Using DER Net) 83.4 63.3 49.1
23. Unit Forced Outage Rate 0 20.6 9.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, March 9, 1986, Approximately 6 weeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

j WP-6.8

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-409 UNIT LACBWR DATE 03/05/86 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 MONTH February 1986 DAY AVERAGE DAILY POWER LEVEL DAY (MWe-Net) '

AVERAGE DAILY POWER LEVEL (MWe-Net) 1 33 17 42 2 37 18 42 3 41 19 42 4 44 20 42 5 44 21 42 6 44 22 41 7 44 23 41 8 43 24 41 9 43 25 41 10 43 26 41 11 43 27 40 12 43 28 40 13 43 29 NA 14 42 30 NA 15 42 31 NA 16 42 INSTRUCTIONS On this format, list the reporting month. the average daily unit power level in MWe-Net for each day in Compute to the nearest whole megawatt.

WP-6.8

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-409 UNIT NAME LACBWR

  • DATE 03/05/86 REPORT MONTH February 1986 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 ll Method of Licensee Cause & Corrective l

Duration Shutting Down Event System Component Action to No. Date Type l (Hours) Reason 2 Reactor 3 Report i Code 4 Code 5 Prevent Recurrence None ,

l l

l l

l 1 2 3 4 Reason: Method: Exhibit G-Instructionse F: Forced A-Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative 5 C-Operational Error (Explain) Exhibit 1 - Same Source H-Other (Explain)

REFUELING INFORMATION REQUEST

1. Name of Facility La Crosse Boiling Water Reactor (LACBVR)
2. Scheduled Date for Next Refueling Shutdown The tentative date for the next refueling shutdoun (EOC-IX) is March 9, 1986.
3. Scheduled Date for Restart Following Refueling The tentatively scheduled date for subsequent reactor startup is approximately April 17, 1936
4. Will Refueling or Resumption of Operation Thereafter Require a Technical Specification Change or Other License Amendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload Reference 10 CFR Section 50.59?

If no such review has taken place, when is it scheduled?

A License amendment vill be nesied for the new control rode uhich vill be installed.

5. Scheduled Date(s) for Submitting Proposed Licensing Action and Supporting Information.

December 1985

6. Important Licensing Considerations Associated with Refueling, e.g., ]

~

New or Dif ferent Fuel Design or Supplies, Unreviewed Design or Performance Analysis Methods, Significant Changes in Fuel Design, New Operating Procedure Some new control rods uilt be utilized.

WP-6.8 Q

1 REFUELING INFORMATION REQUEST - (Continued) l i 7. The Number of Fuel Assemblies (a) in the Core and (b) in the Spent Fuel Pool.

i Core Loading: 72 Fuel Assemblies i Spent Fuel Storage Pool Loading: 237 Irradiated Fuel Assemblies

.)

8. The Present Licensed Spent Fuel Pool Storage Capacity and the Size of any Increase in Licensed Storage Capacity that has been Requested or is Planned, in Number of Fuel Assemblies 440 Fuel Assemblies l 9. The Projected Date of the Last Refueling that can be Discharged to the j Spent Fuel Pool Assuming the Present Licensed Capacity 1992 l.

i i

i i

i

)

4 i

i i

)

j i

4

(

l i

l 4

i 1

1 1

1 i WP-6.8  !

D*

D DA/RYl.AND h [k COOPERAT/VE P.O. BOX 817 2615 EAST AV SOUTH March 5, 1986 LA CROSSE. WISCONSIN 54601 (608) 788 4 000 In reply, please -

refer to LAC-Il448 DOCKET NO.-50-409 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 MONTHLY OPERATING DATA REPORT FOR FEBRUARY 1986

Reference:

(1) NRC Letter, Reid to Madgett, dated September 19, 1977.

(2) NRC Letter, Reid to Madgett, dated December 29, 1977 Gentlemen:

In accordance with instructions contained in Reference (1) and Technical Specification Amendments contained in Reference (2), we are submitting information concerning operability and availability of the La Crosse Boiling Water Reactor (LACBWR) for the Month of February 1986.

Please contact us if there are any questions concerning this report.

Very truly yours, i

DAIRYLAND POWER COOPERATIVE I l

Jamcc W. Taylor, Cencral Manager JWT:LSG:sks l

cc: J. G. Keppler, Regional Administrator, NRC-DRO III John Stang, LACBWR Project Manager l NRC Resident Inspector I D. Sherman (ANI Library)