MONTHYEAR0CAN072004, Withdrawal of Request for Exemption from 10 CFR 50, Appendix B Requirements to Support Application of ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 22020-07-15015 July 2020 Withdrawal of Request for Exemption from 10 CFR 50, Appendix B Requirements to Support Application of ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 Project stage: Withdrawal ML20260H4852020-09-10010 September 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping (L-2020-LLR-0104) Project stage: Acceptance Review ML20293A1842020-11-0404 November 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted Project stage: RAI 0CAN022101, Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-02-22022 February 2021 Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping Project stage: Response to RAI ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping Project stage: RAI ML21141A1822021-05-21021 May 2021 Closed Teleconference with Entergy Operations, Inc. Concerning Proposed Alternative to Allow Use of a Carbon Fiber Reinforced Polymer Composite System at Arkansas Nuclear One, Units 1 and 2 Project stage: Meeting 0CAN052103, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency .2021-05-25025 May 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency . Project stage: Response to RAI 0CAN062101, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling2021-06-15015 June 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Project stage: Response to RAI ML21145A0042021-06-28028 June 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 0CAN072102, Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-07-22022 July 2021 Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping Project stage: Response to RAI ML21225A3012021-08-25025 August 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 0CAN092101, Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-09-14014 September 2021 Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping Project stage: Response to RAI ML21225A5432021-09-23023 September 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21188A0222021-09-30030 September 2021 Approval of Request for Alternative from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPID L-2020-LLR-0104) (Redacted) Project stage: Other 2021-05-25
[Table View] |
Text
10 CFR 50.12 0CAN072004 July 15, 2020 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Withdrawal of Request for Exemption from 10 CFR 50, Appendix B Requirements to Support Application of ASME Code Case N-752, "Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems,Section XI, Division 1" Arkansas Nuclear One, Units 1 and 2 NRC Docket Nos. 50-313, 50-368, and 72-13 Renewed Facility Operating License Nos. DPR-51 and NPF-6
Reference:
1 Entergy Operations, Inc. (Entergy) letter to the U. S. Nuclear Regulatory Commission (NRC), Request for Exemption from 10 CFR 50, Appendix B to Support Application of ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems,Section XI, Division 1, (0CAN052004), dated May 27, 2020 (ML20148M344)
- 2.
NRC email to Riley Keele (Entergy), ANO-1/ANO-2 Acceptance Review Draft Supplemental Information Request - Exemption Request from 10 CFR 50 Appendix B Requirements to Support Application of ASME Code Case N-752 (EPID L-2020-LLE-0093), dated July 1, 2020 In Reference 1, Entergy Operations, Inc. (Entergy) submitted a request for an exemption from 10 CFR 50, Appendix B, to support the use of an alternative to the American Society of Mechanical Engineers (ASME),Section XI, requirements at Arkansas Nuclear One, Units 1 and 2 (ANO-1 and ANO-2, respectively). Specifically, the request is to use the alternate requirements of ASME Code Case N-752.
During acceptance review, the NRC determined that supplemental information was required (Reference 2). On July 7, 2020, Entergy conducted a conference call with the NRC to clarify the requested supplemental information. Based on the discussions during the conference call, Entergy desires to withdraw the Reference 1 request. In lieu of the exemption request, Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing
0CAN072004 Page 2 of 2 Entergy plans to submit a revised Quality Assurance Program Manual for NRC review and approval in accordance with 10 CFR 50.54(a)(4) in support of the application of ASME Code Case N-752.
No new regulatory commitments are included in this submittal.
If there are any questions or if additional information is needed, please contact Riley Keele, Manager, Regulatory Assurance, Arkansas Nuclear One, at 479-858-7826.
Respectfully, ORIGINAL SIGNED BY RON GASTON Ron Gaston RWG/rwc cc:
NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One