Forwards Insp Rept 50-424/85-55 on 850819-860214.Several Deficiencies Identified.Specific Programs Acceptable
ML20197B751
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/30/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20197B754 List:
References
NUDOCS 8605130111
Download: ML20197B751 (3)


See also: IR 05000424/1985055

Text

'

. .

4

p orgia Power Company April 30, 1986

vATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW OF V0GTLE READINESS REVIEW MODULE 5, OPERATIONS

ORGANIZATION AND ADMINISTRATION - REPORT NO. 50-424/85-55

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on August 19, 1985. Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were also conducted in NRC Bethesda offices, and the findings

from these reviews have also been discussed with your staff.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report. Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

This module does not address plant operating Technical Specifications which will

be reviewed separately.

The primary results of module 5 reviews and inspections are provided in the

summary and conclusions sections of the enclosed report. Within the findings

section, several deficiencies are identified. Your attention is invited to these

matters which will be pursued during future reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the specific programs reviewed by the NRC are

acceptable and comply with applicable regulatory requirements. Additionally, we

have determined +. hat you currently have controls and processes in place which

should assure proper implementation of all programs associated with operations

organization and administration and which will be verified during conduct of the

normal Near Term Operating License inspection program.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGWA1. SIGNED BYi

L NEl.SCII GRACE

J. Nelson Grace

Regional Administrator

Enclosure:

Inspection Report No. 50-424/85-55

cc w/ enc 1: (see page 2)

8605130111 860430

PDR ADOCK 05000424

G PDR

' '

90\

_ _ _ _ _ _ _ _ _ _ _ _ _

,

' -

,

_o -

Georgia ~ Power Company -2 April 30, 1986

cc w/ enc 1:

vit. E. Conway, Senior Vice President &

Project Director

A . O._ Foster, Vice President, Project

-d. Support D. Rice, Vice President, Project

Engineering

d . H. Pinson, Vice President, Project

Construction

A . T. Beckham, Vice President &

General Manager.- Operations

v/R. A. Thomas, Vice President,

Licensing

d.W. Hayes,VogtleQuality  ;

l

h.AsturanceManager-

C. Ramsey, Manager -

Readiness Review

. / G. B. Bockhold, General Manager,

Nuclear Operations

/.Gucwa, Manager,NuclearSafety

and Licensing

/M. H. Googe, Project.

Construction Manager

vt. D. Groover, Quality

Assurance Site Manager -

Construction

/J. A. Bailey, Project Licensing

Manaaer

/G. F. Trowbridge, Esq. , Shaw,

d.Pittman,PottsandTrowbridge

W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

/E. L. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

/.E. Joiner,Troutman, Sanders,

Lockerman and Ashmore

/J.G.Ledbetter, Commissioner,

/.DepartmentofHumanResources

C H. Badger, Office of Planning

l

f and Budget

4. Kirkland, III,~ Counsel,

Office of the Consumer's Utility

. f Council

/D. C. Teper, Georgians Against

Nuclear Energy

v$. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

' Panel

l cc w/ encl: (cont'd page 3)

4

- - _ _ _ _ _ -

g - - -.

,

" ' *

. .

Georgia Power Company 3 /,pril 30, 198a

Ac_w/ encl (Cont'_d):

/Dr. O. H. Paris, Administrative Judge

~

Atomic Safety and Licensing Board

Panel

/G. A. Linenberger, Jr. , Administrative Judge -

Atomic Safety and Licensing Board

Panel

YB.P. Garde,CitizensClinic, Director -

Government Accountability Project'

bec w/ encl:

s E. Reis, ELD

v W. M. Hill, IE

y M. Miller, NRR-

vW. Brach, EDO

vM. Sinkule, RII

vf. Christnot, RII

v5RC Resident Inspector-

d ocument Control Desk

v' State of Georgia

i

_ - -

or,

RII att

RII

RII,

RII RII

RII

MS ue

tm BDe br ian AGib

FM

3/ir,/86 3/w/86 3 /86 3/p86 /j/86

R RI

RII RII

Novak, NRR BGrimes, IE

VBr n1 R g

/g/86

1/ /86

q/p/86 ph

J /29

-

l

od/f5 G

L