ML20197B751
| ML20197B751 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/30/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20197B754 | List: |
| References | |
| NUDOCS 8605130111 | |
| Download: ML20197B751 (3) | |
See also: IR 05000424/1985055
Text
'
.
4
.
p orgia Power Company
April 30, 1986
vATTN:
Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW OF V0GTLE READINESS REVIEW MODULE 5, OPERATIONS
ORGANIZATION AND ADMINISTRATION - REPORT NO. 50-424/85-55
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC on August 19, 1985.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews were also conducted in NRC Bethesda offices, and the findings
from these reviews have also been discussed with your staff.
Areas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
This module does not address plant operating Technical Specifications which will
be reviewed separately.
The primary results of module 5 reviews and inspections are provided in the
summary and conclusions sections of the enclosed report. Within the findings
section, several deficiencies are identified. Your attention is invited to these
matters which will be pursued during future reviews and inspections.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the specific programs reviewed by the NRC are
acceptable and comply with applicable regulatory requirements. Additionally, we
have determined +. hat you currently have controls and processes in place which
should assure proper implementation of all programs associated with operations
organization and administration and which will be verified during conduct of the
normal Near Term Operating License inspection program.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGWA1. SIGNED BYi
L NEl.SCII GRACE
J. Nelson Grace
Regional Administrator
Enclosure:
Inspection Report No. 50-424/85-55
cc w/ enc 1: (see page 2)
8605130111 860430
ADOCK 05000424
G
90\\
' '
,
_ _ _ _ _ _ _ _ _ _ _ _ _
_o -
'
-
,
Georgia ~ Power Company
-2
April 30, 1986
cc w/ enc 1:
vit. E. Conway, Senior Vice President &
Project Director
A . O._ Foster, Vice President, Project
-d. Support
D. Rice, Vice President, Project
Engineering
d . H. Pinson, Vice President, Project
Construction
A . T. Beckham, Vice President &
General Manager.- Operations
v/R. A. Thomas, Vice President,
Licensing
d.W. Hayes,VogtleQuality
h.AsturanceManager-
l
C. Ramsey, Manager -
Readiness Review
/ G. B. Bockhold, General Manager,
.
Nuclear Operations
/.Gucwa, Manager,NuclearSafety
and Licensing
/M. H. Googe, Project.
Construction Manager
vt. D. Groover, Quality
Assurance Site Manager -
Construction
/J. A. Bailey, Project Licensing
Manaaer
/G. F. Trowbridge, Esq. , Shaw,
d.Pittman,PottsandTrowbridge
W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
/E. L. Blake, Jr. , Esq. , Shaw,
Pittman, Potts and Trowbridge
/.E. Joiner,Troutman, Sanders,
Lockerman and Ashmore
/J.G.Ledbetter, Commissioner,
/.DepartmentofHumanResources
C
H. Badger, Office of Planning
l
f and Budget
4. Kirkland, III,~ Counsel,
Office of the Consumer's Utility
. f Council
/D. C. Teper, Georgians Against
Nuclear Energy
v$. B. Margulies, Esq. , Chairman,
Atomic Safety and Licensing Board
' Panel
l
cc w/ encl: (cont'd page 3)
4
- - _ _ _ _ _ -
g
-
-
-.
,
" '
.
.
Georgia Power Company
3
/,pril 30, 198a
Ac_w/ encl (Cont'_d):
/Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
~
Panel
/G. A. Linenberger, Jr. , Administrative Judge -
Atomic Safety and Licensing Board
Panel
YB.P. Garde,CitizensClinic, Director
-
Government Accountability Project'
bec w/ encl:
s E. Reis, ELD
v W. M. Hill, IE
y M. Miller, NRR-
vW. Brach, EDO
vM. Sinkule, RII
vf. Christnot, RII
v5RC Resident Inspector-
d ocument Control Desk
v' State of Georgia
i
_ -
-
RII
att
or,
RII
RII
RII
RII,
RII
br ian
AGib
MS
ue
3/ir,/86
3/w/86
3
/86
3/p86
/j/86
FM
tm
BDe
RII
RII
R
RI
Novak, NRR
BGrimes, IE
VBr n1
R
g
1/ /86
q/p/86
ph
/g/86
l
J /29
-
od/f5
G
L