Forwards Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205 & NOV Re Lack of Understanding or Insensitivity to Regulatory Requirements in Revising Administrative Procedures
ML20197B122
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/18/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cottle W
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20197B127 List:
References
50-498-97-301, 50-499-97-301, NUDOCS 9712230297
Download: ML20197B122 (6)


See also: IR 05000498/1997301

Text

..

--

E

    • "*w

UNtif D ST Af f s

l

,f ,

, ' * ,

NUCLEAR REGULATORY COMMISSION

.

,

-

f

}'

R E GION IV

h '

611 RY AN ?LAZA DRIVE. SUITE 400

.[

AR LINGTON. T[ X AS 76011 8064

^

t.,

December 18,1997

Wilham T. Cottle, President and

Chief Executive Officer

STP Nuclear Operating Company

~

P.O. Box 289

Wadsworth, Texas 77483

-)

SUBJECT: NRC INSFECTION REPORT 50-498/97-331; 50-499/97-301 AND NOTICE OF

VIOLATION

Dear Mr. Cottle:

An NRC inspection was conducted October 20 through December 5,1997, at your South Texas

j

Project Electric Generating Station, Units 1 and 2, reactor facilities. The enclosed report

presents the scope and results of that inspection.

The inspection included an evaluation of six opplicants for reactor operator licenseas and eight

L

applicants for senior operator 4enses. We determined that all applica;sts satisfied the

requirements of 10 CFR Part 55 and the appropriate licenses hrve been issued.

During this inspetion, a violation of NRC requirements was identified. The violation is cited in

the enclosed Notice of Violation (Notice) and the circumstances surrounding this violation are

,

described in detail in the enclosed report. This violation was of concem because it indicated a

potentiailack of understanding or insensitivity to regulatory requirements in revising an

administrative procedure. The NRC has concluded that information regarding the reason for the

violation, the corrective actions taken and planned to correct the violation and prevent

recurrence are already adequately addressed on the docket in the enclosed inspection report.

'

,

Therefore, you ais not required to respond to this letter unless the description therein does not

accurately reflect your corrective actions or your position. In that case, or if you choose to

provide additional information, you should follow the instructions specified in the enclosed

Notice.

We are concerred with your failure to submit an adequate facility and systems walkthrough

portion of the license examination pursuant to NUREG ")21 in a time frame which suoported

the original examination schedule as discussed in Section 05.1.2 of Enclosure 2. We request

that you meet with us to explain how you are revising your practices to develop an adequate

examination within the established time frame for the June 1998 applicants. Please contact Mr,

John Pellet at 817/860-8159 to schedule this meeting.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosurcs and your response will be placed in the NRC Public Document Room (PDR). To the

extent possiNe. your response should not include any personal privacy, proprietary, or

safeguards information so that it can be placed in the PDR without redaction.

g

l

\\

h

9712230297 971218

  • * *

PDR

ADOCK 05000498

G

PDR

'

- - - .

.

. -

_ - . - .

.

-

.

..

b

,

'

- STP Nuclear Operating Company _

-2 -

,

Should you have any' questions conceming this inspection, we will be pleased to discuss them

with you.

Sincerely, .

~

. L

-

,

h Arthu

. Howell lil, Director

l Division of Reactor Safety

~

Docket Nos.: 50-498; 50-499

~ License Nos.: . NPF-76; NPF-80

Enclosures:

1; Notice of Violation

2; NRC Ir.spection Report

.

50-498/97-301; 50-499/S7-301

cc w/ enclosures and Attachments 1-3:

Lawrence E. Martin, Vice President

Nuclear Assurance & Licensing

. STP Nuclear Operating Company

' P.O. Box 289

Wadsworth, Texas 77483

Mr. J. C. Lanier/Mr. A. Ramirez

City cf Austin

Electric Utility Department

721 Barton Springs Road

Austia, Texas 78704 -

Mr. K, J. Fiedler/Mr. M. T Hardt

City Pyblic Service Board

- P.O. Box 1771

San Antonio, Texas 78296

C. R. Crisp /R. L. Balcom

Houston Lighting & Power Company .

P.O; Box 1700 :

..

