Forwards Insp Repts 50-254/97-14 & 50-265/97-14 on 970729-0922,notice of Deviation & NOV Re Failure to Follow Procedures in Maint & Fire Protection Areas
ML20197B020
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/16/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Pearce L
COMMONWEALTH EDISON CO.
Shared Package
ML20197B025 List:
References
50-254-97-14, 50-265-97-14, NUDOCS 9712230273
Download: ML20197B020 (4)


See also: IR 05000254/1997014

Text

.

_ . _ . , _ _ _ _ . _ _ _ . _ . _ _ . _ _ _ _ _ . _ _ _ _ _ . _ _ _ . , _ _ _ _ . _

_ _ . _

.i

uNef:3 sTAfss '

I

'"

.[p nap

NUCLEAR RECUL.ATORY COMMISSION

l

g

8

REO!ON 111

I

. {

801 WARPENVILLE ROAD

!

!

LISLE. ILLINOIS 60$324351

\\*****

,

t

December it,1997

>

l

Mr. L W. Pearce.

8He Vlos Presiderd

Quad Cities Station

j

4 -

Commonwealth Edison Company

22710 200th Avenue North

Cordova, IL 61242

'

i

SUBJECT:

NRC INSPECTION REPORT NO. 50 254/97014(DRP), 50 265/g7014(DRP),

j

NOTICE OF DEMATION AND NOTICE OF VIOLATION

j

I

Dear Mr. Penros:

This refers to the inspection conduded on July 2g through September 12,1997, at the

-l

Quad CHies Nuclear Power station. The purpose of the inspection was to determine whethe-

t

activides authortred by the license were conduded safely and in accordance with

,

NRC requirements. During this period routine resident inspections were performed. Based on

j

As inspectors' findings, overall performance at the Quad Clues station was safe. At the

l

conclusion of the inspection, the findings were discussed with those members of your staff

identi6ed in the enclosed report.

!

While overall operator performance was good, operators failed to ensure the performance of

several Technical Spool 6 cation (TS) required surveillances and displayed a lack of rigor in

restoring some degraded equipmerW to a fully operable condition. Mainter,ance activities were

i

conducted in a satisfactory manner in most cases, but were marked by procedure adherence

problems and errors requiring rework. Some addluonal radiation dose was scoumulated as a

result / Engineering personnel failed to establish adequate design basis information and testing

>

requirements for some equipment. Even though fire risk was identifled as being relatively high at

Quad Cities, the inspectors noted an overell insensitivity towards resolution of fire protocuon

>

lasues.

,

Based on the results of this inspection, the NRC has determined that four violations of

'

NRC requirements with multiple examples occurred, in addhion, a devis3on from a commitment

to the NRC was identified. These violations and the deviation are cited in the enclosed Notice of

!

Violation (Notice) and Notice of Deviation (Notice) and the circumstances surrounding them are

described in detail in the attached inspecuon report. The first violation represents a decline in

!

the performance of surveillance testing with five examples of missed Myelliance requirements

'

'

involving the areas of operations, chemistry, maintenance, and engineering. The second

violation involves two examples where inspectors found the acceptance criteria for TS required

surveillance teste to be inadequate. The third violation involves two examples of improp6r

design control related to the 250 volt safety-related battery. The fourth violation was a conoom

i

^ because it involved two examples of failure to follow procedures in the maintenance and fire

protection areas. The deviation is signi6 cant in that it involved a failure to meet a commitment to

i

the NRC that constituted correcove scuon for en equipment problem as documented in a

l

.Lloonsee Event Report.

!

\\\\

9712?30273 97

1[

'

pDR

ADOCK 0

254

'

l

f'

0

.PDR

,

,

'

3

.

_,

. . -

.

-

--

--

.,

. . - . .

- .

- --

.

. _ - - . - - . - . - _ _

__

. _ .

_ -

- .

. - - - -

-

.

L Pearce

2

You are required to respond to this letter and should follow the instructions specified in the

enc 6osed Notices when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements,

in acc / dance with 10 CFR 2.790 of the NRC's " Rubs of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

gj p a waJ '{hj/!** J

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos: 50 254;50 265

License Nos: DPR 29; DPR40

Enclosures:

1.

Notice of Deviation

'

2.

Notice of Violation

3.

Inspection Report

No. 50 254/97014(DRP);

50-265/97014(DRP)

cc w/encis:

O. Kingsley, Nuclear Generation Group

Distribumn:

President and Chief Nuclear Officer

Docket File w/encls

M. Wallace, Senior Vice

OCFO/LFARB w/encls

President, Corporate Services

PUBLIC IE-01 w/enets

,

E. Kraft, Vice President

A. Beach w/encls

BWR Operations

Deputy RA w/encls

Liaison Officer, NOC BOD

Rlll Enf. Coord, w/encls

D. A. Sager, Vice President,

SRI Quad Cities w/oncls

Generation Support

Project Mgr., NRR w/encls

D. Farrar, Nuclear Regulatory

DRP w/encls

Services Manager

TSS w/encls

1. Johnson, Licensing

DRS (2) w/encls

Operations Manager

Rlli PRR w/encls

Document Control Desk Ucensing

RAC1 (E Mall)

D. Cook, Quad Cities Station Manager

CAA1 (E-Mall)

C. C. Peterron, ~4egulatory Affairs

DOCDESK (E-Mail)

Manager

Ricnard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce

Commission -

W. D. Leech, Manager of Nuclear

MidAmerican Energy Company

IUMENT NAME:

G:\\0VAD\\0VA97014.DRP SEE PREVIOUS CONCURRENCES

, y 7 .e

i,

i,.

w . c . a n

= w v.,,.i

r . co n

.

,v

OFFICE

Rlli

I

Rit!

l

Rlli

l

Rlli

l

Rlli

NAME ,_RLarchlet

MRing

RGardner

JGavuta

GGrant

DATE

l12/ /97

12/ /97

12/ /97

12/ /97

12/ /97

-

-

.

.

.

.-

..

.

.

L Psaroe

-2 -

-

in accordance with 10 CFR 2.790 of the NRC's " Rules of Procuos," a copy of this letter, its

enclosures, and y response wth be placed in the NRC Public Document Room.

Sincerely,

,

/s/ T& d " W

-

Geoffrey E. Grant, Director

_

.

Division of Reactor Projects

Docket Noi:

50 254;50-265

License Nos: DPR-29; DPR-30 ~

Enclosures:

1.

Notice of Deviation

.

2.

Notice of Velatior:

3.

Inspection Report

No. 50-254/g7014(DRP);

50 265/g7014(DRP)

1cc w/encis:

O. Kingsley, Nuclear Generation Group '

Distribution:

President and Chief Nuclear Officer '

Docket File w/encls

M. Wallace, Senior Vice

OCFO/LFARB w/encls

President, Corporate Services

PUBLIC IE-01 w/encls

E. Kraft, Vice President

A. Beach w/encls

BWR Operations

Deputy RA w/encls

Liaison Officer, NOC-BOD

Rill Enf. Coord, w/encls

D. A. Sager, Vice President,

SRI Quad Cities w/encls

Generation Support

Project Mgr., NRR w/encls

D. Farrar, Nuc' ear Regulatory

DRP w/encls

Services Manager '

TSS w/encls

1. Johnson, Licensing

DRS (2) w/encls

Operations Manager

Rlli PRR w/encls

y

Document Control Desk-Licensing

RAC1 (E-Mail)

{

D. Cook, Quad Cities Station Manage-

CAA1 (E-Mail)

t,.

C. C. Peterson, Regulatory Affairs

DOCDESK (E-Mail)

')

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

State Liaison Officer

Chairman, Illinois Commerce

- Commission

W. D. Leech, Manager of Nuclear

MidAmerican Energy Company

DOCUMENT NAME: -G:\\ QUAD \\QUA97014.DRP-

.

1.

.

.em. - i,

i

wc.om

u

r.em

=

n. -

C

OFFICE

Rlli

l

Rill

Rill

9 Rill

_ l A/ Rlli -

16,/

-

NAME

RLerch/et LW M Rin y th

RGardner l v

.JGavula@2f

GGrant/fMU

DATE

12/4/97

12ho/97

12/ f /97

12/F/97

12//29I

,_

OFFICIAL RECORD COPY

--

_ _ _ _--____-__-___

_ _ _ _ _ _ _

_ _ _ _

_ - - . ~ .

-

-,

.. .

- . . - -

.

.

-

- _ . - _

- - - . -

L Pearce

2-

You are required to respond to this letter and should follow the instructions specified in the

j

enclosed Notices when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to enses corr,pliance with regulatory

requirements.

in scoordance with 10 CFR 2.790 of the NRC's " Rules of Practice," r copy of this letter, its

enclosures, and your response will be placed in the NRC Public Drament Room.

Sincerely,

k

Geoffrey E. Grant, Director

Division of Reactor Projects

'

Docket Nos: 50-254;50 265

'

License Nos: DPR-29; DPR 30

Enclosures:

1.

Notice of Deviation

2.

Notice of Violation

3.

Inspection Report

No. 50-254/97014(DRP);

50-265/97014(DRP)

cc w/encis:

O. Kingsley, Nuclear Generation Group

President and Chief Nuclear Officer

M. Wallace, Senior Vice

President, Corporate Services

E. Kraft, Vice President

BWR Operations

Usison Officer, NOC-BOD

,

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuclear Regulatory

Services Manager

1. Johnson, Licensing

Operations Managar

Document Control Desk-Licensing

D. Cook, Quad Cities Station Manager

C. C. Peterson, Regulatory Affairs

Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attomey General

. State Liaison Officer.

Chairman, Illinois Commerce

Commission

W. D. Leech, Manager of Nuclear

MidAme,-ican Energy Compcny

,

,.

_ . - .

- - - ,

,

_ - - , ,

,-

,

-

- - - - . . -

.