NPDES Noncompliance Notification:On 880117-26,BPS Sump Discharge High in Total Suspended Solids.Evaluation/Mod of Procedures in Progress to Prevent Recurrence
ML20196J949
Person / Time
Site: San Onofre 
Issue date: 03/03/1988
From: Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8803150109
Download: ML20196J949 (2)


Text

m/ '2 Southern California Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O. BOX 128 SAN CLEMENTE. CALIFORNI A 92672 H E. MORGAN TELEPHONE ST ATION MANAGtm

- (7 t al 368 4241 March 3, 1988 U. S. Nuclear Regulatory Commission Dxument Control Desk Washington, D.C.

20555

SUBJECT:

Docket No. 50-362 Report of NPDES Permit Violation San Onofre Nuclear Generating Station, Unit 3 Pursuant to Section 3.2 of Appendix B, Environmental Protection Plan, Operating License No. ~ NPF-15 for San onofre Unit 3, enclosed is a copy of the January 1988 monthly NPDES report summary which includes a description of a violation of the San Onofre Unit 3 NPDES Permit.

If you require any additional information, please so advise.

Sincerely, d

Enclosure cc:

F. R. Huey (USNRC Senior Resident Inspection, Units 1, 2, and 3)

J. B. Hartin (Regional Administrator, USNRC Region V) r c+.

8803150109 880303 y

1 PDR ADOCK 05000362 S

DCD

e s

Southern California Edison Company PO Box 120 SAN CLEMENTE. CALIFORNIA 92672 O MATz february 25, 1988

" u "~

MAN 4GER 1714) 368 6631 OPE R4 f f0NS ANO MalN T E N A NCE SUPPopf Mr. Ladin Delaney, Executive Officer California Regional Water Quality Control Board San Diego Region 9T/1 Clairemont Mesa Boulevard, suite B San Diego, ralifornia 92124-1331

Dear Mr. Delaney:

Subject:

NPDES Monitoring Report San Onofre Nuclear Generating Station, Unit 3 The SON 33 monitoring report covering the month of January is submitted in accordance with the requirements of CRWQCB Order 85-13 (NPDES Permit No.

CA0108181).

A sum ary of the generating unit's status and significant analytical results is provided below.

The unit was in operation with the exception of January 17 throu6h 26.

All sampled water sources were found to be within permit limits, except the BPS sump discharge, which was high in total suspended solids.

Evaluation / codification of procedures is in progress to prevent recurrence.

Pursuant to order No. 85-13, Reporting Requirement 12, your letter dated June 25, 1985, authorizes the following representative (s) to sign and certify all reports required by this order: Arthur Kneisel, Environmental Engineer.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in the attached document, and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

Sincerely, j

puws x

v Enclosure ce: