ML20196K221
| ML20196K221 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/30/1988 |
| From: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20196K225 | List: |
| References | |
| LIC-88-422, NUDOCS 8807060545 | |
| Download: ML20196K221 (3) | |
Text
__ - _
g J
s Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 2247 402/536 4000 June 30, 1988 LIC-88-422 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from 0 PPD (R. L. Andrews) to NRC (Document Control Desk) dated May 23, 1988 (LIC-88-380) 3.
Letter from 0 PPD (R. L. Andrews) to NRC (Document Control Desk) dated June 2, 1988 (LIC-88-472)
Gentlemen:
SUBJECT:
USAR Update This letter forwards thirteen copies of an update to the Fort Calhoun Station Unit No.1 Updated Safety Analysis Report (USAR).
Copies #4, 12, and 13 have been sent to their respective copy holders.
This update addresses organizational changes at Omaha Public Power Dis.trict (0 PPD) and revises Section 9, Section 12, Appendix A, and Appendix E of the USAR.
Section 9 references Section 12 for fire protection program organizational responsibilities.
Appendix E has been incorporated into Section 12, while Section 12 and Appendix A have been revised and expanded.
The update package is being submitted prior to the annual USAR update to support a proposed Technical Specification (TS) revision.
The proposed TS revision, contained in References 2 and 3, deletes the organizational charts from the TS.
The information contained on these charts is being placed in the USAR, which ensures that this information will still be controlled by the provisions of 10 CFR 50.59 and 10 CFR 50.71.
The organizational changes are scheduled to become effective July 1,1988, with 30 days allowed for procedural implementation, etc.
8807060545 080630 DR ADOCK OSO S
lJ w w4 c mnwn..n ngugopponunn,
U. S. Nuclear Regulatory Commission LIC-88-422 i
Page 2 Additionally, Section 12 was also revised to reflect changes in the training program. The Page Status Summary Sheets for each volume will be sent with the annual USAR update.
Sincerely, sdY'th'uGu6eL>
n R. L. Andrews Division Manager Nuclear Production RLA/me Enclosures cc: LeBoeuf, Lamb, Leiby & MacRae R. D. Martin, NRC Regional Administrator P. D. Milano, NRC Project Manager P. H. Harrell, NRC Senior Resident Inspector l
l I
..w.
..,,,,,,.--,,--e
-,g+e, n,~
,~e.
-w-:----gn~---
l UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
)
)
Omaha Public Power District
)
Docket No. 50-285 (Fort Calhoun Station
)
Unit No. 1)
)
AFFIDAVIT R. L. Andrews, being duly sworn, hereby deposes and says that he is the Division Manager - Nuclear Production of the Omaha Public Power District; that as such he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached update to Section 9, Section 12, Appendix A, and Appendix E of the Fort Calhoun Station Ur.it No. 1, Updated Safety Analysis Report; and that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information, and belief.
$&m R. L. Andrews Division Manager Nuclear Production STATE OF NEBRASKA)
)
ss COUNTY OF DOUGLAS)
Subscribed and sworn to before me, a Natary Public in and for the State of Nebraska on this Ep+h day of June, 1988, d
9'4004 NfARV-State af beheste u,cEf.,YY%
'E Notary Public
_a
.