t c

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-245 UNIT Millstone 1 DATE 880307 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 MONTH FEBRUARY, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 660 17 642 2

660 18 528 3

653 19 659 4

659 20 660 5

660 21 660 6

660 22 661 7

660 23 660 8

660 24 657 I

9 660 25 660 l

10 658 26 660 11 660 27 660 12 660 28 660 13 660 29 660 14 660 30 N/A 15 660 31 N/A 16 659 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

8803150127 880229 i

l kDR ADOCK 05000243 NT l

DCD

\\

l

B OPERATING DATA REPORT DOCKET NO. 50-245 OATE 880307 COMPLETED BY G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 OPERATING STATUS 1.

Unit Name: Millstone 1 l Notes l

2.

Reporting Period: February, 1988 l

l 3.

Licensed Thermal Power (MWt): 2011 l

l 4.

Nameplate Rating (Gross MWe): 662 l

l 5.

Design Electrical Rating (Net MWe): 660 l

l 6.

Maximum Dependable Capacity (Gross MWe): 6841 l

7.

Maximum Dependable Capacity (Net MWe): 654 l

l 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A 10.

Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 696 1,440 151,248 12.

Number Of Hours Reactor Was Critical 696 1,440 117,766 13.

Reactor Reserve Shutdown Hours 0

0 3,283.3 14.

Hours Generator On-Line 696 1,440 114,632.5 15.

Unit Reserve Shutdown Hours 0

0 93.7 16.

Gross Thermal Energy Generated (MWH) 1,386,553

--~ 2,879,331 213,085,426 17.

Gross Elec. Energy Generated (MWH) 475,700 988,300 71,744,504 18.

Net Electrical Energy Generated (MWH) 455,308 945,950 68,460,670 19.

Unit Service Factor 100 100 75.8 20.

Unit Availability Factor 100 100 75.9 21.

Unit Capacity Factor (Using MDC Net) 100 100.4 69.2 22.

Unit Capacity Factor (Using DER Net) 99.1 99.5 68.6 23.

Unit Forced Outage Rate 0

0 11.1 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A 25.

If Shut Down At End Of Report Period, Estimated Date of Startup; N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION

- N/A N/A

i DOCKET NO. 50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 880307 COMPLETED BY G. Newburgh REPORT MONTH FEBRUARY, 1988 TELEPHONE (203) 447-1791 Extension 4400 l

No.

Date Type Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours)

Shutting Fvent Codei Code 5 Action to Down Reactor 3 Report #

Prevent Recurrence 4

N/A i

l

)

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions'-

5:

Scheculed A-Equipment Failure (Exp1ain) Manual for Preparation.of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER). File-D-Regulatory Restriction 4-Continued from (NUREG-0161)

E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction 5

G-Operational Error (Explain)

(Duration = 0)

Exhibit 1 - Same Source H-Other (Explain) 6-Other (Explain)

REFUELING INFORMATION REQUEST 1.

Name of facility:

Millstone 1 2.

Scheduled date for next refueling shutdown:

MARCH, 1989 3.

Schedule date for restart following reftaling: MAY, 198S 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes, Technical Specification Changes Regarding:

(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.

Scheduled date(s) for submitting licensing action and supporting information:

Summer 1988 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

196 GE8B Fuel Assemblies 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: (a) 580 (b) 1732 8.

The present licensed spent fuel pool storage capacity and the size of any increase in liccused storage capacity that has been requested or is planned, in number of fuel assemblies:

2184 Assemblies 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1987, Spent Fuel pool, Full Core Off load Capability is Reached.

Temporary rack approved for installation if required; plans for additional capacity in progress.

. e 9

f l

8-1 General Offices

'dr',7[

,'i,$i7= c5.

P.O. BOX 270 m.m.. e wa ceaa' HARTFORD. CONNECTICUT o6141-o270 5%,[C.'LT.CT.

(203) 66 5 5000 L

L J

March 10, 1988 MP-11608 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Provisional License DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

fikkt, A.L. -

c Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GSN:lfg

Enclosures:

(4)

Regional Administrator, Of fice of Inspection and Erforcement, Region I cc:

Dir ector, Of fice of Inspection and Enforcement, Washington, D. C. (10)

Director, Office of Resource Management William Raymond, Senior Resident Inspector g&M t