- Houston, Texas 77251

l,

y

2

-

y

_

,

,c..

_-

e

v..

.-

,

.

STP Nuclear Operating Company

.-3

Jon C. Wood

Matthews & Branscomb

One Alamo Center

106 S. St. Mary's Street, Suite 700

San Antonio, Texas 78205-3692

Jack R. Newman, Esq.

Morgan, Lewis & Bockius

1800 M. Street, N.W.

Washington, D.C. 20036 5869

Mr. G. E. Vaughn/Mr. C. A. Johnson

Cential Power & Light Company

P.O. Box 289

Mail Code: N5012

Wadsworth, Texas 77483

INPO

Records Center

700 Galleria Parkway

Atlanta, Georgia 30339-5957

Bureau of Radiation Control

State of Texas-

1100 West 49th Street

Austin, Texas 78756

Mr. Glenn W. Dishong

Texas Public Utility Commission

7800 Shoal Creek Blvd.

Suite 400N -

Austin, Texas 78757-1024

John Howard, Director

Environmental and Natural Resources Policy

Office of the Governor

P.O. Box 12428

Austin, Texas 78711

Judge, Matagorda County

Matagorda County Courthouse

1700 Seventh Street

Bay City, Texas 77414

.

.

STP Nuclear Operating Company

-4-

Licensing Representative

Houston Lighting & Power Company

Suite 610

Three Metro Center

Bethesda, Maryland 20814

.

.

.

_

._ _ _.

. _ _

__ .

_

_

..

'

STP Nuclear Operating Company

5-

,

E Mail report to T. Frye (TJF) _

E-Mail report to T. Hiltz (TGHJ

E-Meil report to NRR Event Tracking System (IPAS) -

E Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)(IE42) -

,

bec distrib. by RIV w/ Enclosure and Attachments 1-3:

,

Regional Administrator

Resident inspector

DRP Director -

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

R. Bachmann, OGC (MS: 15-B-18)

'L Vick (HOLB/NRR)

bec distnb. by RIV w/ Enclosures and Attachments 1-4:

R. Gallo (HOLB/NRR)

L. Hurley

DOCUMENT NAME: R:\\_STP\\ST7301RP.HFB

To receive copy of document, indicate in box:"C" = Copy without 6nclosures "E" = Copy with enclosures "N = No copy

RIV.RE:OB

E

RE:OB

_;

RE:OB

M

C:OB

J O

C:PBA

-

HFBundy 7467

MEMurphy A6M RELantz %

JLPellet@

JITapia Mm5

12A s/97_

12/11/97

12/ /97

12/ /97

12fL/97 l/'

'

'

D:DRS D)/d

i

ATHow W ' [t

12/,$/97

{

12/ /97

12/ /97

12/ /97

12/ /97-

OFFICIAL RECORD COPY

- .

.

._

-

..

. -

. , _

.-

._

-

l

-: <

j

c'

i

STP Nuclear Operating Company

5-

-

  • -

_

'

F. Mail report to T. Frye (TJF)

- E Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

- E Mail report to Document Control Desk (DOCDESK)

bec to DCD (

1)(IE42)

bec distnb. by RIV w/ Enclosure and Attachments 13:

Regional Administrator

Resident inspector

DRP Director -

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

R. Bachmann, OGC (MS: 15-B-18)

L. Vick (HC'

NRR)

- bec distrib. by RIV w/ Enclosures and Attachments 14:

R. Gallo (HOLB/NRR)

L Hurley

DOCUI AENT NAME: R:\\_,STP\\ST7301RP HFB

To receive copy of document. Indicate in box: "C" a copy ethout enclosures "E" a Copy wtr enclosures "N" = No copy

RIV:RE:OB

E

RE:OB

_

RE
OB

N)

C:OB

) O

C:PBA

,

HFBundy- M

MEMurphy jeM RELantz

fin

JLPellet@

JITapia hLS

12A497

12/11/97

12/ /97

12/ '97

12fD97 ll'

'

'

D:DRS fN[J

{

i-

ATHow W '- d-

12/$97

l

12/ l97

12/ /97

12/ 197

12/197

OFFICIAL RECORD COPY

-g Q([;O k

'

,

. _ __