Text
L C(l0Q
'.
,
OCT 171986
Docket No. 50-424
License No. CPPR-108
Georgia Powf,p Company
ATTN:
V. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO.13C, POST-TENSIONED
CONTAINMENT (NRC INSPECTION REPORT N0. 50-424/86-30)
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to the NRC on March 12, 1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Areas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress and
review of your licensing commitments.
The results of Module No.13C reviews and inspections are provided in the Summary
and Conclusions Sections of the enclosed report.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's activity control programs for the
implementation of the design and construction requirements for the post-tensioned
containment structure for Vogtle 1 are acceptable and comply with applicable
regulatory requirements.
The conclusions within the report are based upon information currently available
to the inspectors and reviewers.
Should information subsequently become
available which was not considered during this review or which conflicts with
earlier information, it will be evaluated to determine what effects it may have
on the above conclusion.
ObxShoOo424
!
i
I
.
..
.
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
OPf>I"1 IN
j. te.S03 GRM
J. Nelson Grace
Regional Administrator
Enclosure:
NRC Inspection Report
,cg w/ enc 1:
IE. E. Conway, Senior Vice President &
uProjectDirector
LIV. D. Foster, Vice President, Project
@P.D. Rice,VicePresident, Project
pport
.
Jngineering
R. H. Pinson, Vice President, Project
Construction
. T. Beckham, Vice President &
.
eneral Manager - Operations
. A. Thomas, Vice President,
,JIcensing
W. S. Read, General Manager,
,1,, Quality Assurance
K. W. Hayes, Vogtle Quality
,fssuranceManager
r. C. Ramsey, Manager -
Readiness Review
IV11. Bockhold, General Manager,
BuclearOperations
,
LV. Gucwa, Manager, Nuclear Safety
, 3nd Licensing
W. H. Googe, Project
, p nstruction Manager
W. D. Groover, Quality
Assurance Site Manager -
,.Jonstruction
kl. A. Bailey, Project Licensing
Gpager
. F. Trowbridge, Esq., Shaw,
@W. Churchill,Esq.,Shaw,tman, Potts and Trowbridge
B.
Pittman, Potts and Trowbridge
$fT.Blake,Jr.,Esq.,Shaw,
Pittman, Potts and Trowbridge
(cc w/ enc 1 cont'd - see page 3)
,
-
-
.
.
Georgia Power Company
3
OCT 171986
(,cy/enci-cont'd)
7. E. Joiner, Troutman, Sanders,
L9skerman and Ashmore
M . Ledbetter, Commissioner,
%partmentofHumanResources
V. H Badger, Office of Planning
Budget
Kirkland, III, Counsel,
Office of the Consumer's utility
er, Georgians Against
g clear Energy
M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
0
H. Paris, Administrative Judge
Atomic Safety and Licensing Board
inenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
Panel
M Garde, Citizens Clinic, Director
Government Accountability Project
bec w/ enc 1:
ei s . 0GC
. Hill, IE
iller, NRR
Jrach, EDO
lbV Sinkule, RII
W Jhristnot, RII
LHftC Resident Inspector
PDocument Control Desk
@ateofGeorgia
.
I
RII /
RIIg6
RI.
RII
RI
,
JJ nahan:lb
TECon on
dt
'G bson VBrownlee
Walk r
09/ /86
Op/g/86
07/'l/86
%
y/ /86 Of/ /
/g/g/86
RII
IE::
ELD
RII: RA
M
N
M
EChr% % h
Ernst
HSinkule
llGrimes
TNova
istenDury
10/go/86
10/go/86
10/ge/86
10/go/B6