Forwards Insp Rept 50-424/86-30 on 860312.Activity Control Programs for Implementation of Design & Const Requirements for Module 13C, Post-Tensioned Containment Structure Acceptable
ML20197B151
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/17/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20197B158 List:
References
NUDOCS 8610280097
Download: ML20197B151 (3)


See also: IR 05000424/1986030

Text

L C(l0Q

'.

,

OCT 171986

Docket No. 50-424

License No. CPPR-108

Georgia Powf,p Company

ATTN:

V. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO.13C, POST-TENSIONED

CONTAINMENT (NRC INSPECTION REPORT N0. 50-424/86-30)

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on March 12, 1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress and

review of your licensing commitments.

The results of Module No.13C reviews and inspections are provided in the Summary

and Conclusions Sections of the enclosed report.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the applicant's activity control programs for the

implementation of the design and construction requirements for the post-tensioned

containment structure for Vogtle 1 are acceptable and comply with applicable

regulatory requirements.

The conclusions within the report are based upon information currently available

to the inspectors and reviewers.

Should information subsequently become

available which was not considered during this review or which conflicts with

earlier information, it will be evaluated to determine what effects it may have

on the above conclusion.

ObxShoOo424

PDR

!

i

I

.

..

.

Georgia Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

OPf>I"1 IN

j. te.S03 GRM

J. Nelson Grace

Regional Administrator

Enclosure:

NRC Inspection Report

,cg w/ enc 1:

IE. E. Conway, Senior Vice President &

uProjectDirector

LIV. D. Foster, Vice President, Project

@P.D. Rice,VicePresident, Project

pport

.

Jngineering

R. H. Pinson, Vice President, Project

Construction

. T. Beckham, Vice President &

.

eneral Manager - Operations

. A. Thomas, Vice President,

,JIcensing

W. S. Read, General Manager,

,1,, Quality Assurance

K. W. Hayes, Vogtle Quality

,fssuranceManager

r. C. Ramsey, Manager -

Readiness Review

IV11. Bockhold, General Manager,

BuclearOperations

,

LV. Gucwa, Manager, Nuclear Safety

, 3nd Licensing

W. H. Googe, Project

, p nstruction Manager

W. D. Groover, Quality

Assurance Site Manager -

,.Jonstruction

kl. A. Bailey, Project Licensing

Gpager

. F. Trowbridge, Esq., Shaw,

@W. Churchill,Esq.,Shaw,tman, Potts and Trowbridge

B.

Pittman, Potts and Trowbridge

$fT.Blake,Jr.,Esq.,Shaw,

Pittman, Potts and Trowbridge

(cc w/ enc 1 cont'd - see page 3)

,

-

-

.

.

Georgia Power Company

3

OCT 171986

(,cy/enci-cont'd)

7. E. Joiner, Troutman, Sanders,

L9skerman and Ashmore

M . Ledbetter, Commissioner,

%partmentofHumanResources

V. H Badger, Office of Planning

Budget

Kirkland, III, Counsel,

Office of the Consumer's utility

er, Georgians Against

g clear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

0

H. Paris, Administrative Judge

Atomic Safety and Licensing Board

inenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

M Garde, Citizens Clinic, Director

Government Accountability Project

bec w/ enc 1:

ei s . 0GC

. Hill, IE

iller, NRR

Jrach, EDO

lbV Sinkule, RII

W Jhristnot, RII

LHftC Resident Inspector

PDocument Control Desk

@ateofGeorgia

.

I

RII /

RIIg6

RI.

RII

RI

,

JJ nahan:lb

TECon on

AR

dt

'G bson VBrownlee

Walk r

09/ /86

Op/g/86

07/'l/86

%

y/ /86 Of/ /

/g/g/86

RII

IE::

NRR

ELD

RII: RA

M

N

M

EChr% % h

Ernst

HSinkule

llGrimes

TNova

istenDury

10/go/86

10/go/86

10/ge/86

10/go/B6