ML20196K174
| ML20196K174 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/21/1998 |
| From: | Gordon Peterson DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20196K177 | List: |
| References | |
| NUDOCS 9812300081 | |
| Download: ML20196K174 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - -
Duks Energy C:rporatian Catawba Nudear Station L
=
4800 Concord Road York, SC 29745 (803) 831-4251 omCE (803) 831-3426MX
. December 21, 1998 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20565-0001
Subject:
Duke Energy Corporation Catawba Nuclear Station Units 1 and 2 O
Docket Nos. 50-413 and 50-414 Emergency Plan Implementing Procedures Please find enclosed for NRC Staff use and review the following Emergency Plan Implementing Procedures:
RP/0/B/5000/000,
-Spill Response (12/10/98)
HP/0/B/1009/026, On-Shift Offsite Dose Projections (12/16/98)
SH/0/B/2005/001, Emergency Response Offsite Dose Projections (12/16/98)
SH/0/B/2005/002, Protocol for the Field Monitoring Coordinator During Emergency Conditions (12/16/98)
Please delete the following Emergency Plan Implementing Procedure:
HP/0/B/1009/025, Emergency Response Offsite Dose Projections These revisions are being submitted in accordance with 10CFR
- 50. 54 (q) and do not decrease the effectiveness of the Emergency Plan Implementing Procedures or the Emergency Plan.
By copy of this letter, two copies of the above documents are being provided to the NRC, Region II.
If there are any questions, please call Steve Christopher at 803-l 831-4027.
l Very truly yours,
[
((h a
}
Gary R.
Peterson Attachments
~
9812300001 981221 PD'A ADOCK 05000413 F
-N e
d.S. Nuclear Regulatory Commission
~
L'
_ December 21, 1998 Page_-2 xc-(w/ attachments):
L..A.-Reyes 1
.U.S. Nuclear-.; Regulatory Commission t
Regional. Administrator, Region II
' Atlanta Federal Center
- 61'Forsyth St.,
SW, suite 23T85
' Atlanta, GA 30303 (w/o attachments):
P.
S. Tam NRC: Senior Project Manager (CNS)
U.S. Nuclear Regulatory Commission Mail Stop-O-14H25~
Washington,- DC 20555-0001
.D.:J.: Roberts Senior Resident Inspector (CNS)
U.S. Nuclear. Regulatory Commission
- Catawba' Nuclear Site
's
.1 g._'
4'
'f
,., G ' _4 = ?
,~
1 i f'
s 6 f '..
3..
.,I, d
/
h*E@y44N.. i
,y
.c 700-
-sg
+
e 4
.= -
U.S. Nuclear Regulatory Commission December 21, 1998 Page 3 I
bxc (w/o attachments):
Saluda River Electric Corporation i
P. O.
Box 929 Laurens, SC 29630 North Carolina Municipal Power Agency Number 1 P. O. Box 29513 Raleigh, NC 27626-0513 NC Electric Membership Corporation T.
R.
Puryear CN030G Piedmont Municipal Power Agency 121 Village Drive areer, SC 29651 i
S. R. Christopher, CN04EP G.
D.
Gilbert, CN01RC K.
E.
Nicholson, CN01RC RGC Licensing File, CN01RC Electronic Licensing Library, EC050 CN-750.25 i
I l