Forwards RAI Re 970918 Proposed Changes to Safety Limit Min Critical Power Ration for Cycle 10 Operation for Plant
ML20197A476
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/12/1998
From: Hall J
NRC (Affiliation Not Assigned)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
TAC-M99639, NUDOCS 9803090259
Download: ML20197A476 (4)


Text

_ _ _

g -

Mr. Joseph J. Hagan February 12, 1998 Vice Presideri, Operations GGNS Entergy Operations, Inc.

P. O. Box 756

- Port Gibson, MS 39150 SUBJEOT:

- REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED CHANGES TO THE SAFETY LIMIT MINIMUM CRITICAL POWER RATIO FOR CYCLE 10 OPERATION - GRAND GULF NUCLEAR STATION

'(TAC NO. M99639)

Dear Mr. Hagan:

The Nuclear Regulatory Commission staff is reviewing your letter dated September 18,1997, in which you requested changes to the Grr.nd Gulf Nuclear Station Technical Specifications for the safety limit minimum critical power ratio (SLMCPR) for Cycle 10 operation. As discussed in the Enclosure, additional information is required from Entergy Operations, Inc., in order for the staff to complete its review of your request.

i We request that you provide a response within 30 days from the date of this letter. If you have sny questions, please call me at (301) 415-1336.

I Sincerely, OR1GINAL SIGNED BY:

James R. Ha;:, Genior Project Manager Project Directorate IV-1 Division of Reactor Projects lil/lV Office of Nuclear Reactor Regulation Docket No. 50-416 F.nclosure: Request for AdditionalInformation I

cc w/ encl: See next page -

=i DISTRIBUTION-Docket File PUBLIC PD4-1 r/f E. Adensam (EGA1)

J.Donohew T. Gwynn, RIV ACRS OGC (15B18)

C.Hawes

/

JHannon:

J. Hall T ~ Huang

}

Document Name: GG99639.RAI OFC PM/PD4-1 LA/PD4-1 NAME JRHall/vh CHaN DATE ll l2191

)/9198-COPY YES/NO YES/NO hh{[(())h%

OFFICIAL RECORD COPY

,~q CJ

  • a 188u 3*e8N6 lll!EllilIllll P

PDR

a p neugk g

UNITED STATES s

P J

NUCLEAR REGULATORY COMMISSION i

\\*****,o#j WASHINGTON, D.C. 3008H001 February 12, 1998 Mr. Joseph J. Hagan Vice President, Operations GGNS Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED CHANGES TO THE SAFETY LIMIT MINIMUM CRITICAL POWER RATIO FOR CYCLE 10 OPERATION - GRAND GULF NUCLEAR STATION (TAC NO. M99639)

Dear Mr. Hagan:

The Nuclear Regulatory Commission staff le reviewing your letter dated September 18,1997, in which you requested changes to the Grand Gulf Nudear E,tation Technical Specifications for the safety limit minimum critical power ratio (SLMCPR) for Cycle 10 operation. - As discussed in the Enclosure, additional information is required from Entergy Operations, Inc., in order for the staff to complete its review of your request.

We request that you provide a response within 30 days from the date of this letter. If you have any questions, please call me at (301) 4151336.

Sincerely, 5 )k

%I J

s R. Hall, Senior Project Manager ject Directorate IV-1 Division of Reactor Projects lilllV Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

Request for AdditionalInformation cc w/oncl: See next page

Mr. Joseph J. Hagan Entergy Operations, Inc.

Grand Gulf Nuclear Station cc:

Executive Vice President General Manager, GGNS

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box 756 i

P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attomey General Wise, Carter, Child & Ca away Department of Justice P. O. Box 651 State of Louisiana Jackson. MS 49205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Divislor, of Solid Waste Management h

Mississippi Department of Natural Office of the Governor

}

Resources State of Miscissippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attomey General President, Asst. Attomey General Claibome County Board of Supervisors State of Mississippi P. O. Box 339 P. O. Box 22947 Port Gibson, MS 39150 Jackson, MS 39225 Regional Administrator, Region IV Vice President, Operations Support U.S. Nuclear Regulatory Commission Entergy Operations, Inc.

611 Ryan Plaza Drive, Suite 1000 P.O. Box 31995 Arlington, TX 70011 Jackson, MS 39286-1995 Serilor Resident inspector Director, Nuclear Safety U. S. Nuclear Regulatory Commission and Regulatory Affairs Route 2, Box 399 Entergy Operations, Inc.

Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 i

Request for Ad:nionalInformation GGNS Cycle 10 Safety Limit Minimum Critical Power Ratio 1.

Describe the bases and assumptions for the GGNS Cycle 10 SLMCPR analysis with respect to those assumptions for the Cycle 9 SLMCPR analysis and identify the differences and their effects in the applications to the cycle-specific analysis using the approach descibed in GGNS Cycle 9 Safety Limit MCPR Analysis (J11-02863SLMCPR, Revision 1 July 1996). Provide justification for the decrement of the proposed SLMCPRs in Cycle 10 for two-loop and sin 9 e-loop operations compared with those used in the 1

Cycle 9 operation, 2.

Describe the calculational precedures in the cycle specific analysis for Cycle 10 including new set of coefficients based on GE's GEXLO2 for Siemens 9x9-5, uncertainties, and data used to support Cycle 10 analysis, Provide a table to show the impact on the cycle-specific analysis between Cycle 10 and current Cyt.le 9.

4 ENCLOSURE