e r
l DUKE POWER GOMPANY P.O. HOX 33180 h[ y [ + g )EPHONE CHARLOTTE, N.C. 28242 HAL B. TUCKER TEL
, = = =
a
.gg Octohsr 16, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30523
Subject:
Catawba Nuclear Station RII/PKV,PHS 50-413/86-17, 50-414/86-18
Dear Dr. Grace:
Attached is Revision 1 to our response to Violation No. 414/86-18-01, as identified in the subject Inspection Report.
Very truly yours,
/-h'x Hal B. Tucker LPT/39/ sib Attachment xc: NRC Resident Inspector Catawba Nuclear Station 8610270396 861016 ol PDR ADOCK 05000414 4 f/
G PDR
/
l l}
I
f 4
DUKE POWER COMPANY i
RESPONSE TO VIOLATION I
VALVES NOT PROPERLY LOCKED 414/86-18-01, REVISION 1 i
Technical Specification 6.8.1 requires written procedures to be established, implemented, and maintained covering the applicable procedures recommended in Appendix A to Regulatory Guide 1.33, Revision 2.
Various licensee operating procedures require valves to be in specified positions and locked in that position..
Contrary to the above, on April 17, 1986, valves identified as 2SM70, 2SM71, 2SM73, 2SM142, 2CF95, 2CF97, 2CA119, 2CA120, 2BW10, 2WE22, 2ND53, 2NV65, and 2NV76 were not locked as specified in applicable operating procedures.
RESPONSE
1.
Admission or denial of violation:
Duke Power Company admits the violation.
2.
Reasons for violation if admitted:
The method used to secure these valves in their locked l
position is to use a chain and lock to secure the operating handwheel.
Due to the type of operating handle (a straight bar) on most of these valves, it is difficult to secure the valve to prevent it from being repositioned.
A contributing cause is the level of i
attention to detail of the operator at the time the lock and chain are placed.
Valves 2BW10 and 2ND53 are circular type handwheels.
Valve 2BW10 was not required j
to be properly locked at the time the inspector observed j
the valve due to it being tagged as part of an equipment isolation and the chain and lock was removed to verify i
tagged position. (see attached R&R) l 4
3.
Corrective actions taken and results achieved:
All valves were inspected by shift personnel when the inspector identified these valves.
All valves were in the proper position.
Subsequently, all valves were locked except those covered by R&R's.
4.
Corrective actions to be taken to avoid further I
violations:
A.
A new method of securing the valves with straight bar type handwheels is being investigated.
B.
Additional emphasis on properly locking valves is being placed by discussion of this violation with all shifts at a shift Supervisor's meeting.
- Also, in a requal segment of operator training, a topic of the philosophy on locking / locked valves will be i
included.
i C.
The Design Group is reviewing criteria for locking valves.
i
i j
4, 4-5.
Date of full compliance:
Duke Power Company will complete corrective actions by March 31, 1987.
l 4
'Dau xim n.ul t/
17 26 s
"l i q d
, g e, pe ttsid TAGOUT(R&R) RECORD SHEET 26-4380 TAGOUT(R&R) NUMBER:
DATE/ TIME ISSUED:
860328 / 1617 RED TAG WEK9EGAO'XX PAGE i
OF 2
EOuePMENT OR 2DWO10
~
PROCEDURE - SYSTEM FILED WITH SYSTEM TAGGED (R&R)
S/G 2D WET LAYUP RECIRC SUCT ISOL REASON FOR Q) bj bi 3h J
REMOVAL TO I/R RELIEF VLVS 2BWO34 & 2BWO13 b
WORK 31519 OPS 33218 Org SUPERVISOR RESPONSISLE FOR WORK REQUECTS HAINr REMOVAL TS LOG CR ACK TMOUT ORDE D BY
- COPIES CRLOG REMARKS DRAltJ THRil 2DWOii EN tED ED RESTORATION CR ACK TAGS ORDERED TS LOG CRLOG INDEX COPIES COMP REMARKS REMOVED (
)
CL EAR CLEAR RMVD NbV Q YCLEs R l hub DOL l><
/dV'1 TAG EQUIPMENT TAGGED (R&R)
SEQ TAGGED TAG PUT IND SW SEO RE-ORD DATE EQ RETURNED SW NO NO (R&R)
ON (EQ VER L8L NO TURN RMVD TIME TAG IND L8L POS POS) SY PLCD POS SY RMVD RMVD VER REM q'i423 2DWoto o
closed e
jffat
- pp#
p hg) ggz ISO m was S/G 2D WET AYUP RECIRC s M la C
s kl Q
bdw
,0 w
m-2:42 7
'.it< Woos o
etOSED
//$g o
A 2D SUCT X0VER 0
D ddit'd jdph I>
w m,y 21425 2YA009 0
CLOSED
/J/((
y j
0 0 ggfd yg.u o
EH A D ISOL 21426 2DWO41 0
CLOSED
(/2Yd Q
S/G 2D HAKEUP DEtilti
[
g hgf V/C DEAERATOR DISCH PHP
((
W b
/
0
,g,
- 427 21tW015 0
CLOSED
/d N YEbl/ '
M S/G 2D WET LAYUP PECIRC D
g
"'sCn 15oL 8d
]%?.Q azy
__