ML20196K399

From kanterella
Jump to navigation Jump to search
Special Rept:On 880123,steam Generator B Vibration and Loose Parts Monitor Sys Declared Inoperable.Work Request 268020PS Written to Repair Accelerameter.Repair Will Be Carried Out During Future Outage
ML20196K399
Person / Time
Site: Catawba 
Issue date: 03/03/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8803150301
Download: ML20196K399 (2)


Text

.. _ - _

e D..

DUKE POWER GOMPANY P.O. BOX 30180 CHARLOTTE, N.O. 28949

!!AI, H. TUCKER TELEPHONE vaca enesanswv

@M GNM stuata emoocrvion March 3, 1988 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Catawba Nuclear Station, Unit 1 Docket No. 50-413 Special Report Gentlemen:

Pursuant to Technical Specification 3.3.3.9, please find attached a Special Report concerning the inoperability of Channel I/6 (Steam Generator B) of the Unit 1 Vibration and Loose Parts Monitor System.

Very truly yours,

)

Hal B. Tucker JGT/1486/sbn Attachment xc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II b

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 I

i Mr. P. K. Van Doorn i

NRC Resident Inspector Catawba Nuclear Station I

'8803150301 880303 PDR ADOCK 05000413 S

DCD

s e

SPECIAL REPORT CATAWBA NUCLEAR STATION, UNIT 1 INOPERABILITY OF CIIANNEL Il6 (STEAM GENERATOR B) 0F THE UNIT 1 VIBRATION AND LOOSE PARTS MONITOR SYSTEM AS OF JANUARY 23, 1988 On January 23, 1988, channel //6 (Steam Generator B) of the Unit i Vibration and Loose Parts Monitor System was declared inoperable.

A redundant channel at S/G B (channel //10) remains operable. Work Request 268020PS was written to repair the accelerameter. The repair will be carried out during a future outage.

Since the channel has been inoperable more than 30 days this is reportable to the NRC pursuant to Technical Specification 3.3.3.9.

l j

1 4