ML20196K390
| ML20196K390 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/03/1988 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8803150297 | |
| Download: ML20196K390 (2) | |
Text
.
s.'
^
DUKE POWER GOMPAhT P.O. BOX 33189 CHARLO't'rE, N.C. 28242 IIALH. RICKER TE LEPHONE vsca rammansrv (704)0734 531 NLT-LF43 PaODUCTION March 3, 1988 Document Control Desk U. S. Nuclear Regulatory Commission Washingten, D. C.
20555
Subject:
Catawba Nuclear Station, Unit 1 Docket No. 50-413 Special Report Gentlemen:
Pursuant to Technical Specification 3.3.3.9, please find attached a Special Report concerning the inoperability of Channel Illi (Steam Generator C) of the Unit i Vibration and Looso Parts Monitor System as of January 23, 1988.
Very truly yours, 9/
Y QWC. -
Hal B. Tucker JGT/1485/sbn Attachment xc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Cocunission Region II 101 Marietta Street, NW, Suite 2900 p
Atlanta, Georgia 30323 Mr. P. K. Van Doorn l
NRC Resident Inspector I
g Catawba Nuclear Station G803150297 G80303 n.
PDR ADOCK 05000413 S
lE SPECIAL REPORT CATAWBA NUCLEAR STATION, UNIT 1 INOPERABILITY OF CIIANNEL #11 (STEAM GENERATOR C) 0F THE UNIT 1 VIBRATION AND LOOSE PARTS MONITOR SYSTEM AS OF JANUARY 23, 1988 On January 23, 1988, channel #11 (Steam Generator C) of the Unit i Vibration and Loose Parts Monitor System was declared inoperable.
A redundant channel at S/G C (channel #7) remains operable. Work Request 268030PS was written to repair the accelerameter. The repair will be carried out during a future outage.
Since the channel has been inoperable more than 30 days this is reportable to the NRC pursuant to Technical Specification 3.3.3.9.